KEDA_SIOP Industry Day_Slides All_Final_v2.pdf
PDF 10 MB Posted
- Solicitation number
- N4425526R0005_Industry_Day
About this file
This file contains presentation slides from the Kitsap Industrial Readiness Summit and NAVFAC Northwest Shipyard Infrastructure Optimization Program (SIOP) Industry Day, held on August 20 at the Kitsap Conference Center in Bremerton, Washington. The event, organized by the Department of the Navy Naval Facilities Engineering Command (NAVFAC), brought together prime contractors, subcontractors, and small businesses to discuss ongoing and anticipated infrastructure projects at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF). The morning session covered SIOP initiatives nationwide and current construction activities including the Multi-Mission Dry Dock (DD4), seismic upgrades, electrical and mechanical system modernizations, tunnel repairs, and shoreline restoration efforts.
The afternoon session focused on doing business with the government, featuring guidance on navigating federal regulations, small business certifications, and proposal best practices from APEX Accelerator Kitsap Washington. NAVFAC Northwest has established a 47% small business utilization goal for upcoming contracts. Additional topics included Cybersecurity Maturity Model Certification (CMMC) requirements and one-on-one matchmaking opportunities between government representatives and industry participants. This industry day served as an outreach and networking platform to support strategic sourcing for infrastructure modernization projects at the shipyard rather than a formal solicitation with specific response deadlines or award dates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SIOP Industry Day (20-Aug-26)_Sign-In Sheet_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shipyard Infrastructure Optimization Program (SIOP) Across the Nation
Speaker: Bryan Cochran
Shipyard Infrastructure Optimization Program (SIOP)
Program Executive: Mr. Mark Edelson Program Manager: CAPT David Matvay
Briefer: Bryan Cochran; Deputy Director, SIOP Puget Sound Naval Shipyard
Kitsap Industrial Readiness Summit
20 August 2026
Shipyard Infrastructure Optimization Program
CUI
Problem Statement Condition, capacity, and configuration of facilities, dry docks, and equipment at the four public shipyards contribute to inadequate throughput and loss of fleet operational availability.
Shipyards designed for constructing conventional ships are not optimized for repairing the nuclear fleet.
SIOP North Star Enable increased submarine and carrier maintenance throughput by recapitalizing shipyard infrastructure and equipment required to conduct scheduled depot maintenance and by reconfiguring infrastructure layout to deliver reductions in availability durations.
Baseline Performance (2018) Dry dock capability/survivability gaps: insufficient dry docks for VIRGINIA VPM subs and GERALD R. FORD carriers.
Inadequate facilities and equipment led to maintenance delays that contributed to >1,300 lost operational days for carriers and >12,500 lost operational days for submarines. (FY00-16, GAO).
Solution – SIOP
LOE 2: Recapitalize and reconfigure infrastructure for optimization
LOE 3: Modernize Industrial Plant Equipment
LOE 1: Construct and recapitalize dry docks and piers
Program Benefits
Operational ROI Dry docks to support new platforms and fleet maintenance requirements Adequate inventory Dimensions Shore services (power and water)
Facilities Building envelope Life/health/safety, fire protection, seismic
Utilities Capacity to meet total demand Reliability
Financial ROI Baseline of lost operating days from GAO audit Submarine idle time cost of $800K / day
SIOP digital modeling Based on historic performance data Captures industrial processes through the yard Reduces submarine availabilities by average of 118 days across all four shipyards
ROI = The Value of a Submarine at Sea
Return on Investment
Program Initiatives Programmatic approach
• Visibility of entire problem and solution
• Standardization across the four shipyards
• Robust governance
Digitally modelled solutions Contracting methods
• Early contractor involvement
• Economic price adjustments and award fees
• Multi-contract projects
Utilities privatization
Additional Opportunities Progressive design-build (to budget) Eliminate federal environmental permits for military construction Section 2818 & multi-year O&MN for construction Accept technical risk (ATFP, life span, life cycle costs) Private financing of military construction (OMB
Circular A-11)
Continuous Improvement
SIOP Performance
CNO Approved KPPs – 17 August 2023
Capacity Increase Resiliency Increase
Availability Duration Reduction Availability Man Day Reduction
SIOP Capability Delivery
KPP 10 - Reduce dry dock duration and maintenance availibilities Targets reductions of 8% for submarines and 5% for aircraft carriers; 15% and 10% respectively
KPP 11 - Reduce average number of man days for maintenance availibilities Targets reductions of 10% for submarines and 5% for aircraft carriers; 25% and 15% respectively
Dry docks support the class maintenance plans for nuclear ships (quantity, size, power, and cooling)
Dry docks survive seismic and flooding events Pier-side berths to achieve maintenance throughput Facilities and equipment are laid out for efficient ship maintenance Reduced duration of availabilities Reduced man day expenditure
Buildings can be occupied and used (roof, structural integrity, life-safety code, utilities)
Capital equipment is available for use Force protection requirements met Critical functions sustained for 14 days off grid Power Water
Completed 59 facility projects ($1.8B) 340 pieces of industrial plant equipment ($772M )
Work Underway 49 projects ($7B) under construction, including seven dry docks 80 pieces of industrial plant equipment in procurement ($809M ) Three new dry docks under construction; four dry docks are being modernized
SIOP Construction
PNSY Dry Dock 1 Expansion
PSNS Shipyard Electrical Backbone
FY 26 Accomplishments Achieved Gate 4 (configuration baseline) for PNSY and PSNS Completed PHNS central air compressor plant upgrade Completed PSNS Pier 5 restoration Awarded PSNS relocaƟons for seismically vulnerable faciliƟes
Awarded NNSY Dry Dock 3 modernization Received proposals for NNSY electrical privatization Delivered 25-ton portal cranes to PSNS (4 of 4) Delivered plasma cutters to PSNS (3 of 4) Awarded 175-ton portal crane to PNSY (7 of 7)
PNSYNNSYPSNSPHNS
3 / $36M3 / $79M5 / $330M3 / $4MMILCON Design
2 / $1,857M3 / $398M2 / $329M1 / $3,069MMILCON Construction
12 / $21M4 / $6M10 / $4M9 / $44MRM Design
9 / $159M6 / $395M17 / $634M8 / $225MRM Construction
8 / $215M35 / $307M14 / $202M12 / $94MIPE Procurement
23 / $716M11 / $436M16 / $557M9 / $74MConstruction Complete
Dry Docks – New Construction
Avoid Navy $800k per day of idle submarines awaiting maintenance
PHNS Dry Dock 5 PNSY Dry Dock 1 Expansion
Increases PNSY from 3 to 5 submarine dry docks On schedule for FY29 completion; high confidence of completing within authorized amount
Strong Navy and contractor partnership to synchronize construction and ongoing submarine maintenance
Project milestone resequencing will gain 45 days of operational availability for next two LOS ANGELES class refueling, plus a $16M return on investment
Increases PHNS from 2 to 3 VACL Blk V dry docks Project is more than 50% complete; tremie concrete ongoing; dewatering basin next milestone
Senior Navy engagement with parent companies facilitated increased staffing, resources, and delivery of request for equitable adjustment
PSNS Multi-Mission Dry Dock (M2D2)
The PACOM AOR does not have a dry dock to accommodate FORD class depot maintenance
The FORD class has increased power and cooling requirements, different line-loading and dimensions, and reduced lifting access than the NIMITZ class
Multi-contract approach, extensive modeling, collaborative design, and Phase 0 preparations reduce maintenance conflict and acquisition risk
CVN Accessibility to the Pacific
Primary Facilities Delivered Dry Dock Pier 2 Shipyard Support Building Forge & Heat Treatment Facility Radio Hill Complex (laydown area) Shipfitter & Welder Facility
3-Dimensional Design & BIM 130 Revit Models 150 Navisworks Models 6400 Drawing Sheets
The U.S. Navy will construct the nation’s largest repair dry dock to support FORD class aircraft carriers in the Pacific
Dry Docks – Modernization
NNSY Dry Dock 8 NNSY Dry Dock 3PSNS Dry Dock 4
PSNS Dry Dock 4 (ca. 1940) NNSY Dry Dock 8 (ca. 1941) NNSY Dry Dock 3 (ca. 1935)
Modernizes dry dock with comprehensive structural system upgrades to enable VIRGINIA class submarine maintenance
Widens floor for increased efficiency
Rebuilds two circa 1940 berths incapable of supporting ships or cranes
Increases cooling capacity to provide FORD class dry dock in the Atlantic
Dry Dock Modernization Extends operational capability of century old dry docks by another 100 years Cheaper to modernize than construct new graving dry docks Incorporating existing infrastructure, reduces complexity of shipyard operations
86 years old 85 years old 91 years old
Installs wall anchors to prevent collapse during seismic event, ensuring safety of workforce, community, submarine
Strengthens surrounding soil to reduce liquefaction concern
Completed Facilities
PHNS Low Pressure Air
Modernized LPA generation and distribution to provide resilient maintenance infrastructure
Restored LPA capacity supporting 4 dry docks, 47 repair berths, and 47 buildings at JBPHH
PHNS Water Line
Replaced 3,100 feet of deteriorated 1922-era 24-inch cast iron water line
Serves as primary water source for PHNS and Hickam Airfield
PSNS Pier 5
Replaced, repaired, and reinforced degraded piles and ship connection jewelry
Restored 1,100 LF of submarine berthing
Reskinned and reroofed circa 1939, 100KSF warehouse
Created watertight envelope and addressed life/safety deficiencies of nuclear refueling & radiological material storage facilities
NNSY Radiological Storage PNSY Waterfront Production Facility PNSY Paint, Blast and Rubber Facility
120KSF, 4-story facility consolidates shops, support, and engineers
Reduces availability durations by 2% and saves $1.8M in labor per availability
74KSF facility consolidated nine dispersed, aged buildings making all submarine gaskets
Efficiencies save 2,000 labor hours per year and $2.5M
Industrial Plant Equipment (IPE)
NNSY Pipe Bending Machine PSNS 25-ton Portal Crane
Average age reduced from 24 years to 20 years
NNSY Reactor Servicing Complex
PNSY Shaft Lathe
PHNS 5 Axis Router
Ongoing Construction at PSNS & IMF
Speakers: CAPT Troy Brown and CDR John Daly
Workload Projections by Location
PRE-DECISIONAL
0.00
500.00
1000.00
1500.00
2000.00
2500.00
3000.00
3500.00
4000.00
FY26 FY27 FY28 FY29 FY30 FY31 FY32
Bremerton (SIOP) Bangor (NNDM/TRF) Spokane WA South Sound MCON South Sound SRM North Sound MCON North Sound SRM
Multi-Mission Dry Dock Construction, EIS Status
Speaker: Dave Gibson
The Navy’s Largest Construction Project Puget Sound Naval Shipyard – Multi-Mission Dry Dock
20 August 2026
Disclaimer
This presentation represents planning by the Department of the Navy and a National Environmental Policy Act decision has not been rendered.
A Generational Challenge
The U.S. Navy will construct the nation’s largest repair dry dock to support Ford-class carriers in the Pacific.
Ford-Class Aircraft Carrier
CVN-78 USS Gerald R. Ford undergoing sea trials, 8 Apr 17
CVN-79 USS John F. Kennedy undergoing sea trials, 30 Jan 26
Crew due to automation
3,200Nimitz
2,600Ford
-600
Voltage
Shore Power Capacity
Cooling Capacity
4.16kVNimitz
13.8kVFord +9.6kV
20MVA Nimitz
40MVA Ford
+20MVA
10,000gpmNimitz
17,620gpmFord +7.6Kgpm
Saltwater Fire WaterSaltwater CoolingCooling Water
Non-potable WaterLP AirHP Air
Pure WaterOily WastePotable Water
Pressure ReliefSteamSanitary Sewer
Strategic Importance
USS Carl Vison in INDOPACOM
USNS Comfort traversing Panama Canal
Panama Canal Limitation 168 ft Canal beam width
257 ft Ford flight deck width
Multi-Mission Dry Dock (M2D2)
Pier 2
M2D2
Renderings of the Multi-Mission Dry Dock (M2D2)
630K CY Chamber896k CY Excavation
867k CY Dredging
817k CY Concrete 361K SF Support Facilities
PNSY DD1
P381
PHNS DD5
P209
PSNS M2D2
P454
Pentagon
0.4x 0.8x 3x
0.6x 2x0.5x
0.7x 0.6x 2.5x
804,750 tons 435,000 cubic yards
Concrete
Total concrete used
Eiffel Tower 11x6x5x 10,100 tons
Steel
Empire State Building
9.5 Megawatts
Peak electrical demand
Volume
Electric
Note: Does not include Pier 2 or ancillary buildings of P454
Weight of iron
235,941 cubic yards
Roman Colosseum Volume above arena
Dry Dock Size Comparison
Major Above Grade Features
Dry Dock (1,210’ L X 210’ W)
40’ Gage Crane Track
Support Buildings
Process Water & Dewatering Pumphouse
Process Water Collection Storage Tanks
Freight and Personnel Elevator
Stairway to Dry Dock
Seat & Sill Structure
Caisson
Major Below Grade Features
Upland Slurry Wall
Permanent Cofferdams
Saltwater Pumpwells
Process Water and Dewatering Pumpwell
Engineered Backfill
Crane Track Piles
Apron Piles
Entrance Wall and Caisson Seats
Electrical, Mechanical, and Telecom Tunnels
Pressure Relief System
Farragut Utility Tunnel
Process Systems and Utilities
Closed Loop Cooling
Shore Chilled Water
Saltwater (Closed Loop Cooling Backup)
Saltwater (Fire Protection)
Low-pressure & High-pressure Compressed Air
Non-potable Freshwater
Oily Waste
Potable Freshwater
Pure Water
Sanitary Sewer
Steam
Industrial power
Shore power
Construction Constraints
Shipyard nuclear ship maintenance must continue, and local community must operate
• 15,000 shipyard workers – largest in the Navy
• Maintaining CVNs, SSBNs, SSGNs, and SSNs
• Limited security access (Controlled Industrial Area)
• Limited laydown area
• Aged utilities and buildings
• Commercial and hydroculture waterway
• Competing construction programs
• Surrounded by local community
PSNS Dry Dock 3, future site of M2D2
PSNS Dry Dock 6 with USS Nimitz Sinclair Inlet, Bremerton WA 25
Construction Logistics
P454 Construction Footprint Temporary Construction Port Security Barrier
CIA
Train Rail
Relocating 1,355 Shipyard Workers
240K sqft Leased
Offsite Multi-use Area For Contractors
What you build and how you build it
N
Logistics Pier
Batch Plant
Temporary Mooring For Construction
Train Rail Availability in CIA
Providing Solutions
Batch Plant Dedicated to P454
Community Considerations
N
M2D2
Downtown Bremerton
P454 Primary Facilities
Multi-Mission Dry Dock (M2D2) Reinforced concrete, pressure relieved graving dry dock with caisson for FORD and NIMITZ class maintenance, with supporting electrical and mechanical systems
Pier 2 136KSF reinforced concrete with pile caps and precast deck panels, replacement for Piers 6 and 7
Shipyard Support Building 280KSF facility consolidates multiple functions and existing buildings
Forge & Heat Treat Facility 78KSF facility (at Bangor)
Radio Hill Complex 494KSF laydown area and employee support building (at Bangor)
Shipfitter & Welder Facility 310KSF heavy industrial shop
PSNS Piers 6 & 7 Metal Forger
Caisson
Industry Feedback – What do the best owners do?
Project Information Contracting Access Collaboration Government
Management Soil Borings
Utility Connections
Equipment Specifications
HazWaste Rules
Contractor Laydown
Source Selection
Economic Price Adjustments
IDIQ Items
Contract Structure
Bonding
Delivery Milestone Achievement Award
Installation (gate) access
Laydown areas
Harbor security
Safety procedures
Ferry schedule
Work hours
Site Logistics
Design files
Alternative technical solutions
Value engineering
Submittals
Schedule and invoice format
Contractor synchronization
OICC and A/E staffing
Electronic systems
Staff Availability
Staff location
Speed of response
29What can the Navy do to reduce risk and uncertainty?
Environmental Impact Statement Status
Draft EIS Released: 18 July 2025 (complete)
Draft EIS Public Comment Period Ended: 3 September 2025 (complete)
Final EIS Public Release: Pending
Anticipated Record of Decision: Pending
The Way Ahead
NOTIONAL SCHEDULE
• FY25: Preparatory leases, renovations, and moves
• 500+ people to relocate
• FY27: Forge Shop, Shipfitter/Welder Facility, Pier 2 construction (in-water work), demolish facilities
• FY28: Demolish Piers 6 & 7, dredging, logistics pier
• FY29: Cofferdam, dredging
• FY30: CVN 79 first pier side maintenance
• FY32: Demolish DD3
• FY33: Dry dock structure
• FY35: Utility buildings and cranes
• FY38: Completion
PRELIMINARY
ACQUISITION STRATEGY
• Multiple primary construction contracts
• Various multiple award or single award contract vehicles
• Competitive best-value source selection contracts
• Set-asides for small business
• Additional contracts for environmental work
• Early contractor involvement throughout design
• Fixed price contracts potentially with delivery milestone achievement awards
• Economic price adjustments and indefinite quantity elements
For additional information see:
https://multimissiondrydock.com/
Navy Panel Audience Q&A
Speakers: David Gibson, Bryan Cochran, CAPT Brown and CDR Daly
How to do Business with the Government
Speaker: James Davis
Services to Help Your Business Grow Presented by James Davis
KEDA, WA Apex Accelerator, Region 1
August, 20th 2026 This APEX Accelerator is funded in part through a cooperative
Agreement with the Department of Defense.
Experience in private industry
• Do you have stable clientele already?
• Do you have experience in the Scope?
Prime Contracting
• Do you have capacity
• Are you ready?
Subcontracts
• Partners
• Does it complement what you do?
Where to Start?
About Apex Accelerator Congress established the Procurement Technical Assistance Cooperative Agreement
Program in 1985 as part of the Department of Defense (DoD) Authorization Act
PTAC was designed to assist businesses (focusing on small businesses) with federal, state and local government contracting
The program is funded by the federal government through the United States Department of Defense (DoD) and locally by Thurston EDC and Kitsap Economic Development Alliance
In 2023 the name changed from PTAC to APEX Accelerator
We help businesses of all sizes, small and large
WINFIND
Services for Small & Large Business Clients
COMPETE
One to One Counseling
Register as a WA APEX Accelerator client
• At washingtonapex.org
• If not in WA, visit https://www.napex.us to find your local APEX Accelerator Advisor
APEX Accelerator services are free
Profile and Marketing Reviews
Who buys what you sell?
How often do they buy it?
How are they buying?
DSBS, Dynamic Small Business Search
• Linked from SAM or SBA account
EMAIL ADDRESSCAPABILITIES NARRATIVEADDRESSCONTACTCOMPANY
tracht@accommotrac.com We manufacture and distribute the Zone-Trac? AR (augmented reality) device. The device trains enhanced vision, concentration and relaxation and is based on NASA research.
5008 PULLMAN AVE NE
SEATTLE, WA 98105-2138
JOSEPH TRACHTMANELITE PERFORMANCE & LEARNING CENTER PS9
leigh.stylos@tamazari.com
487C HOTCHKISS RD
COLVILLE, WA 99114-8740
LEIGH STYLOSTAMAZARI INC10
lovoltcomm@yahoo.com
4816 244TH ST CT E
GRAHAM, WA 98338-8371
DOLANNA BURNETTLOVOLT COMMUNICATIONS, INC.11
Capability Statement 1 page Front and back Photos Color Informative
Elevator Pitch
• Introduction, NOT a sales pitch Company name Certifications What you sell Capability statement
SAM Registration and Updates
What role does State & IRS play?
UEI?
CAGE Code?
DSBS?
Certification Assistance
Federal
SB
SDB
HUBZone
8 (a)
SDVOSB
WOSB
WA State
WBE
MBE
MWBE
CBE
SEDBE
ACDBE
SBE
DBE
PWSBE
Bid Match
Subcontracting with Large Primes
Events Networking Agency Lists of Contractors Introductions
Classes & Workshops
• Government Contracting 101
• Federal Contracting Lexicon
• Steps Leading to a Government Contract
• DoD Cybersecurity Requirements
• Marketing
• Socio-economic Certifications
• Solicitation Review, the Go – No Go Decision
• Cost & Price Proposal Preparation
• Contract Modifications
Free Access to Live and Recorded Webinars
WA APEX Accelerator online https://washingtonapex.org/
APEX Accelerator YouTube https://www.youtube.com/@WashingtonAPEX
KEDA APEX Accelerator page online Govology
Plus: Outreach Events & Workshops Wednesdays with the Deputies for Small Business
(Last Wednesday each month, 10-11:30 am)
Partnering & Networking Opportunities
Where Government and Business Connect
Save the Dates:
March 24,25th 2026
Monthly, 2nd Wednesday 8-9 am
Annually in March Greater Tacoma Convention Center
Monthly, 1st Wednesday 8-9:30 am
Articles and Resources
WA APEX online KEDA APEX page online Newsletter
We can’t (in case you were wondering) Provide general business planning or advising services … but we can provide warm referrals to our partners
Advocate or lobby for specific socio-economic groups or clients
Represent the firms we work with in the marketplace
Prepare your proposal
Where to find your Apex Accelerator?
www.napex.us.orgWashingtonapex.org
James Davis APEX Program Manager
Terry Homburg APEX Advisor
Mary Jo Juarez APEX Advisor
Thank You!
Kitsapeda.org/APEX Washington APEX.org
360.377.9499 54
Daniel Miller Apex Volunteer Advisor
Cybersecurity Maturity Model Certification
(CMMC)
Speaker: Terry Homburg
DoW Cybersecurity Maturity Model Certification (CMMC) Current Status
NAVFAC NW Industry Day August 20, 2026
This APEX Accelerator is funded in part through a cooperative agreement with the Department of War.
Overview of CMMC
• There are 15 departments of the federal executive branch.
• DoW is 1 of 15 departments.
• DoW cybersecurity requirement is CMMC.
• None of the other departments use CMMC
• Overview
• The Hierarchy
• Current status
• CMMC Implementation
• CMMC Certifications
• Impact on the Contractor
• What will it Cost ??
• CMMC Certification Level Requirements
• CMMC Level-1 Contract Information Safeguards
• PIEE & SPRS
• What is CUI ??
• The Cybersecurity Clauses
• Organizations to Help
• Summary
• Q & A
Agenda
Abbreviations & Acronyms CA, Certified Assessor CMMC, Cybersecurity Maturity Model Certification Cyber-AB, Cybersecurity Maturity Model Certification Accreditation Body CUI, Controlled Unclassified Information C3PAO, Certified Third-Party Assessor Organization NIST, National Institute of Standards and Technology OSC, Organization Seeking Certification PIEE, Procurement Integrity Enterprise Environment RP, Registered Practitioner RPO, Registered Practitioner Organization RPA, Registered Practitioner Advanced SPRS, Supplier Performance Risk System
• CMMC is for unclassified procurements
• Controlled Unclassified Information (CUI)
• CMMC is not for classified procurements
• Such a “secret” or “top secret” contracts.
• CMMC is not the DoD Interim Rule
• Need DoD Interim Rule at a minimum for JCP certification now
• You need CMMC Level-2 for JCP certification starting 11/10/2028
CMMC
The Hierarchy DoW - Department of Defense
Cyber-AB - Cybersecurity Maturity Model Certification – Accreditation Board (Body) (a non-profit, independent organization)
C3PAO - Certified Third-party Assessor Organization (Commercial company) (Issues the 3-year certificate)
CA - Certified Assessor (sub-contractor to or employee of C3PAO)
OSC - Organization Seeking Certification (you, the company)
CMMC Current Status
• CFR Title 32, CMMC became law on Dec. 16, 2024.
• CFR Title 48, CMMC acquisition final rule was issued on Sep. 10, 2025.
• CMMC will be phased-in over a 3-year period.
• Phase-1, Nov. 10, 2025, some Level-1 and Level-2 (self-certification) solicitations
• Phase-2, Nov. 10, 2026, some Level-2 solicitations and the above
• Phase-3, Nov. 10, 2027, some Level-3 solicitations and the above
• November 10, 2028, all solicitations
• Phase-2 is suspended, effective July 13, 2026, for a 60-day review of the program.
CMMC Implementation
The DoW Numbers
• DoW has more than 300,000 contractors (Prime + Subcontractors)
• 60-70% will need CMMC Level-1 certification
• So, 90,000 will need CMMC Level-2 certification
• There are about a dozen contractors that will need CMMC Level-3 certification
CMMC for all DoW contracts
• 3 levels of cybersecurity maturity from basic to advanced
• Level-1, 15 safeguards from FAR clause 52.204-21
• Level-2, 110 controls from NIST SP 800-171A Revision 2
• Level-3, 134 controls from NIST SP 800-171A Revision 2 & NIST SP 800-172
• All Practices & Controls must be implemented
• All DoW contractors will need a certification (some exceptions)
• COTS and MPT (now $15K for DoW)
• Self-assessment for Level 1 and Level 2 (non-critical)
CMMC Certification
• CMMC Certification required to be awarded a contract or subcontract
(at any tier)
• Level-2 (self-assessed or assessed) , All practices & requirements are laid out for contractors to start implementing in NIST SP 800-171A rev. 2
• The Cyber-AB is currently training Registered Practitioners and C3PAOs
• Assessments (certifications) are available now
• As of July 28, 2026, there are: 2,261 RP
429 RPO
307 RPA
111 C3PAO 811:1
CMMC Certification Numbers
• As of July 28, 2026, there are:
Certified Level-2 companies: 1,866 Conditional Level-2 companies: 58 Level-2 audits in progress: 168
• Level 1 & Level 2 (non-critical), Requires self-assessment and certification prior to award and annual affirmation
• Levels 2 (critical) & 3, Requires 3rd party assessment and certification prior to award and annual affirmation
• CAs will most likely charge by the hour plus travel costs - ask for an estimate
• Certification costs are allowable, as an overhead expense
Impact on the Contractor
• Subcontractors will have the same CMMC level as the prime contractor or lower based on the Statement of Work (SoW)
• Prime contractors are responsible for all subcontractor tiers
• Increased non-compliance penalties and risks including: the loss of current and future contracts, personal & corporate liability, & negative company brand
• Does not apply to Commercial Off The Shelf (COTS) or Micro-purchases (<=$15K)
Impact on the Contractor (continued)
What Will it Cost?
Affirmation Reqts.Plan of Action & Milestones (POA&M) Reqts.Assessment Reqts.Source & Number of Security Reqts.CMMC Status
After each assessment Entered into SPRS
Not permitted
Conducted by Organization Seeking Assessment (OSA) annually
Results entered into the Supplier Performance Risk System (SPRS)
15 required by FAR clause 52.204-21
Level 1 (Self)
After each assessment and annually thereafter Assessment will lapse upon failure to annually affirm Entered into SPRS
Permitted as defined in § 170.21(a)(2) and must be closed out within 180 days
Final CMMC Status will be valid for three years from the Conditional CMMC Status Date
Conducted by OSA every 3 years Results entered into SPRS CMMC Status will be valid for three years from the
CMMC Status Date as defined in § 170.4
110 NIST SP 800-171 R2
required by DFARS clause 252.204-7012
Level 2 (Self)
After each assessment and annually thereafter Assessment will lapse upon failure to annually affirm Entered into SPRS
Permitted as defined in § 170.21(a)(2) and must be closed out within 180 days
Final CMMC Status will be valid for three years from the Conditional CMMC Status Date
Conducted by C3PAO every 3 years Results entered into CMMC Enterprise Mission
Assurance Support Service (eMASS) CMMC Status will be valid for three years from the
CMMC Status Date as defined in § 170.4
110 NIST SP 800-171 R2
required by DFARS clause 252.204-7012
Level 2
(C3PAO)
After each assessment and annually thereafter Assessment will lapse upon failure to annually affirm Level 2 (C3PAO) affirmation must also continue to be completed annually Entered into SPRS
Permitted as defined in § 170.21(a)(3) and must be closed out within 180 days
Final CMMC Status will be valid for three years from the Conditional CMMC Status Date
Pre-requisite CMMC Status of Level 2 (C3PAO) for the same CMMC Assessment Scope, for each Level 3 certification assessment
Conducted by DIBCAC every 3 years Results entered into CMMC eMASS CMMC Status will be valid for three years from the
CMMC Status Date as defined in § 170.4
110 NIST SP 800-171 R2
required by DFARS clause 252.204-7012
24 selected from NIST SP 800-172 Feb2021, as detailed in table 1 to § 170.14(c)(4)
Level 3
(DIBCAC)
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract
Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
CMMC Level 1 Federal Contract Information Safeguards
FAR 52.204-21
CMMC Level 1 Federal Contract Information Safeguards
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access;
and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
Procurement Integrated Enterprise Environment https://piee.eb.mil
Supplier Performance Risk System (SPRS) https://www.sprs.csd.disa.mil/
How do you know what is CUI ?
DoDI 5200.48, Controlled Unclassified Information (CUI)
• CUI will be identified in the Security Classification Guide to ensure such information receives appropriate protection
• The program office or requiring activity must identify DoW CUI in the solicitation and resulting contract and which CMMC level certification is required
CUI Link: https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF?ver=2020-03-06-100640-800
Controlled Unclassified Information (CUI)
Examples of Controlled Technical Information (CTI)
Federal Contract Information Technical Reports
Research & Engineering Data Technical Orders
Engineering Drawings Catalog-item Identifications
Specifications Data Sets
Standards Studies & Analyses
Process Sheets Computer Software Executable Code
Manuals Source Code
Examples of NAICS Codes with CUI
NAICS Title 236220 Building Construction 541330 Engineering 541519 Computer Services 561210 Facility Support Services
Look for these Cybersecurity Clauses FAR clause 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (NOV 2021)
DFARS clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting (May 2024)
DFARS clause 252.204-7019, Notice of NIST SP 800-171 DoD Assessment Requirements (NOV 2023)
DFARS clause 252.204-7020, NIST 800-171 DoD Assessment Requirements
(NOV 2023)
DFARS clause 252.204-7021, Cybersecurity Maturity Model Certification Requirements
(MAY 2024)
DFARS CLAUSE 252.204-7025, NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL
REQUIREMENTS (NOV 2025)
DFARS CLAUSE 252.204-7025, NOTICE OF CMMC LEVEL REQUIREMENTS (NOV 2025)
(a) Definitions. As used in this provision, “controlled unclassified information (CUI),” “current,” “Cybersecurity Maturity Model Certification (CMMC) status,” “Cybersecurity Maturity Model Certification unique identifier (CMMC UID),” “Federal contract information (FCI)”, and “plan of action and milestones” have the meaning given in the Defense Federal Acquisition Regulation Supplement 252.204-7021, Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements, clause of this solicitation.
(b)(1) Cybersecurity Maturity Model Certification (CMMC) level. The CMMC level required by this solicitation is: ____________ Contracting Officer insert: CMMC Level 1 (Self);
CMMC Level 2 (Self); CMMC Level 2 (C3PAO); or CMMC Level 3 (DIBCAC). This CMMC level, or higher (see 32 CFR part 170), is required prior to award for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract.
Organizations to Help Contractors
Project Spectrum - https://www.projectspectrum.io/#/
(they provide no-cost training)
Impact Washington - https://www.impactwashington.org/cybersecurity-consulting.aspx
(for manufacturing companies)
CMMC Level-2 C3PAO Mock Assessment
• It’s a pre-assessment
• It’s a non-certification assessment
• No recommendations or advice from the C3PAO
• C3PAO provides a written assessment
• You may contract with the same C3PAO for the actual assessment
• A local C3PAO charges about $2,500 for a Level-1 mock assessment
• Get started now, if you want to be a DoW contractor or subcontractor
• Expect to wait: C3PAOs are in short supply, so plan for several months delay before an audit can start
• There are qualified assessors now (111 C3PAOs)
• You may request an audit anytime now
• Get a C3PAO that knows your industry
• Must be certified at time of contract award
• Add CMMC certification level to the Capability Statement
• Phase-2 is suspended, effective July 13, 2026, for a 60-day review of the program
TASK: Read all future solicitations to see if there are cybersecurity requirements.
Summary
Thank You Program Supporters
QUESTIONS
For Terry
Mr. Terry Homburg homburg@kitsapeda.org
WA APEX Accelerator Advisor
Proposal Preparation Information
Speaker: Nancy Coffee and Jodus Hortin
Multi-Mission Dry Dock 89
Multi-Mission Dry Dock Multiple Award Construction Contract
(MMDD MACC)
• Proposal Preparation Information:
• Acquisition Process and Solicitation Overview
• Instructions to Proposers
• Basis of Award
• Base Contract Administration
• Important Reminders and Next Steps
Introductions
• Contracting Team: NAVFAC
NW
• Rabi Peifer, Chief of the Contracting Office
• Jodus Hortin, Contracting Officer
• Nancy Coffee, Contracting Officer
Acquisition Process and Solicitation Overview
Multi-Mission Dry Dock 92
Acquisition Process
• A MACC is a contract awarded from a single solicitation and may result in award to multiple Contractors.
• This MACC is anticipated to be a single-phase solicitation.
• Offerors must provide best and final offers, non-cost/price factors and price factor considered, at time of proposal submission.
• Award will consist of base Indefinite-Delivery Indefinite-Quantity (IDIQ) type construction contract(s), with issuance of minimum guarantee task orders.
• It is anticipated that most work under the MACC will be initiated by task order(s) that are competed amongst all the MACC holders.
Multi-Mission Dry Dock 93
• The focus of the MACC will be military construction (MCON) project P-454 –
Multi-Mission Dry Dock at the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF) but may include other SIOP projects located anywhere within the NAVFAC area of responsibility.
• Potential Task Orders:
• Package #1 – Marine:
• Pier, Building, Upland Utility Demo
• Dredging
• Construction of upland shoring and cutoff wall
• Construction of double-wall cofferdam
• Upland ground Improvements
• Package #2 – Dry Dock:
• Construction dewatering
• Installation of upland shoring wall tie-backs
• Dry Dock 3 demolition
• Upland excavation
• Construction of pressure relief system
• Construction of dry dock including entrance and quay walls
• Electrical substations
• Utility tunnels
• Partial Farragut Avenue tunnel replacement
• Procure and install process equipment
• Installation of permanent upland utilities
• Package #4 – Caisson:
• Fabrication and delivery of caisson
• Paving and crane rail installation
• Fabrication and installation of fendering system
• Temporary double-wall cofferdam demolition
• Caisson installation
• Testing and Commissioning
• Package #3 – Infrastructure:
Multi-Mission Dry Dock 94
• Potential Risk Mitigations:
• The Navy is considering the following risk mitigation measures including:
• Early Contractor Involvement (ECI)
• Limiting task order performance bonds to a maximum of $2 Billion
• Economic Price Adjustment (EPA)
• Award Fee Schedule Incentive
• Reduced small business subcontracting goals
Multi-Mission Dry Dock 95
• MACC Overview
• Area of Responsibility
• Design-Build (DB) and Design-Bid-Build (DBB) type projects
• Unrestricted, Full & Open Competition is anticipated for this MACC
• Small Business Subcontracting Requirements, as applicable
Multi-Mission Dry Dock 96
• North American Industry Classification System (NAICS) codes anticipated for this MACC:
• 236220 – Commercial and Institutional Building Construction
• 237990 – Other Heavy and Civil Engineering Construction
• Anticipated Period of Performance/Option Periods for this MACC:
• One (1) 60-month Base Period
• One (1) 60-month Option Period
• Total anticipated Period of Performance of 10-years
Instructions to Proposers
• Proposal Submission:
• Proposals SHALL ONLY be submitted via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module
• Proposals submitted via email, hand-delivered, or mailed WILL NOT be accepted
• Allow sufficient time for proposal upload into the PIEE Solicitation Module
• Late proposals will be handled in accordance with FAR Clause 52.215-1
• The Offeror is responsible for contacting the PIEE helpdesk for any system concerns
• Proactive use of the PIEE Web-Based Training (WBT) module is highly recommended
• Offerors may designate multiple personnel as proposal managers within PIEE, which is highly recommended to ensure sufficient notification for any amendments
Multi-Mission Dry Dock 98
• Contractor Teaming Arrangements
• Offeror must provide a signed copy of:
• Partnership Agreement
• Teaming Arrangement, or
• Letter of Commitment for each member of the offeror’s team
• Provide the correct CAGE code for the JV or each individual member of the teaming agreement
• The Government will not assume or independently investigate the existence and nature of a relationship between the offeror and any other entity that has a different Unique Entity Identifier (UEI) and CAGE code
• Sole utilization of company logos and graphics in the organizational chart without supporting narrative/text will not be acceptable.
Multi-Mission Dry Dock 99
• Offerors should not assume they will be contacted or afforded an opportunity to qualify, discuss, or revise their proposals
• Proposals containing qualifications or conditions may be considered ineligible for award
• Page limitations will be strictly enforced
Multi-Mission Dry Dock 100
• Ensure inclusion of all specified NAICS codes are included in the Offeror’s
Representations and Certifications; submitted with the proposal and/or within the Offeror’s entity registration on the System for Award Management (SAM).
• Ensure the Offeror’s entity registration on SAM is complete and active.
• Ensure confirmation of filing of current VETS-4212 report with the Department of Labor (DoL) is included with the proposal and completed annually.
• Ensure the Offeror’s NIST SP 800-171 Rev 2 and CMMC Assessments are properly submitted within PIEE Supplier Performance Risk System (SPRS).
Multi-Mission Dry Dock 101
• SAM (https://sam.gov/):
Multi-Mission Dry Dock 102
• SAM Help Desk (https://sam.gov/help):
• PIEE (https://piee.eb.mil/):
Multi-Mission Dry Dock 103
• PIEE Help Desk (https://piee.eb.mil/#help-piee):
• Phone: 1-866-618-5988
Basis of Award
Basis of Award
• Best Value Trade-off (Anticipated):
• Allows consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror
• Comparative assessment against all evaluation criteria
• Evaluation Factors for Award (Anticipated):
• Factor 1 – Technical Approach (acceptable/unacceptable)
• Factor 2 – Experience
• Factor 3 – Past Performance
• Factor 4 – Small Business Utilization and Participation
• Factor 5 – Safety
• Factor 6 – Technical Factor (to be determined)
Multi-Mission Dry Dock 105
Multi-Mission Dry Dock 106
Experience vs Past Performance
• Experience:
• Experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity.
• Past Performance:
• Past performance pertains to both the relevance of recent efforts, and how well a contractor has performed on the contracts.
Multi-Mission Dry Dock 107
Pre-Proposal Inquiries (PPIs)
• Pre-Proposal Inquiries (PPI):
• Submit all questions via email using the PPI form
• Limit one (1) question per PPI Form
• Do not combine PPI Forms into a single file
• Multiple PPIs may be sent in a single email
• Reference Section and Paragraph in the PPI
• Solicitation Remains Unchanged Unless Altered by Amendment
Base Contract Administration
Base Contract Administration
• Contract Review
• Conducted at Option Exercise and annually on the anniversary of the base contract award
• Construction Wage Rates updated annually
• Wages applicable to task orders issued during that one-year period
• Wages incorporated based on task order location and requirement
• Contract awardee updates to any pertinent information
• SAM entity registration
• Point of Contact Information (for task order Requests for Proposal distribution, etc.)
• VETS 4212 filings
Multi-Mission Dry Dock 109
Important Reminders and Next Steps
Important Reminders
• Submit pricing for all CLINs
• Ensure signatory has documented authority to bind the firm
• Email addresses remain valid
• Register in the VETS 4212 database
Multi-Mission Dry Dock 111
• Acknowledge all amendments
• Bid Bond (if applicable) is properly executed
• Register in SAM prior to bidding
• Maintain access in PIEE
Next Steps
• Pre-Solicitation Notice to be posted to SAM.gov
• Solicitation Notice to be posted to SAM.gov
• Pre-Proposal Conference (Approx. 7-10 days after solicitation issuance)
• Pre-Proposal Inquiries (PPIs) and Solicitation Amendments, as-needed
• Proposal Development and Submission
• Source Selection
• Award
Multi-Mission Dry Dock 112
Wrap up & Questions
Thank you for attending the proposal preparation brief for the Multi- Mission Dry Dock MACC. We look forward to working with you.
Multi-Mission Dry Dock 113
Breakout Time:
Prime & Subcontractor Matchmaking
File details come from the government source that posted it. Updated .