Table A.docx
DOCX document 13 KB Posted
- Attached to
- Rental of five (5) 70 ton AC Units with Heaters
- Solicitation number
- N42158-24-Q-A001
About this file
This document outlines specifications for a rental solicitation from the Department of the Navy Naval Sea Systems Command. The solicitation seeks rental of five 65-70 ton air conditioning units with heaters meeting the provided specifications. The units must provide a minimum of 780,000 BTU/hr cooling capacity with at least a 30-degree temperature drop at 12,000 CFM. Additional requirements include a 60 kW heating capacity, 5,000 CFM air output at 40 degree temperature rise, and operating capabilities of 24 hours a day 7 days a week. Bidders must acknowledge their ability to meet the required delivery date and provide technical data sheets for the proposed units.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| APPENDIX A.docx | DOCX document | |
| SF-30 amendment.pdf | ||
| Solicitation Amendment.docx | DOCX document | |
| N4215824RC40170 Solicitation.pdf | ||
| AC Rental QA.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table A
| Description |
| Initials |
Unit must be air-cooled.
Provide a minimum of 780,000 BTU/hr cooling capacity. Unit must provide at least a 30-degree temperature drop at 12,000 CFM.
Provide at least 12,000 Cubic Feet per Minute (CFM) at 5” Static Pressure.
Unit must have at least two (2), 20” Vent duct inlet connections.
Unit must have at least two (2), 20” Vent duct outlet connections (Dampered).
Must be capable of running 24 hours/day, 7 days/week.
Unit must be a complete system, incorporating all the requirements outlined herein, and shall not use external equipment to meet this SOW (Unless outlined/authorized herein). If external equipment is needed to meet the requirements listed herein (such as In-line heaters), the Contractor must provide all equipment necessary to connect the external equipment to the main A/C unit.
Contractor to adhere to the rigging requirements as outlined in this SOW for contractor equipment at Norfolk Naval Shipyard.
Unit must be free standing and must have forklift slots (capable of being moved with a forklift).
Unit must be affixed with a metal tag designating the supplying company, a POC responsible for repairs and maintenance, and a phone number of the POC who is responsible for repairs and maintenance.
Unit must provide at least the following heating capacity. In-line heaters are acceptable.
Power Requirements: 460 V/ 3 phase/ 60HZ
Provide a minimum of 60 kW heating capacity
Input Rating: 200,000 BTU or better
Air Output: 5,000 CFM minimum
Temperature Control: 40° F Temperature Rise minimum
Thermostatic Controller: Heating and cooling elements must be thermostatically controlled.
Contractor must include brochure or technical data sheet for the unit model that will be rented to NNSY.
Contractor must acknowledge the ability to meet the required delivery date provided within CLINs, or provide closest date that unit can be delivered.
File details come from the government source that posted it. Updated .