Attachment_J-2_ESH_Requirements.pdf
PDF 837 KB Posted
- Attached to
- PSNS Naval Vessel Shop Support
- Solicitation number
- N4523A-17-R-0005
About this file
Attachment J-2_ESH_Requirements
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4523A-17-R-0005-0002_Amendment_2.pdf | ||
| N4523A-17-R-0005_Amendment_1.pdf | ||
| Exhibit_J-3_Price_Proposal_Worksheet_Revised_Amdendment_1.xlsx | XLSX spreadsheet | |
| N4523A-17-R-0005_Reference_Materials.zip | ZIP file | |
| Exhibit_J-4_CDRL_A001.pdf | ||
| N4523A-17-R-0005_RFP_MAC_Shop_Support.pdf | ||
| Exhibit_J-2_CONTRACT_PERFORMANCE_DATA_SHEET_N4523A-17-R-0005.doc | DOC document | |
| Attachment_J-1_Pre-Proposal_Information_(PPI)_Form.doc | DOC document | |
| Exhibit_J-5_CDRL_A002.pdf | ||
| Exhibit_J-3_Price_Proposal_Worksheet.xlsx | XLSX spreadsheet | |
| Exhibit_J-1_DD254_N4523A-17-R-0005.pdf | ||
| Exhibit_J-6_CDRL_A003.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
PUGET SOUND NAVAL SHIPYARD
AND INTERMEDIATE MAINTENANCE FACILITY
1400 FARRAGUT AVENUE
BREMERTON, WASHINGTON 98314-5001 IN REPLY REFER TO
Ser 106/0077
May 10, 2013
MEMORANDUM
From: Director, Environmental, Safety, and Health Office
(Code 106)
To: Director, Industry Management Department (Code 400)
Subj: ENVIRONMENT, SAFETY, AND HEALTH REQUIREMENTS FOR
CONTRACTORS PERFORMING SHIPBOARD WORK AT THE
BREMERTON NAVAL COMPLEX
Ref: (a) Environment, Safety, and Health (ESH)
Requirements for the Bremerton Naval Complex as amended 15 September 2010
Encl: (1) General Occupational Safety and Health
Requirements for the Bremerton Naval Complex
(BNC), Local Standard Item 099-01NW
(2) General Contractor Environmental Protection
Requirements for Bremerton Naval Complex
(BNC), Local Standard Item 099-02NW
(3) General Contractor Air Pollution Control and
Reporting Requirements for Bremerton Naval Complex
(BNC), Local Standard Item 099-03NW
(4) General Contractor Hazardous Material Requirements for Bremerton Naval Complex (BNC), Local Standard
Item 099-04NW
(5) General Contractor Water Pollution and Spill
Prevention Requirements for Bremerton Naval Complex
(BNC), Local Standard Item 099-05NW
(6) General Contractor Waste Management Requirements for
Bremerton Naval Complex (BNC), Local Standard Item
099-06NW
(7) General Contractor Solid Waste Management
Requirements for Bremerton Naval Complex (BNC), Local Standard Item 099-07NW
(8) Forms, Local Standard Item 099-08NW
Enclosure (1)
GENERAL OCCUPATIONAL SAFETY AND HEALTH REQUIREMENTS FOR THE
BREMERTON NAVAL COMPLEX (BNC), LOCAL STANDARD ITEM 099-01NW
Page 1 of 17 ITEM NO: 099-01NW
FY-13
NORTHWEST REGIONAL MAINTENANCE CENTER
LOCAL STANDARD ITEM
ITEM NO: 099-01NW
DATE: 03/30/2013
CATEGORY: ___I____
1 SCOPE
1.1 Title: General Occupational Safety and Health Requirements for the Bremerton Naval Complex (BNC)
2 REFERENCES
2.1 NAVSEA Standard Items
2.2 29 CFR 1910, General Industry Standards
2.3 29 CFR 1915, Shipyard Industry Standards
2.4 0905-LP-485-6010, Control of Testing and Ship Conditions
2.5 S0400-AD-URM-010/TUM, Tag-Out Users Manual
2.6 OSHE Control Manual 250 Rev G
2.7 NAVSUP Publication 538, Management of Materials Handling
Equipment (MHE)
2.8 NAVFAC P300, Management of Civil Engineering Support Equipment
2.9 Local Standard Item 099-08NW
3 REQUIREMENTS
3.1 Accomplish the requirements of references 2.1, 2.2, 2.3, 2.4, 2.5, 2.6, 2.7, and 2.8.
3.2 Voluntary Protection Program (VPP)
3.2.1 Inform employees that PSNS & IMF is a VPP Star site in
Occupational Safety and Health Administration’s (OSHA) VPP. Information about VPP can be found at http://www.osha.gov/dcsp/vpp/index.html.
3.2.2 Ensure all personnel, including supervisors and
subcontractors, are aware of the facility specific requirements specified in this local standard item. Failure to comply with or incurring repeated violations of local, State, or Federal regulations can result in the violator(s) losing access to the BNC or the operation being suspended until properly trained personnel are provided. Provide certificate(s) of training upon request by the SUPERVISOR.
Page 2 of 17 ITEM NO: 099-01NW
3.2.3 Contractors who have worked at the BNC a total of 1,000 or more hours in at least one calendar quarter are required to submit the OSHA
300A summary report for injuries that occurred at the BNC. Write the name of the facility on the OSHA 300A summary report form. The OSHA 300A summary report will be submitted to the SUPERVISOR by the end of the project or by 10
January for the previous calendar year, whichever comes first. Negative reporting is required.
3.2.4 Conduct routine self-inspections of the work and non-work areas under the contractor's cognizance and document timely identification, correction, and tracking of hazards. Provide documentation upon request to the SUPERVISOR.
3.2.5 Conduct all work in accordance with references 2.1 through
2.8. Provide and ensure employees use OSHA-approved personal protective safety equipment (i.e. hard-hats, steel-toe safety shoes, safety glasses, and hearing protection).
3.2.6 Comply with posted signs for Personal Protective Equipment (PPE) in facilities, general areas, dry docks, and onboard ships.
3.3 Noise
3.3.1 Make the maximum use of low-noise emission equipment as certified by the Environmental Protection Agency (EPA). Provide hazardous noise signs and label equipment wherever work procedures and equipment produce sound-pressure levels greater than 84 dB steady state and/or 140 dB peak sound pressure level for impact or impulse noise, regardless of the duration of the exposure. Signs must indicate the distance from the source that hearing protection is required (e.g. within 25 feet).
3.4 Safety Inspections
3.4.1 Contractor workspaces may be inspected periodically for compliance with OSHA Standards.
3.4.2 Abatement of violations is the responsibility of the
contractor and/or the Government as determined by the SUPERVISOR.
3.5 Hazardous Energy Control.
3.5.1 PSNS & IMF shall provide the contractor or agency with a copy of the lockout/tags plus program instruction.
3.5.2 Comply with the requirements of Naval Sea Systems Command (NAVSEA) Standard Item 009-24.
3.5.3 Any evolution (maintenance, testing, or operation) being performed where energized circuits are readily accessible by incidental contact with tools or personnel is defined as work on energized gear and will require a Process Control Procedure (PCP) IAW 009-09 requirements and format.
3.6 Interaction with Regulatory Agency
3.6.1 Coordinate all contacts with regulatory agencies with PSNS & IMF Environmental, Safety, and Health Office (Code 106) via the SUPERVISOR.
Page 3 of 17 ITEM NO: 099-01NW
3.6.2 Provide requested documents to the SUPERVISOR for review and forwarding to the requesting agency.
3.6.3 Provide any related correspondence/record of communication between the contractor and regulatory agency to the SUPERVISOR in a timely manner.
3.6.4 Provide assistance to the Safety Office escort and the
Federal OSHA inspector if a complaint is filed.
3.6.5 Fines, levied on the contractor by Federal OSHA offices due to safety/health violation, shall be paid promptly by the contractor.
3.7 Emergency Medical Care
3.7.1 Emergency medical care at BNC for contractor employees who suffer on-the-job injury or disease will be rendered at the rates in effect at the time of treatment. Reimbursement shall be made by the contractor to the Naval Regional Medical Center Collection Agent upon receipt of statement.
3.8 Fire Protection
3.8.1 Ensure employees know the elements from the PSNS & IMF Fire Safety Plan (Attachment A) including recognizing and reporting unsafe conditions, where fire alarms are located, how to activate fire alarms, and how to properly respond to fire. Handle and store all combustible supplies, materials, waste, and trash in a manner that prevents fire or hazards to persons, facilities, and materials. The Fire Protection Plan Basic Elements are found in Attachment A.
3.9 Industrial Ventilation
3.9.1 Local exhaust temporary ventilation shall be used for all thermal cutting, Chrome VI welding processes, and welding (excluding gas tungsten arc welding) in enclosed shipboard spaces in order to remove fumes and gases at their source. Employ exhaust temporary ventilation as needed to maintain a safe/healthful environment in any enclosed space.
3.9.2 Take reasonable means to ensure visible smoke from welding and thermal cutting operations does not accumulate in occupied shipboard enclosed spaces. A combination of general dilution and local exhaust ventilation may be necessary to accomplish this.
3.9.3 No visible smoke, dust, or metal fume should be present at the point of exhaust discharge to the outside air. If any visible emissions are seen coming from a ventilation exhaust, contact Code 106.31 to have the emissions evaluated for compliance.
3.9.4 Shipboard exhaust temporary ventilation systems used for exhausting Toxic contaminants, flammable vapors and inert gas shall be constructed so that ducting within enclosed spaces is under negative pressure
(pressurized ducting shall not be used). Collapsible plastic ducting (also known as “lay flat”) shall not be used in exhaust temporary ventilation systems. All flexible ducting must be fire retardant. The exhaust plume from exhaust temporary ventilation systems shall not be directed at personnel walkways or work areas.
Page 4 of 17 ITEM NO: 099-01NW
3.10 Eating and Drinking
3.10.1 Allow no tools, equipment, or PPE (e.g., hard hats, gloves, tyvek coveralls, etc.) to enter Government designated eating areas and wash hands before entering a Government designated eating area.
3.11 Tobacco Use
3.11.1 Smoke in Designated Smoking Areas (DSA) only. DSAs
are identified by Designated Smoking Area Sign (Attachment B).
3.11.2 E-Cigarettes shall be used in a DSA only.
3.11.3 Smoking by contractors and subcontractors is not
authorized onboard vessels.
3.11.4 Where conflicts arise between the rights of non-
smokers and the rights of smokers, the rights of non-smokers to a smoke-free airspace shall prevail.
3.11.5 Smokeless tobacco is prohibited during meetings, briefings, training sessions, and inspections. Dispose of smokeless tobacco waste in appropriate receptacles and in a sanitary manner. Spitting in wastebaskets, common trash containers, on the ground, or on other structural features out of doors is prohibited. Place saliva and smokeless tobacco waste mixtures in closeable containers and empty reusable containers for smokeless waste in toilets, or dispose of closed containers as common trash.
3.12 Traffic Safety
3.12.1 Motor vehicles.
3.12.1.1 Operate all motor vehicles in accordance with
Washington State law, yield right of way to PSNS & IMF trains, cranes, and material handling equipment, movement is prohibited between 1602 and 1609 hours.
3.12.1.2 Operators shall obtain permission from the
rigger in charge of directing crane movement on piers, around dry docks in areas of crane operations, and near material handling equipment for entry into these areas.
3.12.1.3 Cell phones shall not be used while driving
unless the vehicle is safely parked. Portable headphones, earphones, or other listening devices are prohibited from being worn while driving within the BNC.
3.12.2 Bicycles
3.12.2.1 Bicycles are prohibited from movement between
1602 and 1609 hours. They may be walked during this time frame.
3.12.2.2 Wear bicycle helmets and brightly colored upper
outer garment that is reflective at night, or vests at all times while riding or walking a bicycle.
Page 5 of 17 ITEM NO: 099-01NW
3.12.2.3 All bicycles are required to have a warning
device, front headlight that can be seen at least 500 feet in front, and a rear deflector that can be seen from at least 100 feet when headlights shine on it.
3.12.2.4 Pedestrians are prohibited from wearing
portable headphones, earphones, or other listening devices while jogging, walking, or transiting on Navy property.
3.13 Construction and Material Handling Equipment (MHE).
3.13.1 Upon request, submit training documentation which
validates personnel are qualified to operate the specific type of MHE to which they are assigned to the SUPERVISOR for forwarding to PSNS & IMF
Production Resources Department Code 900S MHE program manager.
3.13.2 Operators must use a “spotter” (observer) to assist
them with load movement where visibility is hampered and in congested areas.
3.13.3 Comply with the following speed limits.
3.13.3.1 7 miles per hour (mph) on main thoroughfares.
3.13.3.2 5 mph in and around pier/dry docks.
3.13.3.3 3 mph in congested work areas
(vehicle/pedestrian traffic/uneven surfaces).
3.13.4 Report all accidents and mishaps immediately to the
PSNS & IMF Code 900S MHE, via the SUPERVISOR.
3.13.5 Contractors are prohibited from operating Government
owned MHE without specific authorization.
3.14 Forklifts
3.14.1 Operators are to know the weight of all loads being
transported.
3.14.2 Loads 10 feet or wider will have flags attached and
reflective tape/paint applied or use lights at night to make load ends visible. Spotters are required.
3.14.3 Forklift operators are prohibited from
pushing/pulling, use of forklift attachments, and overhead rigging from a forklift without written approval from the manufacturer. Submit manufacturer approval documents to PSNS & IMF Code 900S MHE via the SUPERVISOR prior to use.
3.15 Aerial Work Platforms (AWPs)
3.15.1 Maintain materials placed in the platform/basket
within the confines of safety railings.
3.15.2 Wear fall protection equipment.
Page 6 of 17 ITEM NO: 099-01NW
3.15.3 The AWP shall be Cordoned off, barricaded or use a
ground level spotter.
3.15.4 Contractor employees tending lines are to be on the
ground and verify lines are clear and will not snag on obstructions.
3.15.5 Secure when wind speeds exceed manufacturer wind
speed limits.
3.15.6 Obtain wind speed information by contacting the BNC
Port Services Office at telephone number (360) 476-3467.
3.15.7 Maintain on site the manufacturer’s authorization
which allows AWP operations to take place on waterborne vessels/platforms
(barges). Ensure the AWP is properly secured at all times per the manufacturer authorization requirements. Provide a copy of the authorization upon request.
3.15.8 Operators shall maintain the completed pre-
operational checklist on-site for the current day of use. A maximum of two persons (operator and one passenger) are allowed in the basket/platform of contractor operated AWPs and Scissor lifts.
3.15.9 Stow AWPs with the boom lowered to the ground when
not in use.
3.16 Scaffold requirements for contractors.
3.16.1 Scaffolds shall meet the requirements of 29 CFR
1910.28 with additional requirements identified below.
3.16.2 Scaffold ladder floor openings shall be guarded by a
standard railing with standard toe board on all exposed sides, except at entrance to opening. The entrance to the opening shall be guarded with a swinging gate. Scaffold ladder access openings through platform guardrails shall be guarded with a swinging gate.
3.16.3 Clearance for ladders shall be as shown in figure D-3
of 29 CFR 1910.27(c) (4) when unavoidable obstructions are encountered.
3.16.4 For scaffold ladders used to ascend to heights
exceeding 21 feet, each ladder section shall be offset from the adjacent section, and a landing platform shall be provided at each offset.
3.16.5 Ladders shall be positioned perpendicular to the
landing/work platform to the greatest extent practical.
3.16.6 When OSHA/American National Standards Institute
(ANSI) or manufacturer guidelines exist scaffolds shall be designed by a qualified person, and shall be constructed and loaded in accordance with that design. Without OSHA/ANSI or manufacturer guidelines (such as for most
“hanging scaffolds”), scaffolds shall be designed by a registered professional engineer and constructed and loaded in accordance with such designs. A copy of the detailed drawings and specifications for engineered scaffolds, showing the sizes and spacing of members, shall be kept on the job. Calculations for engineered designs shall be made available upon request.
Page 7 of 17 ITEM NO: 099-01NW
3.16.7 A commercially available scaffold tag system shall be
used on all scaffolds. The tagging system shall, as a minimum, consist of red “Danger” tags and green “ok to use” tags. Tags are to be placed on the structure as close to each of the ladder/access points as possible. Any scaffold that is not tagged shall not be used. The red tag shall be applied to indicate to users the scaffold is being dismantled, is not yet completely erected, or for some reason is not safe and shall not be used. The green tag shall be applied by the competent person to indicate the scaffold is safe to use and is compliant with all OSHA regulations and other applicable requirements (ANSI/manufacturer/engineering). Fall protection Personal
Protection Equipment (PPE) shall not be required when a green tag is used.
As a minimum, the green tag will show the following information:
3.16.7.1 The location of the structure.
3.16.7.2 A reference number to identify each structure
if necessary.
3.16.7.3 The date first erected.
3.16.7.4 Who built the scaffold.
3.16.7.5 The competent person’s name and signature.
3.16.7.6 The load rating of the scaffold.
3.17 Paint Removal
3.17.1 Isolate and contain all power sanding, grinding, and
needle-gunning on chromate or lead based paint in order to prevent the spread of contamination to other workers.
3.18 Shipboard Spaces Requiring Competent Person Testing and
Inspection Prior to Entry of Personnel.
3.18.1 Control hot work and entry to those spaces to
preclude damage to the ship or injury to personnel.
3.18.2 Contractor, Shipyard, and Ship’s Force will
coordinate confined space work so that incompatible operations do not occur at the same time.
3.18.3 Where contractors and Navy personnel (civilian and
forces afloat) must physically work together in confined spaces, both the
Navy and the appropriate contractor representative shall conduct separate testing, issue separate permits, and share findings.
3.18.4 During a comparison of contractor and PSNS & IMF
tested spaces, it was noted that contractors do not consistently consider the following spaces to require testing and inspection prior to entry by personnel. This interpretation of the requirements is not consistent with
PSNS & IMF confined space entry. The following spaces are considered confined spaces and they shall be tested and inspected per the requirements specified in reference 2.1 and 2.3.
3.18.4.1 JP-5 Pump Rooms.
Page 8 of 17 ITEM NO: 099-01NW
3.18.4.2 Storage Rooms with vertical ladders.
3.18.4.3 Shaft Alleys.
3.18.4.4 Re-boiler Rooms.
3.18.4.5 Number 1 and 2 Catapult Accumulator Rooms.
3.18.4.6 Steering Gear Room.
3.18.5 Contact the SUPERVISOR for any questions or concerns
relative to deciding whether a space does or does not fall under the requirements of reference 2.1 or 2.3.
3.18.6 Remove competent person certificates and logs at the
completion of work in the space.
3.19 Maintain free access to exit routes for personnel egress
3.19.1 Verify there are no other personnel within a
securable space prior to locking or installing a cover by completing a 100 percent visual space check.
3.19.2 Post a "person working inside a securable space
placard", obtained from the SUPERVISOR, prior to entering a securable space.
Post the placard at the entrance, preferably at the locking mechanism. Write name(s) of persons in the space on the placard. Remove the placard upon leaving the space.
3.19.3 An outside/topside safety watch may be used as an
alternative to placards. The safety watch must be at the entrance to the securable space to identify that personnel are working inside and prevent the space from being closed and locked.
4 NOTES
4.1 Local Standard Item Requirements apply to Prime Contractors and their subcontractors.
4.2 BNC includes Puget Sound Naval Shipyard & Intermediate
Maintenance Facility PSNS&IMF Bremerton site and Naval Base Kitsap (NBK) at
Bremerton.
4.3 All personnel working at BNC have the authority to stop the contractor for life and health, environmental concerns (like discharges), and damage to the ship or naval property. The SUPERVISOR will be informed as soon as practicable.
4.4 The SUPERVISOR will consult with PSNS & IMF Code 106 for
clarification of any requirements specified in this local standard item.
4.5 Coordination of Confined Space Certificates at Puget Sound Naval
Shipyard & Intermediate Maintenance Facility (PSNS&IMF) is performed by the
Project Tank Office. Contact the SUPERVISOR for any questions concerning coordination of Confined Space Certificates.
Page 9 of 17 ITEM NO: 099-01NW
This Page Intentionally Left Blank
Page 10 of 17 ITEM NO: 099-01NW
Attachment A
FIRE SAFETY PLAN
Ref: (a) 29 CFR 1915, Subpart P, Fire Protection in Shipyard Employment
(b) PSNS&IMFINST P5100.66B, Volume II, Chapter 12, Hot Work Safety
(c) PSNS&IMFINST 11320.2B, Fire Prevention and Protection for
Radioactive Material Storage Areas and Radiologically Controlled Areas, Nuclear Ships and Submarines
(d) National Fire Protection Association (NFPA) 70, National
Electrical Code
(e) 29 CFR 1910.301-399, Subpart S, Electrical
1. Purpose
a. To provide fire safety requirements to protect all employees engaged in work aboard vessels and vessel sections and on land-side operations, including fire hazards and fire response activities at PSNS & IMF Bremerton site and Ship Repair Work Regional Maintenance Center, per references (a) through (e) and this manual.
b. Contractors working at PSNS & IMF shall have a Fire Safety Plan consistent with the PSNS & IMF plan and will comply with references (a) through (e). Contract personnel will advise PSNS & IMF of any unsafe or fire-related hazards and what is being done to address the unsafe hazard/condition.
2. Scope. The requirements apply to PSNS & IMF Bremerton site and Regional
Maintenance Center.
3. Procedures
a. Work site fire hazards and properly controls
(1) Fire hazards include:
(a) Shipboard fire hazards at PSNS & IMF include hot work such as flame heating, welding, grinding, and any other operation that produces temperatures of 400 degrees Fahrenheit or higher. Operations not producing sparks or flame and non-explosive-proof equipment such as lights, fixtures, or motors are not fire hazards (i.e., not considered hot work) unless occurring in the presence of flammable liquids or in a flammable atmosphere. High-energy sparks or slag can be thrown or dropped at the work site or produce heat that can be transferred through the deck, bulkhead, or structure not visible to the hot worker. This may occur from flame cutting, shielded metal arc welding, gas metal arc welding, plasma arc cutting, carbon arc cutting, and thermal spraying.
(b) In buildings, the Fire Department approves specific areas for hot work via Hot Work Permits. Current permissible areas include the Shipfitter Shop, Welding Shop, and burn slabs at Buildings 460 and 368
Bremerton site. Fire hazards in these areas include oxyfuel cutting, carbon arc cutting, shielded metal arc welding, gas metal arc welding, gas tungsten arc welding, brazing, soldering, and grinding. Other common potential sources of ignition in occupied buildings include electrical appliances, Page 11 of 17 ITEM NO: 099-01NW motors, fixtures, wiring, as well as non-fixed heating devices (e.g., coffee makers, hot plates, etc.). With the exception of the permitted hot work areas above, open-flame devices, candles, oil lamps, etc., are prohibited.
(2) Controlling Fire Hazards
(a) Combustible materials are removed within 35 feet of hot work in the horizontal and vertical direction or protected with Fire-
Resistant (FR) materials.
(b) Flammable operations are separated from hot work by 50 feet (minimum), and further for more restrictive operations (e.g., 200 feet for gasoline transfer).
(c) Paint, surface coatings, insulation, etc., are stripped back safe distances from welding and cutting operations.
(d) Protective FR containments, guards, curtains, or metal are used to isolate hot work products such as sparks, slag, dross, weld spatter, or grinding dust.
(e) Fire watches are always posted for carbon arc cutting, plasma arc cutting, gas metal or flux core arc welding, shielded metal arc welding, oxy fuel cutting, and thermal spraying. For other hot work operations an evaluation is conducted and fire watches are posted if any of the following conditions exist:
1. Slag, weld spatter, or sparks might pass through an opening and cause a fire.
2. Combustible materials are closer than 35 feet to the hot work in either the horizontal or vertical direction that cannot be removed, protected with flameproof covers, or otherwise shielded with metal or fire-resistant guards or curtains.
3. The hot work is carried out on or near insulation, combustible coatings, or sandwich-type construction that cannot be inerted.
4. Combustible materials are adjacent to the opposite sides of bulkheads, decks, overheads, metal partitions, or sandwich-type construction that may be ignited by conduction or radiation.
5. The hot work is close enough to cause ignition through heat radiation or conduction on insulated pipes, bulkheads, decks, partitions, overheads, or combustible materials and/or coatings.
6. The work is close enough to unprotected combustible pipe or cable runs to cause ignition.
7. There is a gas free certificate that requires a fire watch be posted.
(f) In buildings the following general fire safety precautions are taken:
1. All electrical appliances, fixtures, and wiring are installed and maintained by qualified personnel per references (d) and (e).
Page 12 of 17 ITEM NO: 099-01NW
2. Defective electrical cords, light fixtures, appliances, and switches are either repaired or removed immediately. Missing or damaged electrical faceplate covers are replaced.
3. Electrical motors are maintained in a manner free from accumulation of oil, dirt, waste, and other debris that may create a fire hazard.
4. Extension cords are not used as a substitute for permanent wiring, only for temporary use as with portable appliances. They must be plugged directly into approved receptacles, power taps, or multi-plug adapters; serve only one appliance; be properly grounded; be properly UL-rated for the appliance they are serving; and be maintained in good condition.
5. Power panels have a clear and unobstructed means of access, with a minimum width of 36 inches, and are closed at all times.
6. Small appliances are located with adequate clearance from combustible materials, or thermal-limiting controls or shields and enclosures are used for protection. Automatic timers are prohibited.
(3) Teaching Select Employees How to Use Fire Protection Equipment:
(a) PSNS & IMF employees and Ship’s Force are trained with course ATMS 4314/4314PRAC, and it is documented in the Automated Training
Management System (ATMS). Course content includes terms and definitions, classification of fires, fire watch responsibilities, hot work mechanic responsibilities, hazards of combustion fires, combating fires, Personal
Protection Equipment (PPE), and the theory and operation of fire extinguishers. Course completion includes a practical test of extinguishing a demonstration fire using a water spray hose and a CO2 fire extinguisher.
(b) Fire watches receive initial training and annual refresher training.
(4) Types of Fire Protection Equipment and Systems for Controlling Fires:
(a) Shipboard systems used by fire watches include pressurized water hoses equipped with 3/4-inch pistol grip spray nozzles, portable CO2 fire extinguishers, portable dry chemical fire extinguishers. These are taken directly to the job site for protection against fire for a particular hot work operation(s). On submarines Shop 99 also stages CO2 fire extinguishers on the vessel and at the Casualty Control (CASCON) station
(Bremerton site) while the vessel is in the availability. These fire extinguishers are maintained by Ship’s Force during the industrial availability. On surface vessels the installed damage control equipment is retained onboard and maintained by Ship’s Force damage control personnel during the availability.
(b) Dry docks and piers contain portable fire extinguishers placed in stands and distributed so the travel distance to any extinguisher is 75 feet or less. These are also protected from damage and easily located and accessible. Selection of portable fire extinguishers is determined by the Fire Department, based on the classes of anticipated workplace fires and the size and degree of the hazard.
Page 13 of 17 ITEM NO: 099-01NW
(c) Building (permitted) hot work areas generally have CO2 or
ABC fire extinguishers for fire watches protecting hot work operations.
Buildings also contain installed portable CO2 or ABC fire extinguishers, distributed so that the travel distance to any extinguisher is 75 feet or less.
(d) Permanently installed building fire protection systems include automatic sprinkler systems (primarily wet pipe systems), CO2 extinguishing systems, and dry chemical extinguishing systems designed to discharge after elevated ceiling temperatures are reached.
(e) Systems used by the Fire Department for fire protection include fire hydrants, water mains, standpipes, engine fire pumps, and Class
I dry-pipe standpipe systems. Dry-pipe standpipe systems provide 2 1/2-inch hose connections designed for use by the Fire Department.
(5) Level of Firefighting Capability at Facility:
(a) NAVBASE Kitsap-Bremerton staffs an ambulance, an engine company, and a ladder company. NAVBASE Kitsap-Bremerton also has a Fire
Command Officer and a Hazardous Materials Response Team.
(b) The ship’s fire main system shall be maintained in as ready-for-use condition as possible during availability. When a ship’s fire main system is not operational, an equivalent portable facility in a ready-for-use condition will be installed.
b. Alarm Systems and How to Report Fires.
(1) Any person hearing an alarm in a building should take the following actions:
(a) Warn others and pass the word: FIRE, FIRE, FIRE.
(b) Evacuate the building as expeditiously as possible. Do not use elevators. Do not endanger yourself or others in this effort. Help any personnel who may be in need.
(c) All personnel shall muster in a predetermined location to ensure that everyone has been evacuated and all are accounted for.
Supervisors are responsible for communicating predetermined mustering location to their employees.
(2) Any person hearing an alarm onboard a submarine or noncommissioned ship should take the following actions:
(a) Exit by the nearest route or as directed by the general announcing system or Ship’s Force personnel.
(b) Leave tool bags, equipment, etc., and exit the ship.
(c) Welders shall secure oxy fuel torches at the torch, and if possible, at the cylinders.
(d) All personnel shall assist in clearing exit passageways of obstructions.
Page 14 of 17 ITEM NO: 099-01NW
(e) After evacuation, personnel shall muster at the nearest
Emergency Hold Area (nominally identified as the northwest corner of the dry dock) at Bremerton site, or at their respective shop areas. Personnel muster results shall be reported to the Incident Commander (IC). If any personnel are not accounted for, information shall be provided to the IC.
(3) Any person hearing an alarm onboard a commissioned surface ship should take the following actions:
(a) Stop work in progress and listen for announcements, which will follow all alarms. Follow directions given by Ship’s Force or Watch
Standers. Directions may localize the affected compartments/fire zone boundaries and area that require evacuation.
(b) If directed to leave the space:
1. Exit by the nearest route or as directed by the general announcing system or Ship’s Force personnel.
2. Leave tool bags, equipment, etc., and exit the ship.
3. Welders shall secure oxy fuel torches at the torch, and if possible, at the cylinders.
(4) Procedures for Responding to, and Reporting Incipient Fires:
(a) Fire watch extinguishes the incipient (small) fire. A smoldering cotton glove, hemp rope, or absorbent are examples of this type of fire. Fire Department notification is not required.
(b) Fire watch extinguishes the incipient fire but calls
Regional Dispatch Center (RDC) at 911 or site-specific telephone numbers for cell phones (476-3333 Bremerton) to request a Fire Inspector for investigation. Emphasize the fire is out and do not sound the alarm.
Examples of this type of fire would be a smoldering keel block or any other object that would be difficult for the hot worker or fire watch to positively ensure the fire is out.
(c) Fire watch attempts to extinguish the fire with their fire extinguisher (no more than one CO2 bottle). If unsuccessful or it is obvious that they need assistance, the alarm is sounded. Notify the Quarterdeck
(active surface ships) or Bremerton site CASCON station (active submarines and recycle projects). Pull a fire alarm and/or call 911.
(5) Procedures for Notifying Employees of a Fire Emergency:
(a) Early discovery of fire is important to limiting injuries and loss of life and property. However, the responsibility of personnel to report a fire immediately will not be accomplished at the risk of personal injury.
(b) Personnel are required to immediately operate the nearest fire alarm box (if available) and dial 911 (or site specific for cell phone
476-3333 Bremerton). Some telephone systems, for example, 478 prefixes, are not connected to RDC. Personnel in these areas shall be familiar with the dialing procedures to report emergencies to RDC.
(6) Procedures for Notifying Fire Response Organizations of a Fire Emergency:
Page 15 of 17 ITEM NO: 099-01NW
(a) RDC is PSNS & IMF’s centralized emergency services dispatch center. Fire alarms connected to the PSNS & IMF alarm system terminate at RDC.
(b) Bremerton Site. When a fire alarm or 911 call comes into
RDC, a simulcast tone goes out and the dispatcher requests “Duty Chief 27, Engine 27, Ladder 28,” which covers NAVBASE Kitsap-Bremerton and PSNS & IMF.
In the event the situation is beyond the capability, a call to Kitsap County
Central Communications (CENCOM) begins an automatic recall of all available resources, closest geographic location first, per Mutual Aid Agreements with
Kitsap County and the City of Bremerton.
(c) When shipboard, after calling RDC inform Ship’s
Force/Quarterdeck.
c. How to Evacuate in Different Emergency Situations. Upon activation of an evacuation alarm, or order to do so, personnel will evacuate in an orderly manner and will muster with their supervisor at the pre-designated muster point as specified in the Building Emergency Plan.
(1) Personnel shall be familiar with the building or area in which they work and be able to identify an alternate means of escape.
(2) In the event of a fire or other emergency in which the evacuation of the building is not required, elevators are programmed to return to the ground floor to be available for use by the Fire Department. Elevators will not normally be available, nor are they considered a safe means to evacuate multi-storied buildings during a fire or other emergency. The means of escape shall be by a stairway. Occupants of buildings equipped with elevators will use stairways to exit the building.
(3) Personnel with specific assignments identified on the Supplementary Fire
Bill will accomplish these tasks, unless such assignments place personnel at risk.
(4) In the event of a fire or other emergency that necessitates evacuation of the ship or dry dock, evacuation should be done in an orderly manner. Voice announcements will follow the evacuation alarm. Personnel should follow directions given by Ship’s Force or Fire Department personnel and proceed to the muster point. Personnel not assigned to the project or contractor personnel should report to the on-site management team and provide names and shop/code or company, and remain until released. Technical support personnel should notify their respective Test House or Trouble Desk prior to going aboard and check out when the work or inspection is complete in order to maintain accountability.
(a) Supervisors will account for all personnel and report to the Fire Command Officer(s)/Incident Commander any personnel that are missing.
(b) Supervisors will ensure that once personnel have evacuated the building, ship, and/or dry dock, that re-entry is prohibited until approved by the Fire Department.
(c) The supervisor(s) will report to the senior Fire Officer on scene any missing personnel and when evacuation is complete.
Page 16 of 17 ITEM NO: 099-01NW
d. Evacuation of Mobility-Impaired Employees.
(1) Mobility-impaired personnel, and those requiring special assistance during building evacuations, shall be provided with a safe means of escape from the building.
(2) Fire Wardens/Building Managers shall notify the Fire Department and RDC of the location and plan for evacuation of mobility-impaired personnel.
(a) Personnel assigned to assist permanently mobility impaired personnel, and their alternates, shall be identified on the Supplementary
Fire Bill.
(b) Personnel who are temporarily mobility-impaired do not need to be reported. However, the worker’s limitation shall be considered when assigning assistance to ensure they are provided with a safe means of escape.
(c) The evacuation procedure of permanently mobility impaired personnel shall be evaluated annually during buildings fire drills.
Point of Contact and Additional Information.
PSNS & IMF Emergency Management Technical Representative (Code 1124), Building 445, (360) 476-3373.
Page 17 of 17 ITEM NO: 099-01NW
Attachment B
DESIGNATED SMOKING AREA SIGN
DESIGNATED
SMOKING
AREA
Enclosure (2)
GENERAL CONTRACTOR ENVIRONMENTAL PROTECTION REQUIREMENTS FOR
BREMERTON NAVAL COMPLEX (BNC), LOCAL STANDARD ITEM 99-02NW
Page 1 of 3 ITEM NO: 099-02NW
ITEM NO: 099-02NW
1.1 Title: General Contractor Environmental Protection Requirements for Bremerton Naval Complex (BNC).
2 REFERENCES
2.1 NAVSEA Standard Items
2.2 NWRMC/BNC Local Standard Items
3 REQUIREMENTS
3.1 Environmental Duties, Responsibility, and Liability
3.1.1 Comply with Local, State, and Federal environmental
regulations and environmental requirements of Reference 2.1 and 2.2 during performance of this contract.
3.1.2 Ensure subcontractors understand and comply with Local, State, and Federal environmental regulations and environmental requirements of Reference 2.1 and 2.2 applicable to their work under this contract.
3.1.3 Minimize pollution or waste generation at the source as much as possible. What cannot be prevented at the source shall be recycled in an environmentally safe manner, whenever feasible.
3.1.4 Notify the SUPERVISOR immediately if the situation is an immediate threat to human health or the environment, call the Regional
Dispatch Center at 911 on a PSNS & IMF telephone or (360) 476-3333 on an outside line or cellular phone.
3.1.5 Failure to comply with or repeated violations of
environmental protection requirements can result in the violator(s) losing access to the BNC or the operation being suspended until the contractor can demonstrate appropriate corrective action has been completed.
3.1.6 Comply with regulatory notices or orders, including payment of any fines attributable to the contractor’s conduct, regardless of whether or not the contractor is the named recipient of the notice, order, or fine.
The Government shall not incur additional cost to the contract due to contractor violation of environmental protection requirements.
3.2 Prior to beginning work schedule a meeting with the SUPERVISOR and Environmental Division (Code 106.3) to discuss the contractor’s plan for environmental protection and to develop a mutual understanding relative to
Page 2 of 3 ITEM NO: 099-02NW details of the plan, required submissions and reports, use of subcontractors, and personnel assignments and duties.
3.3 Personnel Assignments
3.3.1 Ensure all personnel are sufficiently trained to understand and comply with the environmental requirements applicable to their work assignment.
3.3.2 Designate a qualified Environmental Coordinator to ensure environmental compliance for the duration of the contract. The coordinator’s duties are to:
3.3.2.1 Be knowledgeable of federal, state and Local
Environmental Protection regulations.
3.3.2.2 Be knowledgeable of the environmental
protection requirements of Reference 2.1 and 2.2.
3.3.2.3 Conduct frequent inspections of work and
storage areas for cleanliness, appropriate waste, material management, air, and water pollution controls.
3.3.2.4 Ensure complete and accurate records and
documentation of environmental performance are maintained.
3.3.2.5 Be the primary point of contact for PSNS & IMF
environmental personnel for Investigation and resolution of environmental compliance issues, including those involving subcontractors.
3.3.3 Demonstrate qualification of the Environmental Coordinator by providing evidence of one or more of the following, in precedence order:
3.3.3.1 Completion of specialized training in
environmental regulations and requirements applicable to this contract per paragraph 3.4.
3.3.3.2 Documented experience in performing the duties
of paragraph 3.3.2.
3.3.4 Designate a hazardous waste (HW) accumulation area operator (AAO) when the contractor expects to generate and accumulate HW. The duties of the AAO are to control and manage the contractor accumulation area.
3.4 Environmental Training
3.4.1 Provide documentation of training upon request by the
SUPERVISOR.
3.4.2 Ensure all their personnel working at the BNC, their
supervisors, and their subcontractors are aware of the facility-specific environmental requirements specified in Reference 2.2 applicable to their work under this contract.
3.4.3 The contractor’s or subcontractor’s designated Hazardous Waste Accumulation Area Operator must successfully complete the HW and
Polychlorinated Biphenyls (PCB) Management Branch (Code 106.33) contractor training course prior to generation of waste. The Code 106.33 site specific
Page 3 of 3 ITEM NO: 099-02NW training course is provided monthly and is paid (instructor’s fee only) for by the Government. Schedule training via the SUPERVISOR.
3.5 Contact with Regulatory Agencies
3.5.1 All contacts with environmental regulatory agencies shall be coordinated in advance with Code 106.13 via the SUPERVISOR.
3.5.2 Records required to be maintained on site shall be made available to government or regulatory inspectors at the time of inspection.
Other documents requested by a regulatory agency must be turned over to the
SUPERVISOR within 24 hours of the request. Code 106 and the SUPERVISOR will review and forward document(s) to the requesting agency.
3.5.3 Provide the SUPERVISOR copies of correspondence or a
summary of verbal communication, related to this contract, between the contractor and the regulatory agency within 24 hours.
4 NOTES
4.1 Local Standard Item Requirements apply to Prime Contractors and their subcontractors.
4.2 BNC includes Puget Sound Naval Shipyard & Intermediate
Maintenance Facility PSNS&IMF Bremerton site and Naval Base Kitsap (NBK) at
Bremerton.
4.3 The SUPERVISOR will consult with PSNS & IMF, Code 106 for clarification of any requirements specified in this local standard item.
Enclosure (3)
GENERAL CONTRACTOR AIR POLLUTION CONTROL AND REPORTING
REQUIREMENTS FOR BREMERTON NAVAL COMPLEX (BNC),
LOCAL STANDARD ITEM 099-03NW
Page 1 of 5 ITEM NO: 099-03NW
ITEM NO: 099-03NW
1.1 Title: General Contractor Air Pollution Control and Reporting
Requirements for Bremerton Naval Complex (BNC).
2 REFERENCES
2.1 NAVSEA STANDARD ITEMS
2.2 Puget Sound Clean Air Agency (PSCAA) Regulations I, II
2.3 Local Standard Item 099-04NW
2.4 Local Standard Item 099-08NW
3 REQUIREMENTS
3.1 Accomplish the requirements of reference 2.1 and 2.2.
3.2 Notify the SUPERVISOR verbally within two working days, whenever a National Emission Standards for Shipbuilding and Ship Repair (NESHAP) requirement or an Operation and Maintenance (O&M) Plan requirement has not been followed. Provide details of corrective actions taken as specified in the written request.
3.3 Refer to Reference 2.3 for hazardous material approval and reporting requirements.
3.4 Report blast grit usage to the SUPERVISOR per one of the
following criteria:
3.4.1 Either blast nozzle throughput in tons or
3.4.2 Blast nozzle diameter, vessel pressure, media type, number of nozzles, and total hours of operation, or
3.4.3 Via alternate method described in the O and M plan and
approved by Code 106.31.
3.5 Report weld rods and filler metals used (include American Welding
Society type and process).
3.6 Identify, three months prior to start of work, any air pollution generating equipment and any associated air pollution control equipment to be used to Code 106.3 via the SUPERVISOR. Code 106.3 will determine the need
Page 2 of 5 ITEM NO: 099-03NW for a Notice of Construction (NOC)/Order of Approval. The minimum equipment identification requirements are:
3.6.1 For portable (typically skid or trailer mounted) internal combustion engines, identify the manufacturer, model, engine family, engine series, model year, size, brake horsepower, emission rates NOx (g/hp-hr or g/kw-hr) and particulate (g/hp-hr or g/kw-hr), serial number, location, purpose, date engine will arrive, year of manufacture, type of fuel used with fuel specifications (sulfur content, octane number, etc.), initial hour meter reading, and projected date the engine will leave the BNC. Provide documentation of non-road EPA certification (if EPA certified). If an engine may stay on site for 12 months or longer additional rules may apply. Note:
when the cumulative horse power of all government and contractor non road engines reaches >500 HP but less than 2000 HP, PSCAA must be notified prior to operation. When cumulative HP exceeds 2000 HP extensive delays may occur as a written approval must be received from PSCAA prior to operation. All non road engines must use ultra-low sulfur diesel or ultra-low sulfur biodiesel (a sulfur content of 15 ppm or 0.0015% sulfur by weight or less), gasoline, natural gas, propane, liquefied petroleum gas (LPG), hydrogen, ethanol, methanol, or liquefied/compressed natural gas (LNG/CNG).
3.6.2 For abrasive blast and dust control equipment, identify location, job description, manufacturer, equipment type, model, serial number, blast media type it will be controlling (if applicable), filter media manufacturer, model number, and type, CFM rating, reporting method and acceptable differential pressure operating range.
3.6.3 For any equipment not authorized by PSNS & IMF Code 106.31 under existing PSCAA equipment registration or otherwise exempt under PSCAA
Regulation I, coordinate submission of NOC with Code 106.31 via the
SUPERVISOR.
3.6.4 Contractor use of air contaminant generating equipment and air pollution control equipment may be authorized by PSNS & IMF Code 106.31 under existing PSCAA registered operations for abrasive blasting in PSNS &
IMF dry docks. Contact the SUPERVISOR to obtain authorization to utilize existing Order of Approval for pier side abrasive blasting and spray painting operations.
3.7 Submit a copy of the contractor's O&M Plan for all air
contaminant generation equipment to the SUPERVISOR for approval at least ten working days prior to planned use of the equipment. Prepare the O&M plan using the template provided by 106.31 (via the SUPERVISOR) or other suitable format (See Reference 2.4). Any changes to an approved O&M plan shall be submitted to the SUPERVISOR at least five working days prior to planned implementation of the change.
3.7.1 The O&M plan must address, at a minimum, the following
elements:
3.7.1.1 Maintain all equipment in good working order, through following manufacturer's operation and maintenance recommendations.
3.7.1.2 Generation of documentation that the actions of
the O&M plan were completed, e.g., inspections records, documenting the prompt repair of deficiencies, recording preventative measures, etc.
3.7.1.3 Periodic inspections, including but not limited
to, evidence of fugitive emissions.
Page 3 of 5 ITEM NO: 099-03NW
3.7.1.4 Ensure deficiencies are promptly repaired.
Secure operation of such equipment if immediate repairs are not feasible.
3.7.1.5 Identify if visible fugitive emissions are
expected to be generated by the operation. If expected, document the precautions to be used to minimize such emissions, and include a process to ensure those emissions remain below 20% opacity as determined by EPA Method
9.
3.7.1.6 Whenever unexpected visible fugitive emissions
are found, take corrective action or stop operations immediately. If the fugitive emissions cannot be eliminated, submit a change to the O&M Plan to address the actions to be taken to minimize and monitor such emissions as described in 3.7.1.5 above.
3.7.1.7 Include all requirements listed as conditions
on any applicable Orders of Approval for the equipment. Contact the PSNS &
IMF Contracting ESH Manager representative for the project if information is needed as to specific Order of Approval requirements applicable to the equipment. This may include the requirement for a differential pressure gauge installed across filters or specified filter efficiency used in air pollution control equipment.
3.7.2 Abrasive blasting must meet the following requirements:
3.7.2.1 Perform abrasive blasting operations inside an
enclosure equipped with ventilation and emission collection devices.
3.7.2.2 Open blasting within an enclosure is acceptable
with 100 percent containment and negative pressure ventilation with filtration. Post a watch stander to monitor blasting operations to ensure operations are ceased immediately upon the loss of grit or fugitive emissions outside the control area.
3.7.3 Upon the request of the SUPERVISOR, provide any
supplemental documentation that may be necessary for evaluating the O&M plan, such as documentation of filter efficiency, operating manuals, maintenance history, or rental agreements.
3.8 Contact the SUPERVISOR to conduct a checkpoint inspection following approval of the O&M Plan and after completion of equipment setup.
This walk through inspection of the equipment and O&M Plan related paperwork must be accomplished before start of production work.
3.9 During the operation of equipment requiring an O&M plan:
3.9.1 Do not deviate from the approved O&M plan.
3.9.2 Have the O&M plan records available for prompt review, (goal is 20 minutes), when requested by regulatory agencies such as PSCAA, or
PSNS & IMF Code 106 personnel for inspection upon request.
3.9.3 Submit copies of all records, (paper or electronic), required by the O&M plan to the SUPERVISOR within ten calendar days after the end of each month.
3.9.4 Maintain records required by the O&M plan (e.g., inspections/maintenance/corrective actions). These records must include the location, date, time, and name of persons completing the actions. Records
Page 4 of 5 ITEM NO: 099-03NW shall be complete, accurate, and directly traceable to the applicable piece of equipment. Records may be in the form of a logbook.
3.10 Minimize dust emissions by using Best Available Control
Technology (BACT). If visible emissions are observed outside of a building, ship, or dry dock perform an EPA method 9…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .