Attachment_E_PPI_Responses _N44255-14-R-9022 _Amendment_0001.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- NAVFAC Northwest Regional Small MACC
- Solicitation number
- N44255-14-R-9022
About this file
Attachment E PPI Responses Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N44255-14-R-9022 _Amendment_0003.pdf | ||
| Attachment_E_PPI_Responses _N44255-14-R-9022 _Amendment_0003.xlsx | XLSX spreadsheet | |
| N44255-14-R-9022 _Amendment_0002.pdf | ||
| Attachment_E_PPI_Responses _N44255-14-R-9022 _Amendment_0002.xlsx | XLSX spreadsheet | |
| N44255-14-R-9022 _Amendment_0001.pdf | ||
| Attachment_C.2_PPQ_Design_Experience.docx | DOCX document | |
| Attachment_A_PPI_Form.doc | DOC document | |
| N44255-14-R-9022.pdf | ||
| Attachment_B_Construction_and_Design_Experience_Data_Sheet.docx | DOCX document | |
| Attachment_D_Past_Performance_Worksheet_for_Safety.docx | DOCX document | |
| Attachment_C.1_PPQ_Construction_Experience.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase One N44255-14-R-9022 NAVFAC Northwest Regional Small Multiple Award Construction Contract (Small MACC) Attachment E, Pre-Proposal Inquiry (PPI) Responses PPI # Inquiry Response Amendment Responded
| 001 | If a contractor’s 8(a) certification expires during the base year plus four one-year option periods, will the contractor be excluded from participating in subsequent option years? If so, does the contractor become ineligible at the end of the option year or at the 8(a) Program exit date? What will the procedure be if a certification expires while the contractor holds an 8(a) Small MACC contract? | No. As prescribed by FAR 19.804-6(c), "[a]n 8(a) concern may continue to accept new orders under a multiple award, Federal Supply Schedule (FSS), multi-agency contract or Government wide acquisition contract even after a concern’s program term expires, the concern otherwise exits the 8(a) Program, or the concern becomes other than small for the NAICS code assigned under the contract." Offerors are advised that this response does not address eligibility based on Section 8(a) Program criteria, nor does it fully address contract administration functions including but not limited to those prescribed by FAR 19.812. | 0001 |
| 002 | For past performance - If a project is 95% complete, is that acceptable? | No. Refer to Factor 3 – Past Performance, ¶ (b) Basis of Evaluation, which states "This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 2 – Experience…". Refer to Factor 2 – Experience, ¶ (a) Solicitation Submittal Requirements, ¶ (1) Construction Experience, which states "...Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP...". Refer to Factor 2 – Experience, ¶ (a) Solicitation Submittal Requirements, ¶ (2) Design Experience, which states "...Projects submitted shall be completed within the past five (5) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past five (5) years of the date of issuance of this RFP...". | 0001 |
| 003 | Factor 3 – Past Performance: Given that the holiday season (Christmas and New Year’s) falls during the proposal preparation period and a large number of clients will not be available to complete Past Performance Questionnairs, will the Government allow for offerors to submit PPQ’s that have been previously completed and submitted for other RFPs? | ||
| Yes. The solicitation does not prohibit an Offeror from utilizing a previously submitted PPQ. Refer to Factor 3: Past Performance, ¶ (a) Solicitation Submittal Requirements, which states "...Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires...". If an Offeror intends to utilize a previoulsy submitted PPQ, they shall ensure that it contains the information required in Attachment C.1, Construction Experience, and/or Attachment C.2, Design Experience. | 0001 |
&"Times New Roman,Regular"&12N44255-14-R-9022, AMENDMENT 0001 &"Times New Roman,Regular"&12Pre-Proposal Inquiry (PPI) Responses &"Times New Roman,Regular"&12ATTACHMENT E
&"Times New Roman,Regular"&12Page &P of &N
Sheet2
Sheet3
File details come from the government source that posted it. Updated .