Amendment 01 - Q0069.pdf

PDF 452 KB Posted

Attached to
Shot Peening Services Federal contract opportunity
Solicitation number
N4215821Q0069
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Shot Peening Services, newest first.
File Type Posted
Ser 05P-386 Shot Peening Direction.pdf PDF
Approved--CDRLs Shot Peening- STEALING.pdf PDF
Solicitation N4215821Q0069.pdf PDF
WD 2015-4341 REV 17.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N4215821RC10824

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to address questions from Industry. All other Terms and Conditions remain unchanged. See Continuation Page for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4215821Q0069

X 9B. DATED (SEE ITEM 11)

31-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Sep-2021

CODE

NORFOLK NAVAL SHIPYARD

ATTN: KENNETH STEALING

NNSY CONTRACTING

C400, BLDG 65, 1ST FLOOR

PORTSMOUTH VA 23709-1022

N42158 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4215821Q0069

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

1. Can you provide drawings of these shafts? (Answer) No.

2. If drawings cannot be provided:

(1) CVN Propeller Shaft (1 fillet radius) o What is the diameter & length of the shaft?

(Answer) Shaft length: 66’ – 8-1/8” o What is the shaft diameter & fillet radius for shot peening?

(Answer) Shaft Diameter: ~28-5/16” / fillet radius: 5-5/8” & 1-7/16” o Will the shaft require areas to be protected (masking)? Is shot peening contractor responsible for masking?

(Answer) Shaft will require areas to be protected (masking) but NNSY will be responsible for masking all critical surfaces.

(3) CVN Intermediate Shafts coupling flanges (2 fillet radii per shaft) o What is the diameter & length of the shaft? This will determine if we have to move our peening enclosure.

(Answer) Shaft length: 32’ – 3-3/8” / 34’ – 2-3/4” o What is the shaft diameter & fillet radius for shot peening?

(Answer) Shaft Diameter: ~28-1/4” / fillet radius: 5-5/8” & 1-7/16” o Will the shaft require areas to be protected (masking)? Is shot peening contractor responsible for masking?

(Answer) Shaft will require areas to be protected (masking) but NNSY will be responsible for masking all critical surfaces.

3. Questions & comments:

It is standard to perform NDT before shot peening, not after peening as stated in 6.4.h o (Answer) It is standard for surfaces to be NDT inspected before shot peening to ensure no prior surface defects are present that must be mitigated prior to shot peening. NNSY will perform NDT’s before and after shot peening services are performed.

Can you provide Memo Ser. 05P/386: “Shot Peening Requirements for Shaft Flange Fillets” dated Dec 23, 2015.

o (Answer) See Attached Will there be on-site safety training?

o (Answer) Required PPE for B171 is Steel Toe Shoes, Safety Glasses and Hearing Protection.

Any additional safety training may be coordinated between Project POC and NNSY Safety Department. Please consult Project POC at award regarding any additional safety requirements.

SECTION SF 1449 - CONTINUATION SHEET

TABLE OF CONTENTS

The Table of Contents has changed from:

N4215821Q0069

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 CDRLs 5 Attachment 2 Wage Determination 12 31-AUG-2021 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 3 Ser 05P-386 Shot Peening

Direction

(End of Summary of Changes)

File details come from the government source that posted it. Updated .