About this file

This synopsis announces a pre-solicitation for an Indefinite Delivery, Indefinite Quantity contract to provide Environmental Restoration Architect-Engineer services within the Naval Facilities Engineering Command Northwest area of responsibility. The contract will have a one-year base period and four one-year option periods, not to exceed $40 million total. Task orders from $1,000 to $2 million will be awarded on a firm-fixed price basis to provide program management, technical design, and quality assurance services in support of environmental restoration programs in Washington, Alaska, Oregon, Idaho, Montana and Wyoming. Responses are due by August 24, 2018 and will be evaluated based on specialized experience, professional qualifications, past performance, quality control, program management and location, with consideration given to experience in CERCLA/RCRA programs and conducting 5-year reviews and risk assessments for DOD sites in Washington and Alaska.

Environmental Restoration Synopsis

View the file

Other files

File Type Posted
Responses__N4425518R5016_8-8-18.pdf PDF
Responses__N4425518R5016_7-30-18.pdf PDF
PPI_Form.docx DOCX document
Attachment_A_NAVFAC_Past_Performance_Questionnaire.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N44255-18-R-5016 INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT FOR

ARCHITECT-ENGINEER SERVICES FOR ENVIRONMENTAL RESTORATION.

Description: ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A

STANDARD FORM SF 330, ARCHITECT ENGINEER QUALIFICATIONS IS CONTAINED

HEREIN. THERE IS NO SEPARATE REQUEST FOR PROPOSALS (RFP) PACKAGE TO

DOWNLOAD.

This procurement will result in one Indefinite Delivery/Indefinite Quantity (IDIQ) contract for

Environmental Restoration Architect-Engineer (AE) services for Environmental Projects at various locations within the NAVFAC Northwest Area of Responsibility (AOR). The principal geographical regions encompassed by this contract include the states of Washington, Alaska, Oregon, Idaho, Montana, Wyoming and to a lesser extent NAVFAC installations in other areas of the United States.

The preponderance of the work is expected to be performed in the states of Washington and Alaska.

The exact location of the requirements will be designated on individual Task Orders.

These services will be procured in accordance with 40 USC Chapter 11, Selection of Architects and

Engineers, as implemented by FAR Subpart 36.6. The IDIQ contract will be for a base period of one year and four one-year option periods (if exercised). The total fee for the contract term shall not exceed $40,000,000. The guaranteed minimum for the contract term (including option years) is

$1,000. Firm-fixed price task orders will be negotiated for this contract. The value of individual task orders executed under this contract will range from $1,000 to $2,000,000; Task orders may be awarded above this range on a limited basis. Multiple task orders may be awarded with similar completion schedules and overlapping delivery dates. Estimated start date is (June 2019).

The market research study (Sources Sought) N44255-18-R-5016 conducted by NAVFAC NW included an assessment of relevant qualifications and capabilities of potentially qualified firms. As a result of the market research analysis, a determination was made to set aside this procurement for

Small Business. The NAVFAC NW Small Business office concurs with this decision. The Small

Business size standard is $14,000,000 annually and the classification is North American Industrial

Classification System (NAICS) Code is 541330, (Environmental Engineering Services). The

Government seeks the most highly qualified firm to perform the required services, based on the demonstrated competence and qualifications, in accordance with the selection criteria.

Firms shall provide a full range of AE environmental services for program management and technical services including: (a) Those in support of the Defense Department's Environmental Restoration

Program (ERP), which includes the Installation Restoration (IRP) and Munitions Response (MRP) programs (b) Compliance with the Comprehensive Environmental Response Compensation and

Liability Act (CERCLA) of 1980 as amended and the Resource Conservation and Recovery Act

(RCRA) of 1976 as amended (c) Support of Navy and Marine Corps Base Realignment and Closure

(BRAC) efforts and (d) similarly complex local and state regulations are also included.

The scope of the contract includes but is not limited to:

Provide project management to effectively and efficiently propose, negotiate pre-award and perform on post-award Task Orders.

Develop remedial designs, remedial action work plans, site safety and health plans (SSHP’s), Statements of Work (SOW), plans, specifications, construction cost estimates, reports, meeting minutes and any associated deliverables.

Conduct technical design reviews to ensure decision document criteria are met.

Perform quality assurance (QA) services.

Preparation of preliminary assessments, site inspections, remedial investigations, feasibility studies (RI/FS), engineering evaluation\cost analysis (EE\CA), proposed plans, Records of

Decision (ROD’s), action memoranda, explanations of significant differences (ESDs) and ecological and/or human health risk assessments, five-year reviews, remedial action completion reports (RACR)and studies supporting optimization of screening, evaluation, selection, design, and implementation of long term operation and management of response actions conducted under the ERP.

Provide consulting services related to military munitions and ordnance compounds, explosives review, oversight and verification of munitions responses.

Evaluate remedial systems and designs for opportunities to incorporate innovative or emerging remedial approaches and information collection technologies that maximize program efficiency.

Model various containment transport and/or concentration trends in a variety of environmental media, assess results and prepare recommendations.

Prepare sampling and analysis plans and conduct environmental sampling of various contaminants, chemicals and compounds in a variety of media.

Prepare appropriate documentation to validate and interpret sample results.

Evaluate compliance with activity-specific institutional or engineering controls.

Provide consulting services related to cleanup of radiological materials.

Provide technical and administrative support for conducting community relationship management efforts, e.g. public meetings or restoration advisory board meetings (RAB’s).

Manage, characterize and dispose of wastes resulting from the work performed under this contract.

Provide electronic data management and support including data validation, managing analytical and geospatial data, consolidating data, and web-site design and maintenance.

Perform project management, interpretive consultation and engineering services to support environmental activities resulting from the Navy’s compliance with all major federal and state environmental laws and regulations.

Prepare studies, plans, inventories/surveys and documents supporting air emissions, hazardous waste, solid waste, hazardous material (including but not limited to asbestos, lead based paint and PCBs), and pollution prevention programs.

Prepare plans, surveys, permit applications, studies and documents for stormwater, domestic wastewater, drinking water, industrial wastewater, sediment, water quality, fisheries, and endangered species in support of Navy compliance with regulations.

Develop environmental planning documents required to support compliance activities.

Support compliance related to oil and hazardous substance spill prevention, response and

UST permanent closure.

Perform industrial hygiene monitoring, sampling and analysis.

Perform tasks related to Environmental Management System (EMS) development and implementation

Prepare Natural and Cultural Resources studies.

Cost estimates shall be prepared by a professional cost estimator, using R.S. Means, Remedial Action

Cost Engineering requirements (RACER), historical data, or Tri-Services Unit Price Book databases, or MCACES Second Generation (MII) complying with NAVFAC’s Cost Engineering Policy and

Procedures Interim Guidance 2017 - 2019 (available on the Whole Building Design Guide (WBDG) website https://www.wbdg.org/ .

Computer drawing data shall be provided on electronic media compatible with AutoCAD or as otherwise directed in each task order. Individual task orders may require that specifications be prepared using SPECSINTACT software and will also be provided in Portable Document Format

(PDF) suitable for posting to Government websites during solicitation.

All contractors are advised that registration in System for Award Management (SAM) Database is required prior to award of a contract. Failure to register in the SAM Database may render your firm ineligible for award. For more information, check the SAM Web site: https://www.sam.gov.

https://www.wbdg.org/ https://www.sam.gov/

The awarded contract will be subject to specific provisions addressing the avoidance of organizational conflicts of interest, including NFAS 5252.209-9300, Organizational Conflicts of

Interest. The prime firm for this contract will be required to perform throughout the contract term.

Interviews may be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to clarify information contained in the SF330 submittal. Elaborate presentations are not desired.

SELECTION CRITERIA:

Firms responding to this synopsis will be evaluated In accordance with (IAW) Federal Acquisition

Regulations (FAR) Part 36.6 (Selection of Architects and Engineers) to determine the most highly qualified firms to perform the required services in accordance with the published selection criteria.

Failure to comply with instructions, or provide complete information may affect the firm’s evaluation or disqualify the firm from further consideration.

The selection will be based on the criteria listed below. Criteria 1, 2, and 3 are most important and equally weighted. Criteria 4 through Criteria 6 are listed in descending order of importance:

1. Specialized Experience

2. Professional Qualifications

3. Past Performance

4. Quality Control

5. Program Management, Location and Capacity

6. Volume of Work

SF 330s will be evaluated to determine the most highly qualified firm based on criteria responses.

Evaluating past performance and experience may include review of information provided by the firm, customer inquiries, government databases, and other publicly available sources. Failure to provide requested data, inaccessible points of contact, or invalid phone numbers could result in a firm being considered less qualified.

All projects provided in the SF 330 (Architect-Engineer Qualifications) must be completed by the office/branch/individual team member actually performing the work under this contract. Projects not performed by the office/branch/individual team member will be excluded from evaluation consideration.

The following elements may result in a higher rating and should be addressed accordingly when preparing criteria responses: a) Completed projects that demonstrate association between team members submitted in Criteria 1 and key personnel identified in Criteria 2; b) Firms demonstrating experience in the specific components identified in Criteria 1; c) Firms demonstrating experience within the task order range of $100,000 to $2,000,000.

Criterion 1-Specialized Experience (SF330, Part I, Section F):

Firms will be evaluated on specialized experience in performance of services similar to those anticipated under this contract through evaluation of experience. Higher weight will be given to firms demonstrating additional experience these (4) specific components.

Provide project management to effectively and efficiently propose, negotiate pre-award and perform on post-award Task Orders.

Develop remedial designs, remedial action work plans, site safety and health plans (SSHP’s), Statements of Work (SOW), plans, specifications, construction cost estimates, reports, meeting minutes and any associated deliverables.

Conduct technical design reviews to ensure decision document criteria are met.

Perform quality assurance (QA) services.

Submission Requirements:

For the proposed team, provide a maximum of eight completed projects, as of the due date of the

SF330. Include the contract number on projects that best illustrate overall team experience relevant to the Statement of Architect/Engineer Services within the past five years. Firms within the team that have multiple offices shall indicate which office completed each project listed. A project is defined as either a single function contract or a single task order under an Indefinite Delivery Indefinite

Quantity contract.

If more than the maximum number of projects is submitted, the Government will only evaluate projects up to the maximum number authorized in the order submitted.

All projects provided in the SF330 must be completed by the actual office/branch/regional office/individual team member proposed to manage and perform work under this contract. Projects not meeting this requirement will be excluded from consideration in the evaluation. To enable verification, firms should include the DUNS number along with each firm name in the SF330 Part 1, Section F, block 25, “Firm Name” Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). In block 24, include in the project description the contract period of performance, award contract value, current contract value, and a summary of the work performed that demonstrates relevance to specialized experience as outlined above. For projects performed as a subcontractor or a joint venture involving different partners, specifically indicate the value of the work performed as a subcontractor or by those firms proposed for this contract, and identify the specific roles and responsibilities performed as a subcontractor or by those firms on the project rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration.

NOTE: If the firm is a joint venture, projects performed by the joint venture should be submitted;

however, if there are no projects performed by the joint venture, projects shall be submitted for each joint venture partner, not to exceed a total of eight projects. Firms failing to provide projects from all joint venture partners will be considered to have not met the requirements of the criterion.

All information for Criterion 1 should be submitted in the SF330, Part I, Section F. The

Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluation of Criterion 1.

Criterion 2-Professional Qualifications (SF330, Part I, Sections E & G):

Professional qualifications and capabilities of the proposed team members to be assigned to this contract, which are necessary for satisfactory performance of the type of work requirements outlined in the SF330, Part 1, Section E.

Provide brief resumes of Key Personnel, including those of each proposed team member who will serve as the overall contract Project Manager, discipline Designers of Record/Environmental

Engineer (maximum of four), and the primary Cost Estimator. The Designers of Record (DOR) shall perform and direct the design within their respective discipline and shall sign and seal the drawings.

All Project Managers and DORs must be professionally registered in their discipline. Provide license number in addition to state of registration and discipline in Block 17 of the resume. Licensing may be verified. Each resume shall include a maximum of five (5) specific completed projects that best illustrate the individual member’s experience relevant to services required under this contract.

Resumes are limited to two pages. Higher weight will be given to personnel demonstrating additional experience in the following specific components of the contract scope.

- Experience with CERCLA, RCRA, MRP and state cleanup regulations (primarily WA, AK and occasionally nationwide), managing regulator interface and negotiations within a multi-agency regulatory environment for Department of Defense sites.

- Experience conducting CERCLA 5-Year Reviews for the lead agency including remedy compliance assessments, human health and ecological risk assessments and recommendations.

- Experience conducting environmental media studies, modeling and trend analysis, specifically for groundwater, marine sediment and achieving regulator concurrence with remedy optimization strategies and/or monitoring optimization.

- Regulatory environmental compliance emphasizing experience with underground storage tank

(UST) investigations and waste water studies and waste water permitting.

SF330, Section G: Demonstrate Key Personnel Participation in Example Projects listed in Section F, as the SF330 instructs. Include firm name with names of Key Personnel.

SF330, Section H, Additional Information requested by Agency. Address the remaining Criteria 3 through 8. Any additional information submitted in Section H pertaining to Criteria 1 and 2, other than past performance information, may not be evaluated. Additional sheets may be used, if required.

CLEARLY IDENTIFY THE CRITERIA NUMBER AND TITLE.

Firms may be considered more favorably by demonstrating the following:

Preparation of preliminary assessments, site inspections, remedial investigations, feasibility studies (RI/FS), engineering evaluation\cost analysis (EE\CA), proposed plans, Records of Decision (ROD’s), action memoranda, explanations of significant differences

(ESDs) and ecological and/or human health risk assessments, five-year reviews, remedial action completion reports (RACR)and studies supporting optimization of screening, evaluation, selection, design, and implementation of long term operation and management of response actions conducted under the ERP.

Prepare sampling and analysis plans and conduct environmental sampling of various contaminants, chemicals and compounds in a variety of media. Prepare appropriate documentation to validate and interpret sample results

Model various containment transport and/or concentration trends in a variety of environmental media, assess results and prepare recommendations.

Conduct technical design reviews to ensure decision document criteria are met and perform quality assurance (QA) service.

Criterion 3-Past Performance (SF330, Part I, Section H):

Firms will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction.

Evaluating past performance and experience will include information provided in Past Performance

Questionnaires (PPQs) or CPARS for Criterion 1 projects and may include customer inquiries, Government databases, and other information available to the Government including contracts with points of contact in other criteria.

Submission Requirements:

SUBMIT A COMPLETED CPARS EVALUATION FOR EACH PROJECT UNDER CRITERION

1. If a completed CPARS evaluation is not available, the Past Performance Questionnaire (PPQ)

(Attachment (A)) included in this notice is provided for the firm or its team members to submit to the client for each project included under Criterion 1, Specialized Experience. DO NOT SUBMIT A PPQ

WHEN A COMPLETED CPARS IS AVAILABLE.

Completed PPQs should be submitted with your SF330. If the firm is unable to obtain a completed

PPQ from a client for a project(s) before the response date set forth in this notice, firms should complete and submit with their responses the first page of the PPQ (Attachment (A)), which will provide contract and client information for the respective project(s). Firms may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) as long as it is on the same form as posted with this Synopsis. Firms should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Naval Facilities Engineering Command NW, Code

ACQ3.2, Attn: Nicole Napier-Kurdelski via email at nicole.napier-kurdel@navy.mil, prior to the response date. Firms shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information or completed CPARS within the reporting system, in the past performance evaluation.

Firms may provide any information on problems encountered and the corrective actions taken on projects submitted under Criterion 1 Specialized Experience. Firms may also address any adverse past performance issues. Narrative regarding negative past performance shall not exceed two double-sided pages (or four single-sided pages) in total.

Awards, letters of commendation, certificates of appreciation, etc. shall not be submitted and will not be considered in the evaluation.

Criterion 4-Quality Control Program (SF330, Part I, Section H):

Firms will be evaluated on the strength of the quality control program proposed by the firm to ensure quality products and services under this contract, and means of ensuring quality services from their consultants/subcontractors.

Submission Requirements:

Describe the quality control program that will be utilized for all deliverables of this contract and the management approach for quality control processes and procedures. The description shall:

1. Explain the quality control program including an example of how the plan has worked for one of the projects submitted as part of SF330, Section F or how the plan will work if it has not been used previously.

2. Provide a quality control process chart showing the inter-relationship of the management and team components.

3. Describe specific quality control processes and procedures proposed for this contract.

4. Identify the quality control manager and any other key personnel responsible for the quality control program and a description of their roles and responsibilities (QC Organizational

Chart).

5. Describe how the firm’s quality control program extends to management of subcontractors.

Criterion 5-Program Management, Location, Capacity (SF330, Part I, Section H):

Firms will be evaluated on the firm’s ability to plan for and manage work under the contract, the capacity to accomplish the work in the required time, and at the locations of their office(s) that will be performing the work under this contract and demonstrated knowledge of the primary geographic areas in which projects could be located.

1. Program Management

Provide an organizational chart for the proposed team and discuss the management plan for this contract and personnel roles in the organization. Describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable.

2. Capacity

Describe the firm’s present workload and the availability of the project team (including consultants) for the specified contract performance period. Describe the workload/availability of the key personnel during the anticipated contract performance period and the ability of the firm to provide qualified backup staffing for key personnel to ensure continuity of services.

General statements of availability/capacity may be considered less favorably.

3. Location

Indicate location of the office(s) that will be performing the work, including main offices, branch offices, and offices of team members. Evaluation of firms will include consideration of their location within the general geographic area of the anticipated projects, primarily; a majority of the work will be in Washington and Alaska, Northern Slope of Alaska, and

Aleutian Islands, Alaska. Provide a narrative describing the team’s knowledge of the primary geographic areas to be covered by this contract. Firms with primary Alaska locations, knowledge and experience may be considered more favorably.

Criterion 6-Volume of Work (SF330, Part 1, Section H)

Numbers will be pulled by the contract specialist for the JV and for each JV partner in the case of a joint venture.

Firms will be evaluated in accordance with DOD Federal Acquisition Regulation Supplement

(DFARS) Procedures, Guidance and Information (PGI) 236.602-1, from data extracted from the

Federal Procurement Data System (FPDS). Firms will be evaluated in terms of work previously awarded to the firm by DOD within the past twelve months with the objective of effecting an equitable distribution of contracts among qualified A-E firms, which have not had prior DOD A&E contracts.

Firms do not submit data for this factor.

SF-330 SUBMISSION REQUIREMENTS:

Architect-Engineer firms desiring to be considered for this contract must submit a completed SF-330 package. The SF-330 shall be typed, one sided, at least 11 point Times New Roman or larger. Part I shall not exceed 75 single-sided 8.5 by 11 inch pages (the page limit does not include ISRs, certificates, PPQs, licenses, nor does the page limit include cover sheets, dividers, or other requested documentation (e.g., joint venture agreement, proof of AE firm registration) provided that these do not contain any substantive information submitted in response to the synopsis or intended to demonstrate the qualifications of the firm). Part I pages shall be numbered sequentially. The organizational chart may be one page single sided 11 by 17 inch foldout, using 11 point font or larger

(font limitations do not apply to graphics, captions or tables). Please include your DUNS and CAGE numbers in Block 30 of the SF-330.

**In accordance with the FAR 36.601-4(b) contracts for architect-engineer services may only be awarded to firms permitted by law to practice the professions of architecture or engineering. Firms must submit proof that they are permitted by law as required by FAR 36.601-4(b). If a firm is in a jurisdiction that requires AE firm registration, the firm must provide proof of registration. If a firm is in a jurisdiction that does not require AE firm registration, the firm must provide proof of eligibility to practice (e.g., a summary explaining eligibility under the laws of that jurisdiction). Failure to submit the required proof could result in a firm’s elimination from consideration.

**Firms who are offering as a joint venture should include with their submission a copy of the joint venture agreement. Failure to include the joint venture agreement may result in the firm’s elimination from further evaluation.

Architect-engineer firms that meet the requirements described in this announcement are invited to submit one original submission with original signature and date (marked “Original” on cover) and two additional hard copies of the SF-330 and one on CD to:

Naval Facilities Engineering Command NW, Code ACQ3.2, Attn: Nicole Napier-Kurdelski

1101 Tautog Circle, Suite 204

Silverdale, WA 98315

Firms responding to this announcement by August 24, 2018, 2:00 pm local time will be considered.

THIS IS NOT A REQUEST FOR PROPOSAL.

Late responses will be handled in accordance with FAR 52.215-1. The points of contact are either

Nicole Napier-Kurdelski, Contract Specialist, at nicole.napier-kurdel@navy.mil, (360) 396-0084 or

Melissa Burris, Contracting Officer, melissa.burris@navy.mil.

If an SF 254/SF 255 is submitted for this solicitation, it will not be reviewed or considered. As required above, provide verifiable evidence that your firm is permitted by law to practice the professions of architecture or engineering (e.g., state registration number).

If hand-carrying or express mailing proposal, the firm is advised that the Contracting Officer is on a secured base and passes are required to enter the base. Anticipate delays in base access and plan mailto:nicole.napier-kurdel@navy.mil accordingly. Hand-carried proposals must be delivered to the mailroom. Government personnel will not pick up proposals at the gate. It is the contractor’s responsibility to ensure delivery to the location specified.

Electronic (E-mail, facsimile, etc.) submissions are not authorized.

Inquiries concerning this procurement should include solicitation number and title and be forwarded via email to nicole.napier-kurdel@navy.mil mailto:nicole.napier-kurdel@navy.mil

File details come from the government source that posted it. Updated .