A17.2 93109551-39624-CSAR-LAC-0002.pdf

PDF 72 KB Posted

Attached to
Cold Spray Repair Service - Throttling Valve Body
Solicitation number
N4523A
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY 0002

FOR OFFICIAL USE ONLY

Cold Spray Application Record (CSAR) (EPD fill in blocks identified by prior to issue) Sheet ____ of ____

(Blocks marked are critical parameters)

1. SHIP/HULL NO.

2. JCN/CONTRACT NO. 3. CWP/REC NO.

NA

4. SYSTEM/COMPONENT

5. DWG

4674165 rev B

6. PART NUMBER

7. DESCRIPTION

Body

8. MATERIAL AND GRADE

CUNI 70/30 (cast), MIL-C-

20159, Type I

9. REPAIR LOCATION

Sealing area in way of pc-14 piston

10. REPAIR CATEGORY

2.C.D

11. QSP NUMBER

4674165.12.02.S

12. PART PREPARATION

PREP DIMENSION

PREP DIMENSION SIGNATURE/BADGE/DATE:

SURFACE FINISH SURFACE PREP METHOD CLEANING METHOD

GRIT TYPE/SIZE GRIT BLAST PRESSURE

SIGNATURE/BADGE/DATE:

13. POWDER

POWDER MATERIAL

CrC-Ni

POWDER SIZE SIEVE SIZE POWDER LOT

POWDER MANUFACTURER

POWDER SPECIFICATION POWDER BAKE TEMP/TIME

PEENING MEDIA

PEENING MEDIA SIZE PEENING MEDIA LOT

BOND LAYER 1

%PEENING MEDIA

SUBSEQUENT BOND LAYERS

BULK BUILD

14. GAS DATA

CARRIER GAS

CARRIER GAS TEMP AND MEASUREMENT LOCATION

FEEDER GAS

FEEDER GAS TEMP AND MEASUREMENT LOCATION

CARRIER GAS MODE:

☐ PRESSURE ☐ FLOW RATE

CARRIER GAS PRESSURE CARRIER GAS FLOW

FEEDER GAS MODE:

☐ PRESSURE ☐ FLOW RATE

FEEDER GAS PRESSURE

FEEDER GAS FLOW

15. APPLICATION DATA

COLD SPRAY SYSTEM

COMPONENT PREHEAT

PREHEAT METHOD

GUN MANIPULATION

☐ ROBOT ☐ HANDHELD

ROBOT BRAND/MODEL ROBOT PROGRAM FILE NAME

NOZZLE COOLING METHOD

POWDER FEED RATE

NOZZLE

STANDOFF

TRAVERSE RATE 1

INCREMENT 1 DEPOSITION ANGLE 1

TRAVERSE RATE 2

INCREMENT 2 DEPOSITION ANGLE 2

TRAVERSE RATE 3

INCREMENT 3 DEPOSITION ANGLE 3

FOR OFFICIAL USE ONLY 0002

FOR OFFICIAL USE ONLY

Cold Spray Application Record (CSAR) (EPD fill in blocks identified by prior to issue) Sheet ____ of ____

(Blocks marked are critical parameters)

16. ADDITIONAL SPRAY

GUN MANIPULATION

☐ ROBOT ☐ HANDHELD

ROBOT BRAND/MODEL ROBOT PROGRAM FILE NAME

NOZZLE COOLING METHOD

POWDER FEED RATE

NOZZLE

STANDOFF

TRAVERSE RATE 1

INCREMENT 1 DEPOSITION ANGLE 1

TRAVERSE RATE 2

INCREMENT 2 DEPOSITION ANGLE 2

TRAVERSE RATE 3

INCREMENT 3 DEPOSITION ANGLE 3

17.

FINAL MACHINED DIMENSION

SIGNATURE/BADGE/DATE

18. TESTING

REQUIRED TEST RESULT INSPECTOR

SIGNATURE/BADGE/DATE

VT ☐ SAT ☐ UNSAT

☒ MACHINE ☐ TAPE ☐ SAT ☐ UNSAT

RING ☐ SAT ☐ UNSAT

☐ PT

☒ NA

☐ SAT ☐ UNSAT

19. REMARKS

Blocks 1, 2, and 4 to be completed by shipyard after completion of cold spray repair.

20. SUPERVISOR SIGNATURE/BADGE/DATE 21. QAS SIGNATURE/BADGE/DATE

File details come from the government source that posted it. Updated .