N4425525R0007 Attachment 1-CLIN Unit Pricing Concrete and Aspahlt.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Solicitation - Concrete and Asphalt Recycling, Naval Base Kitsap, Silverdale, Washington
Solicitation number
N4425525R0007
Issued by

About this file

This document is a detailed pricing attachment (Attachment 1) for solicitation N4425525R0007 issued by the Department of the Navy Naval Facilities Engineering Command for Concrete and Asphalt Recycling services at Naval Base Kitsap in Silverdale, Washington. The pricing document outlines unit pricing for multiple contract line items (CLINs) across a base year and four option years, with maximum quantities of concrete and asphalt recycling ranging from 75-150 dry tons per year. The pricing structure includes firm fixed-price work for concrete and asphalt recycling, with additional line items for fence-related services such as installation, maintenance, reconditioning, and removal of various fence types including wood, chain link, barbwire, and ornamental steel fences.

The solicitation includes comprehensive pricing sections for different service categories, with unit pricing requested for multiple fence-related activities like fence installation, maintenance, removal, and temporary fence rental. The contract includes six distinct line items covering the base period and option years, with a potential up to 6-month extension clause. Pricing is to be provided on a per linear foot or per unit basis for specific fence and surface maintenance tasks, with additional options for expedited services and material recycling. The document provides a framework for bidders to submit detailed unit pricing for ground maintenance and fence-related services at the naval base.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRM NAME:
FIRM CAGE CODE:
FIRM Point of Contact

(Name/Email/Phone):

UNIT OFUNIT OFUNIT
CLINDESCRIPTIONMAX QUANTITY (TON)ISSUETIMEPRICEAMOUNT
YEAR
0001Firm Fixed-Price Work
CONCRETE150DRY TON1$_________$______________
ASPHALT50DRY TON1$_________$______________

TOTAL FFP LINE ITEM - 0001 TOTAL AMOUNT $______________

UNIT OFUNIT OFUNIT
CLINDESCRIPTIONMAX QUANTITY (TON)ISSUETIMEPRICEAMOUNT
YEAR
0002Firm Fixed-Price Work
CONCRETE150DRY TON1$_________$______________
ASPHALT50DRY TON1$_________$______________

TOTAL FFP LINE ITEM - 0002 TOTAL AMOUNT $______________

UNIT OFUNIT OFUNIT
CLINDESCRIPTIONMAX QUANTITY (TON)ISSUETIMEPRICEAMOUNT
YEAR
0003Firm Fixed-Price Work
CONCRETE150DRY TON1$_________$______________
ASPHALT50DRY TON1$_________$______________

TOTAL FFP LINE ITEM - 0003 TOTAL AMOUNT $______________

UNIT OFUNIT OFUNIT
CLINDESCRIPTIONMAX QUANTITY (TON)ISSUETIMEPRICEAMOUNT
YEAR
0004Firm Fixed-Price Work
CONCRETE150DRY TON1$_________$______________
ASPHALT50DRY TON1$_________$______________

TOTAL FFP LINE ITEM - 0004 TOTAL AMOUNT $______________

UNIT OFUNIT OFUNIT
CLINDESCRIPTIONMAX QUANTITY (TON)ISSUETIMEPRICEAMOUNT
YEAR
0005Firm Fixed-Price Work
CONCRETE150DRY TON1$_________$______________
ASPHALT50DRY TON1$_________$______________

TOTAL FFP LINE ITEM - 0005 TOTAL AMOUNT $______________

UNIT OFUNIT OFUNIT
CLINDESCRIPTIONMAX QUANTITY (TON)ISSUETIMEPRICEAMOUNT
YEAR
0006Firm Fixed-Price Work
CONCRETE75DRY TON0.5$_________$______________
ASPHALT25DRY TON0.5$_________$______________

TOTAL FFP LINE ITEM - 0006 TOTAL AMOUNT $______________

TOTAL AMOUNT
BASE + Option Years:$______________

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ATTACHMENT 1

CONTRACT LINE ITEM NUMBERS

UNIT PRICING

CONCRETE AND ASPHALT RECYCLING

PROVIDE UNIT PRICING AND TOTAL AMOUNT. TOTAL AMOUNT SHALL EQUAL CLIN NET AMOUNT ON PAGES 6 THROUGH 8 OF SOLICITATION

Line Item 0001 Base Period - Firm Fixed-Price Work

Line Item 0002 Option Year One - Firm Fixed-Price Work

Line Item 0003 Option Year Two - Firm Fixed-Price Work

Line Item 0004 Option Year Three - Firm Fixed-Price Work

Line Item 0005 Option Year Four - Firm Fixed-Price Work

Line Item 0006 Up to 6 Months Extension Clause 52.217-8- Firm Fixed-Price Work