1.The purpose of this modification to solicitation N4215818QN in FedBizOpps is to reflect CFM of 1250 or Greater Air Compressor with Air Dryer verses 1050 or Equivalent. 2. This change was necessary since a 1050 CFM Air Compressor; Oil-Free (Diesel) with Air Dryer does not exist and the new range meets customer need. 3.No other changes were made.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4215818RC80496
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
1.The purpose of this modif ication to solicitation in FedBizOpps to reflect CFM of 1250 or Greater Air Compressor w ith Air Dryer verses
1050 or Equivalent.
2. This change w as necessary since a 1050 CFM Air Compressor; Oil-Free (Diesel) w ith Air Dryer does not exist.
3.No other changes w ere made to the actual attached solicitation or supporting documents.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4215818QN004
X 9B. DATED (SEE ITEM 11)
20-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Mar-2018
CODE
NORFOLK NAVAL SHIPYARD
SERVICE CONTRACT DIVISION, C410
ATTN: CHERON BRIGHT
MAHONEY AVE, BLDG 1500
PORTSMOUTH VA 23709-5000
N42158 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4215818QN004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- CLIN 0002
The CLIN extended description has changed from:
RENTAL/LEASE OF TWO (2) EA CFM OF 1050 OR GREATER DIESEL OIL-FREE AIR COMPRESSORS
WITH AIR DRYERS IN ACCORDANCE WITH STATEMENT OF WORK PROVIDED HEREIN.DAILY RATE
PER UNIT:WEEKLY RATE PER UNIT:MONTHLY RATE PER UNIT:
To:
RENTAL/LEASE OF TWO (2) EA CFM OF 1250 OR GREATER DIESEL OIL-FREE AIR COMPRESSORS
WITH AIR DRYERS IN ACCORDANCE WITH STATEMENT OF WORK PROVIDED HEREIN.DAILY RATE
PER UNIT:WEEKLY RATE PER UNIT:MONTHLY RATE PER UNIT:
The following have been modified:
STATEMENT OF WORK
1. Scope:
1.1 Title: (2)1250 CFM Diesel Oil Free Air Compressor (or greater) for preservation of built-in tanks.
1.2 Location of work:
1.2.1 Inside NNSY Waterfront Controlled Industrial Area (CIA).
2. Period of Performance:
2.1 Base Year POP: March 23, 2018 – March 22, 2019
2.2 Option Year POP: March 23, 2019 – March 22, 2020
NOTE: All requirements stated are applicable to each unit provided by the contractor.
3. General Specifications:
3.1 1250 CFM Diesel Oil Free Air Compressor (or greater)
a. Delivery of ≥1250 CFM (30 m³/min) or equivalent
b. Pressure rated at ≥100 psig (7 bar)
c. Pressure range: 80 psig(5.5 bar) – 125 psig(9 bar)
d. Diesel driven
e. Forklift pockets and four-point certified lift frame required
f. Rigging sketch provided. Lifting and Rigging must conform to NAVFAC-P-307 Standards
g. Must have gross weight stenciled on four sides
3.2 Air Dryer shall be provided with the compressor with the following capabilities, features, specifications
a. Air inlet and air outlet connectors are 3" Boss
b. Provides -40 degrees Fahrenheit or -100 degrees Fahrenheit dew point
c. Particulate pre-filter and oil removal filter with automatic drain and pressure differential gauge for filters
d. One Micron after filter with pressure differential gauge
e. All equipment and filters must be mounted on unit
f. Forklift pockets and four-point certified lift frame required
g. Rigging sketch provided. Lifting and Rigging must conform to NAVFAC-P-307 Standards
h. Must have gross weight stenciled on four sides
4. Contractor Requirements:
1. EQUIPMENT DELIVERY AND REMOVAL AT NO COST TO THE GOVERNMENT.
2. PROVIDE ALL PARTS REQUIRING REPAIR OR REPLACEMENT UNDER CIRCUMSTANCES OF
NORMAL EQUIPMENT WEAR AND TEAR AT NO ADDITIONAL CHARGE.
3. THE CONTRACTOR SHALL DISPATCH A REPRESENTATIVE IN RESPONSE TO A SERVICE
REQUEST TO REPAIR AND/OR REPLACE ANY EQUIPMENT WITHIN SIX (6) HOURS OF
NOTIFICATION BY NNSY AT NO ADDITIONAL CHARGE.
4. WHEN THE EQUIPMENT IS REQUIRED TO BE REMOVED TO THE CONTRACTOR'S FACILITY
FOR REPAIR OR REPLACEMENT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOSS
OR DAMAGE, FROM THE TIME IT LEAVES THE GOVERNMENT SITE UNTIL IT IS RETURNED
TO THE GOVERNMENT SITE.
5. CLEAN ALL EQUIPMENT PRIOR TO DELIVERY:
(A) EQUIPMENT SHALL BE CLEANED TO A DEGREE OF CLEANLINESS THAT RESULTS IN A
SURFACE FREE OF GREASE, OIL, FLUX, SCALE, DIRT LOOSE PARTICLES AND ANY
OTHER MATTER FOREIGN TO THE BASE METAL. ADHERENT LIGHT SUPERFICAL RUST
ON STEEL SURFACES, CAUSED BY SHORT TIME EXPOSURE TO THE ATMOSHPERE, IS
ACCEPTABLE.
6. EQUIPMENT MUST HAVE PAD EYES FOR CRANE MOVEMENT OR FORKLIFT SLOTS
(CAPABLE OF BEING MOVED WITH FORLIFT).
7. THE WEIGHT OF ALL EQUIPMENT MUST BE STENCILED ON THE UNIT.
5. Requirements for Lifting of Equipment
5.1 The equipment shall be outfitted with suitable attachments for overhead lifting.
5.1.1 For multiple point lifts each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength.
5.1.2 For multiple point lifts each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.
5.1.3 Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.
5.1.4 Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”.
5.2 The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).
5.3 The equipment shall be provided with a lifting sketch / rigging diagram that meets the requirements See paragraph 11, Sheet 7.
5.3.1 The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).
5.3.2 The lifting sketch shall include the location of the center of gravity of the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.
5.3.3 A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded to Code 714 (396-3345, 3346).
5.4 If specialized handling gear other than shackles, standard slings, or chainfalls (i.e. spreader beams, special lift rigs, etc.) is required, the contractor shall furnish it. This handling gear shall be provided certified in accordance with NAVFAC P-307, with written documentation of proof testing.
6. Rigging Sketch Requirements
6.1 Rigging sketches, as a minimum, shall identify the following:
6.1.1 The weight of the load.
6.1.2 The location of the center of gravity.
6.1.3 The minimum crane capacity.
6.1.4 The minimum capacity / length of slings.
6.1.5 The minimum capacity of other standard rigging gear.
6.1.6 The attachment (lifting) points for the load.
a. The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.
b. The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.
6.2 Limitations on allowable orientations for any parts making up the lifting assembly.
6.3 For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.
6.4 A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.
a. "D" represents the diameter of the object the sling passes over.
b. "d" represents the diameter of the sling.
c. Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.
6.5 Components in each handling assembly shall be sized based on the worst case distribution of loads.
a. When making a two, three, or four point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used.
6.6 When non-standard gear is required (i.e. round stock lifting bars) written instructions shall be provided that ensure:
a. The proper material is being used,
b. The item is certified IAW NAVFAC P-307.
c. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e. eccentricity of the bearing points).
7. Government Responsibility:
7.1 Provide operators for equipment.
7.2 Perform limited routine maintenance.
7.3 Equipment movements within the shipyard.
7.4 Lost items, equipment damage and minor adjustments.
7.5 Provide point of contact for delivery, escort and notification to contractor for rental pickup.
Notes:
1. New or used equipment may be provided. NNSY reserves the right to inspect the proposed equipment prior to contract award.
2. The government reserves the right to return one or all units at any time prior to the expiration of the rental period. The contractor shall agree to prorate costs for the time the units are in NNSY only. The government agrees to give the contractor twenty-four (24) hour notice for return of units prior to expiration of rental period.
(End of Summary of Changes)