N42158-17-R-0004.pdf

PDF 735 KB Posted

Attached to
Amendment 0001-Accomplish MRC-003 Inspection and Repairs
Solicitation number
N42158-17-R-0004
Issued by

About this file

Request for Proposals N42158-17-R-0004

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local time 10 Oct 2017

X

A

X B

X C X D

EX

X

G

F 58 - 67

68 - 78

X H 79 - 84 keith.g.douglas@navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

DO-A3 1 84

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N42158 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

KEITH G DOUGLAS 757 396 8331

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 6

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

7 - 26

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

28 - 30

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 32 - 34 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 35 - 39 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

40 - 56

PART II - CO NTRACT CLAUSES

NORFOLK NAVAL SHIPYARD

INDUSTRIAL REPAIR DIVISION, C432

ATTN: KEITH DOUGLAS

BLDG 65, 2ND FLOOR

PORTSMOUTH VA 23709-1022

757-396-8331

757-396-9866FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N4215817RQMRC003

5. DATE ISSUED

08 Sep 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N4215817R0004

Section B - Supplies or Services and Prices

NOTES:

A. Each trip shall be in accordance with the FTR and JTR, approved by the COR, and funded prior to travel.

Profit, G&A, and overhead are not allowed on reimbursable travel. For pricing purposes the total amount of all ODC requirements under CLIN 0002 shall not exceed $5,030,623.00.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot Accomplish MRC 003 MTS-711

CPFF

FOB: Destination

PURCHASE REQUEST NUMBER: N4215817RQMRC003

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 1 Lot Other Direct Costs

COST

Cost of travel in support of work under contract line item number (CLIN) 0001.

See Note A.

0003 1 Technical Data

CPFF

For item 0001 through 0002 in accordance with DD Form 1423 Contract Data

Requirements List contained herein: NSP: "NOT SEPARATELY PRICED".

FIXED FEE

TOTAL EST COST + FEE

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the

Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

HQ B-2-0007 LIMITATION OF COST/LIMITATION OF FUNDS (NAVSEA) (SEP 1990)

The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF FUNDS" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

HQ B-2-0008 LIMITATIONS ON INDIRECT COST RATES (NAVSEA) (OCT 1990)

(a) Pursuant to FAR 42.707, an indirect cost rate ceiling is incorporated into the contract. "Indirect cost" is defined as set forth at FAR 31.001 and 31.203. "Indirect cost rate" is defined as set forth at FAR 42.701.

(b) Notwithstanding the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), the allowable indirect cost under this contract shall be obtained by applying limitations on indirect cost rates to bases agreed upon by the parties, as specified below.

(c) Allowability of costs and acceptability of cost allocation methods shall be determined in accordance with FAR

Subpart 31.2 in effect on the date of this contract, as limited by the indirect cost rates established by this requirement.

(d) For the first three Contractor fiscal years, the indirect cost rates contained in the Contractor's accepted contract proposal shall be incorporated into the contract schedule as limitations on indirect cost rates for each Contractor fiscal year of contract performance. The bases to which the indirect cost rates apply shall be those contained in the

Contractor's accepted contract proposal and hereby, incorporated into the contract schedule, in accordance with the

Contractor's accounting system upon which its proposal was based.

(e) After the first three Contractor fiscal years, the Contracting Officer and Contractor shall negotiate the limitations on indirect cost rates for subsequent Contractor fiscal years (unless the parties agree to a different period) and execute a written indirect cost rate limitation agreement setting forth the results. The agreement shall specify (1) the agreed-upon indirect cost rates, (2) the bases to which the rates apply, (3) the fiscal year (unless the parties agree to a different period) for which the rate applies, and (4) the specific items treated as direct costs or any change in the items previously agreed to be direct costs. The agreement is incorporated into this contract upon execution.

(f) Pending establishment of indirect cost rates for any subsequent Contractor fiscal year (or other period agreed to by the parties), the Contractor shall be reimbursed either at the rates fixed for the previous fiscal year or at billing rates acceptable to the Contracting Officer, subject to appropriate adjustment when the final indirect cost rates for that period are established.

(g) The Government will not be obligated to pay any additional amount should any final indirect cost rates for any

Contractor fiscal year (or for any different period agreed to by the parties) after the first three fiscal years) of contract performance exceed the indirect rates incorporated into the contract schedule. In the event any of the Contractor's final indirect cost rates are less than the indirect cost rates incorporated into the contract schedule, the incorporated rates shall be reduced to conform with the lower rates.

(h) The limitations on indirect cost rate shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. If facilities capital cost of money is proposed as an allowable cost, the rates proposed shall be subject to the limitations imposed by this requirement.

(i) The limitations on the indirect cost rate shall apply to all work performed under the contract, and to all change orders and supplemental agreements, including changes due to growth, supplemental, emergent and new work.

(j) Notwithstanding any of the terms of this requirement, should the Contractor initiate a change to its accounting systems which would alter the composition of any overhead base or pool effected by this requirement, the Contracting

Officer and Contractor shall negotiate to determine the rate ceilings to be applied to the new overhead pools, provided that no agreement shall be made which would increase the costs paid by the United States under this contract.

(k) The limitation on indirect cost rates specified in the Contractor's cost proposal shall be the rates used to compute the costs in the Contractor's cost proposal upon which the award is based.

NOTE A - Offeror shall complete the "Price Group" and "Estimated Total Price" blocks of each data item on the

Contract Data Requirements List(s), attached hereto.

HQ B-2-0014 PAYMENTS OF FEE (S) (COMPLETION) (NAVSEA) (MAY 1993)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, "fixed fee" in cost-plus-fixed-fee type contracts for completion and phase type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be equal to percent ( %) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR

52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money). Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.

(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, in accordance with the clause of this contract entitled "LIMITATION OF FUNDS" (FAR 52.232-22) or

"LIMITATION OF COST" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.

(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) in accordance with paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.

HQ B-2-0019 TRAVEL COSTS (NAVSEA) (MAY 1993)

(a) The Contractor shall not charge, and the Government shall not pay, as an allowable cost under this contract, any manhour costs (whether straight-time or overtime) for Contractor personnel or subcontractor personnel traveling to or from worksites, including travel to worksites other than the Contractor's facility for performance of contract work.

(b) Workers being paid under this contract, as prime contractor personnel or subcontractor personnel, will complete a full shift at the worksite, and no compensation will be paid for travel time before or after the shift.

(c) This requirement pertains only to payments for travel time before or after these workers' regular shifts, and does not apply to legitimate travel costs incurred during normal working hours, provided that those costs are otherwise reasonable, allocable and allowable. This requirement does not apply to manufacturer's representatives or Original

Equipment Manufacturer (OEM) representatives when specifically required by the Government work specifications.

(d) Additionally, the Contractor shall not charge, and the Government shall not pay, any transportation costs under this contract associated with transporting Contractor or subcontractor personnel between the Contractor's facility (or subcontractor's facility), and any other worksite to perform Phased Maintenance Availabilities (PMAs)/Drydocking

Phased Maintenance Availabilities (DPMAs). Transportation costs include, but are not limited to, bus fare, car fare, train fare, or boat fare, paid by the work force, or paid by the Contractor on behalf of the work force.

HQ B-2-0021 CONTRACT SUMMARY FOR PAYMENT OFFICE (COST TYPE) (FEB 1997)

This entire contract is cost type.

Section C - Descriptions and Specifications

1. SCOPE: This Statement of Work (SOW) covers requirements to accomplish a hull structural survey In

Accordance With (IAW) Unrestricted Operations Maintenance Requirement Card (URO/MRC) 003, as well as non-

MRC items and Unscheduled Visual Inspections (UVI). Accomplishment of URO/MRC-003 is required by the

Conversion Work Package (CWP) during the transition of USS San Francisco (SSN-711) from an active submarine to a Moored Training Ship (MTS).

1.1. Background: SSN-711 will undergo a combined Engineered Overhaul (EOH) and Conversion (Conv.) to MTS-

711. During conversion, the frames from approximately 40-1/2 to 60-1/2 (including the fairwater) will be removed and scrapped then replaced with new hull structure. Neither the removed structure nor the new structure requires inspection.

1.1.1. MTS MRC-003 visual inspection and technical evaluation shall be conducted only by individuals who are trained and experienced in submarine hull structural inspections.

1.1.2. No action related to MRC-003, non-MRC or UVI is required for permanently removed or new hull structure.

1.2. Location: Norfolk Naval Shipyard (NNSY), Portsmouth, Va.

2. APPLICABLE DOCUMENTS: The following documents are applicable to this SOW and attached appendices to the extent specified herein. If the contractor desires to use any drawing or technical instruction outside of these guidelines, the contractor shall obtain concurrence through the appropriate Technical Authority via a condition report. The contractor shall be responsible for incorporating any Technical Variance Documents (TVDs) associated with the reference drawings below.

2.1. NAVSEA Standard Items FY 18. See Enclosure 1 of this SOW for applicability. NAVSEA Standard items can be accessed at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx

2.1.1. The contractor shall comply with local Standard Work Templates. See Enclosure 1 of this SOW for applicability.

2.2. T9074-AD-GIB-010/1688 Rev 1, Requirements for Fabrication, Welding and Inspection of Submarine

Structure

2.3. S9086-CH-STM-010/CH-074 Volume I Rev 5, Welding and Allied Processes

2.4. S9074-AQ-GIB-010/248, Requirements for Welding and Brazing Procedure and Performance Qualification

2.5. T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

2.6. S8902-AA-SPN-010 Rev 12, Moored Training Ship General Overhaul Specifications (MTS GOS) Sections

5000-0, 9020-0, 9090-1, 9090-3, 9110-0, 9110-12, 9120-1, 9120-4, 9160-2, 9160-4 and Appendix 3

2.7. S6G MTS Section 074, Casting, Welding, Non-threaded Mechanical Fastening and Allied Processes

2.8. NAVSEA Unrestricted Operation (URO) Maintenance Requirement Card (MRC) 003 Mod 40 Change 165, Conduct Hull Structural Survey

2.9. Submarine Maintenance Standard (SMS) 7650-081-091 Rev C, Change 10, Submarine Structural Inspection and Repairs

2.10. Submarine Maintenance Standard (SMS) 1110-081-020 Rev -, Change 11, Inspect and Repair All Non-SOC

Pressure Hull External Tapped Holes For Drydock Connections, Test Fixtures, Strainer Plates, and Blanking Plate

Connection Fixtures

2.11. Submarine Maintenance Standard (SMS) 1120-081-023 Rev -, Change 2, Inspect and Repair Non-Pressure

Hull Tapped Holes For Drydock Connections and Strainer Plates

2.12. Submarine Maintenance Standard (SMS) 1510-081-004 Rev E, Change 10, Inspect and Repair Non-

Watertight Access Hatches, Cover Plates, Access Manhole Covers, Composite Diesel Exhaust Louvers, and

Associated Parts

2.13. NAVSEA letter 9096 Ser 05U37/440 of 11 Dec 15; Relaxation of Maintenance Requirement Card (MRC) 003

Criteria for NFO Tank Support Structure

2.14. NAVSEA letter 9096 Ser 05U37/439 of 07 Dec 15; S6G Moored Training Ship Conversion Project; Electric

Boat Recommendation for Increasing Special Hull Treatment Removal Gouge and Other Gouge Maximum Depth on Reactor Compartment Modules; Approval of

2.15. NAVSEA letter 9110 Ser 05U37/473 of 15 Apr 16; Moored Training Ship La Jolla (MTS-701); Request for

S6G MTS Class Minimum Scantlings Reduction; Approval with Comments

2.16. NAVSEA letter 9096 Ser 05U37/406 of 26 May 15; S6G Moored Training Ship – Conversion De-scoping

Electric Boat Recommendation for Increasing SHT Removal Maximum Gouge Depth; Approval with Comments and Request for NNSY Action

2.17. NAVSEA letter 9110 Ser 05U37/554 of 26 Jul 17; USS San Francisco (SSN 711) FY-17 S6G Moored

Training Ship Conversion Project; Minimum Scantlings Criteria and Clarification of Maximum Gouge Defect Depth

Requirements

2.18. DWG 100-4638802 Rev G, Pressure Hull Fwd Fr 56-3/4

2.19. DWG 100-4638803 Rev D, Pressure Hull Fr 53-3/4 – 101-1/4

2.20. DWG 100-4638804 Rev C, Pressure Hull Aft Fr 101-1/4

2.21. DWG 100-4638820 Rev E, Non Pressure Hull Fr 11-1/2 - 32-1/2

2.22. DWG 100-4638821 Rev E, Non Pressure Hull Aft Fr 119

2.23. DWG 100-4403272 Rev S, Elliptical Bulkhead Forward and Aft

2.24. <Deleted>

2.25. DWG 100-4497331 Rev H, Penetrations Pressure Hull Fr 87-119

2.26. DWG 100-4497328 Rev M, Penetrations Pressure Hull Fr 30-42

2.27. DWG 100-4555967 Rev W, Miscellaneous Penetrations and Inserts

2.28. DWG 6002-147 Rev E, Valve Component Salvage Assembly

2.29. DWG 6002-148 Rev J, Valve Component Salvage Details

2.30. DWG 100-4497111 Rev L, Hull Inserts & Assoc. Parts ASW Suction & Discharge Valves

2.31. DWG 100-4497636 Rev K, Constant Vent Sea Valves & Inserts MSW & ASW

2.32. DWG 810-4384539 Rev B, 12” Sea Water Hull & Back Up Valves

2.33. DWG 100-8205458 Rev -, Installation 711 Bow Structure

2.34. DWG 100-8205457 Rev -, Ripout Bow Sonar Dome 711

2.35. DWG 100-8205456 Rev -, Ripout Bow Structure 711

2.36. ShipAlt 4414, SSN 711 Bow Restoration

2.37. DWG 100-5006315 Rev C, Horizontal Stabilizer

2.38. DWG 101-5003734 Rev E, Long’l CL Bulkhead & 16’-6 Web Fr 25-1/2 – 32

2.39. DWG 113-4638014 Rev B, Foundation Cable Sheave & Press. Transducer

2.40. DWG 114-4637356 Rev K, Long’l CL Bulkhead Fr 128-142 & Transv. Bhd 131 & 142

2.41. DWG 114-4637355 Rev R, Bulkheads 15 Aft Fr 9, Fr 15, Fr 20

2.42. DWG 114-5003034 Rev C, Long’l CL Bhd & 16’-6 Web Fwd Fr 20

2.43. DWG 115-4555411 Rev H, Bilge Coll. Tank – Valve Station Fr 34-35

2.44. DWG 115-4403291 Rev P, Sanitary Tk 1, Impulse Tanks 1 & 2

2.45. DWG 115-4638818 Rev C, Potable Water Tanks 1 & 2

2.46. DWG 115-4638819 Rev B, WRT Tanks 1 & 2

2.47. DWG 115-4637350 Rev H, Forward Trim Tank

2.48. DWG 115-4638286 Rev G, Auxiliary Tanks 1 & 2, Sanitary Tanks 2 & 3

2.49. DWG 127-6307509 Rev D, GRP Sonar Dome

2.50. DWG 515-4497220 Rev L, MBT Vent Valves -10” Seat

2.51. DWG 519-5006494 Rev A, Rudder – Upper

2.52. DWG 520-4457027 Rev N, Capstan Hull Insert and Support

2.53. DWG 527-4403815 Rev J, Stern Diving Planes

2.54. DWG 600-5006054 Rev E, Hinged Cleat NWT

2.55. DWG 600-4458036 Rev N, Hinged Chock

2.56. MTS MRC 003 Rev F, Conduct Hull Structural Survey

2.57. NAVSEA Note 5000

2.58. NAVSEA letter 9110 Ser 05U37/522 of 27 Jan 17; Request for Clarification of Qualifications to Perform

Unrestricted Operation (URO) Maintenance Requirement Card (MRC) 003, Structural Inspections During the

Upcoming Moored Training Ship (MTS) Conversion of the USS SAN FRANCISCO (SSN 711)

3. REQUIREMENTS:

(V)(G) Accomplish the requirements of NAVSEA Standard Item 009-09 in its entirety throughout this contract in accordance with Reference 2.1. The contractor shall develop a single process control procedure (PCP) for the entire work scope, not each location described within this contract.

(I)(G) “MRC-003 INSPECTION”

3.1. MRC-003: The contractor shall perform all aspects of hull structural survey, including preparation, planning, inspection, tracking deficiencies, evaluation, repair or replacement of defects to include all labor, fire watches, tank watches, trades and support services, reporting and certification of work, IAW References 2.8 and 2.9 as limited and modified below, and 009-121 of 2.1. Submit reports of the inspection findings, evaluations and repair actions

(CDRL A001). All findings and repair actions incurred for this inspection and the following subparagraphs shall be provided in the final report (CDRL A002). General Note 8 of Reference 2.8 does not apply.

3.1.1. Accomplish MRC-003 of items visible from dry dock, pressure hull only IAW Equipment Guide List (EGL)

Item 13 of Reference 2.8, including the following configuration items:

1) ASW 1/2 Hull Insert (HI)

2) ASW 29/30 HI

3) ASW80/81 HI

4) MSW 1/3 HI

5) MSW 2/4 HI

6) MSW 25/37 HI

7) MSW 26/38 HI

8) MSW 33/31 HI

9) MSW 34/32 HI

10) Pressure Hull visible from dry dock, except areas inside a radiological boundary

11) <Deleted>

12) SA-7 HI

13) SA-8 HI

14) TD 85/86 HI

3.1.2. Accomplish MRC-003 of items not visible from dry dock, pressure hull only IAW EGL Items 1, 3, 4H, 4J and 4K of Reference 2.8. This item includes, but is not limited to, the transition section voids forward and aft, from the bottom centerline and up 3 ft. girth on port and starboard sides.

3.1.2.1. Per paragraph 9110-0-c.d of Reference 2.6, replacement of filler material between the outer shell and the pressure hull is not required. Therefore the contractor shall not replace filler material removed in this area.

3.1.3. Accomplish MRC-003 of normally wetted previously obscured areas in or on the pressure hull, non-pressure hull, tanks, and supporting structure, interior and exterior, excluding those inside a radiological boundary or aft of

Frame 40-1/2 internally IAW EGL Item 11 of Reference 2.8.

3.1.3.1. The contractor shall notify the Code 440 Shipbuilding Specialist of interferences requiring removal IAW

Reference 2.1, 009-23. If an entity other than the contractor removes interferences outside of the radiological boundary or forward of Frame 40-1/2 internally, the Code 440 Shipbuilding Specialist will inform the contractor of the area that requires inspection and repair. The contractor shall perform the inspections and repairs on that newly exposed structure. The surface area of this newly exposed structure, covered under this paragraph, is estimated at

8,000 square feet.

3.1.3.2. The contractor shall remove and reinstall insulation and lagging interferences in accordance with 009-11 of

Reference 2.1. Sound damping tiles are removed and reinstalled under separate contract.

3.1.4. Accomplish MRC-003 on interior portions of non-pressure hull in the stern structure and other free flood non-pressure hull surfaces portions IAW EGL Items 8A, 8E, 8F and 8G of Reference 2.8, excluding super-structure/fairwater and those inside a radiological boundary or pressure hull interior aft of Frame 40-1/2.

3.1.5. Accomplish MRC-003 on exterior portions of non-pressure hull IAW EGL Items 14A, 14C and 14D of

Reference 2.8, including the following configuration items:

1) MBT 4A Vent Valve HI

2) MBT 4B Vent Valve HI

3) Non-pressure Hull Exterior

4) Sonar Dome Drain Insert

3.1.6. <Item Deleted>

3.1.7. <Item Deleted>

3.1.8. Accomplish MRC-003 of the Forward Bilge Collecting Tank IAW EGL Item 6 of Reference 2.8.

3.1.9. Accomplish MRC-003 of the Bow Sonar Tank IAW EGL Item 6 of Reference 2.8.

3.1.9.1. The government will evaluate and repair any defects identified by the contractor on the Glass Reinforced

Plastic (GRP) dome only. The contractor shall evaluate and perform any required repairs on the remaining portions of the bow tank IAW Paragraph 3.8.

3.1.10. Accomplish MRC-003 on the Main Ballast Tanks IAW EGL Item 7 of Reference 2.8, including the following configuration items:

1) MBT 1A

2) MBT 1B

3) MBT 2A

4) MBT 2B

5) MBT 3A

6) MBT 3B

7) MBT 4A

8) MBT 4B

9) MBT 5A

10) MBT 5B

3.1.11. Accomplish MRC-003 on the Potable Water Tanks, Numbers 1 and 2, IAW EGL Items 6 and 15 of

Reference 2.8.

3.1.12. Accomplish MRC-003 of Sanitary Tank Number 1 IAW EGL Item 6 of Reference 2.8.

3.1.13. Accomplish MRC-003 of the Torpedo Impulse Tanks, Numbers 1 and 2, IAW EGL Item 6 of Reference 2.8.

3.1.14. Accomplish MRC-003 on the Forward Trim and Alternate Forward Trim Tanks IAW EGL Item 6 of

Reference 2.8.

3.1.15. Accomplish MRC-003 of the WRT Tanks, Numbers 1 and 2, IAW EGL Item 6 of Reference 2.8.

(I)(G) UNSCHEDULED VISUAL INSPECTION (UVI)

3.2. UVI: The contractor shall perform all aspects of UVIs IAW Reference 2.9 for the following areas. Submit a report of the inspection findings, evaluation and repair actions (CDRL A001). All findings and repair actions incurred for these inspections and the following subparagraphs shall be provided in the final report (CDRL A002):

3.2.1. Auxiliary Tank Number 1, forward of cut line at Frame 40-1/2

3.2.2. Auxiliary Tank Number 2, forward of cut line at Frame 40-1/2

3.2.3. Battery Well Interior, forward of cut line at Frame 40-1/2

3.2.4. Upper Rudder

3.2.5. Upper Rudder Void

3.2.6. Stern Diving Planes, Port and Starboard

3.2.7. Horizontal Stabilizers, Port and Starboard

3.2.8. Pintle Bearing Voids, Port and Starboard

3.2.9. Stern Diving Plane Voids, Port and Starboard

3.2.10. Horizontal Stabilizer Void, Starboard

(I)(G) “HOLE INSPECTION”

3.3. Pressure Hull Tapped Holes: The contractor shall accomplish, in conjunction with Paragraphs 3.1 and 3.2, tapped holes inspections IAW Reference 2.10 for items listed in Paragraph 3.1.1. Submit a report of the inspection findings, evaluation and repair actions (CDRL A001).

(V)(G) “VERIFY DELRIN SET SCREWS”

3.3.1. The contractor shall install delrin set screws and thread-savers for all tapped holes in components listed in

Paragraph 3.1.1 when permanent fasteners are not installed or while work is performed.

(I)(G) “HOLE INSPECTION”

3.4. Non-Pressure Hull Tapped Holes: The contractor shall accomplish, in conjunction with Paragraphs 3.1 and 3.2, tapped hole inspections IAW Reference 2.11 for items listed in Paragraphs 3.1.4 and 3.1.5. Submit a report of the inspection findings, evaluation and repair actions (CDRL A001).

(V)(G) “VERIFY DELRIN SET SCREWS”

3.4.1. The contractor shall install delrin set screws and thread-savers for all tapped holes in components listed in

Paragraphs 3.1.4 and 3.1.5 when permanent fasteners are not installed or while work is performed.

(I)(G) “RECESS INSPECTION”

3.5. Non-Watertight Access Hatches: The contractor shall accomplish, in conjunction with Paragraphs 3.1 and 3.2, the requirements of Reference 2.12 for the following areas. Submit a report of the inspection findings, evaluation and repair actions (CDRL A001).

3.5.1. Torpedo Ejection Pump (TEP)/Torpedo Tube (TT) recess, port

3.5.2. Torpedo Ejection Pump (TEP)/Torpedo Tube (TT) recess, starboard.

(I)(G) “NON-MRC INSPECTION”

3.6. Free Flood And Void Non-MRC: The contractor shall perform, in conjunction with Paragraphs 3.1 and 3.2, non-MRC inspections and repairs in free flood and void areas (except for inside radiological boundary areas or pressure hull interior aft of Frame 40-1/2) for missing, deteriorated or defective items. Submit a report of the inspection findings, evaluation and repair actions (CDRL A001).

(I)(G) “NON-MRC INSPECTION”

3.7. Built-in Tank Non-MRC: The contractor shall perform, in conjunction with Paragraphs 3.1 and 3.2, non-MRC inspections and repairs in built-in tanks (except those inside radiological boundary areas or pressure hull interior aft of Frame 40-1/2) for missing, deteriorated or defective items. Submit a report of the inspection findings, evaluation and repair actions (CDRL A001).

3.8. Defect Repair Limits: Although the condition of the submarine at time of overhaul is unknown, contractor shall accomplish repairs in accordance with Reference 2.2 at locations listed in Paragraphs 3.1 to 3.7 after report concurrence by Code 200, up to the following limits, as designated by the Code 440 Shipbuilding Specialist using the requirements of References 2.2-2.17 and material IAW References 2.18-2.55.

3.8.1. Accomplish weld build-up as follows:

3.8.1.1. Not to exceed 790 square feet of surface area with a maximum depth of 3/16 inch to repair general corrosion.

3.8.1.2. Not to exceed 500 pits with a maximum depth of 1/4 inch and a diameter of 2 inches.

3.8.1.3. Not to exceed 20 gouges, each with maximum dimensions of 1/4 inch deep x 6 inches in length x 1/4 inch wide.

3.8.1.4. Not to exceed 35 linear feet of weld repair for undercut and linear indications with a maximum depth of

3/16 inch.

3.8.1.5. Surfaces shall be ground to smooth metal for proper paint adhesion in addition to the repair welding requirements in Reference 2.2.

3.8.1.6. Accomplish the repairs from report submitted in para 3.3 and 3.4 IAW references 2.2-2.5, 2.7, 2.10 and

2.11 not to exceed 20 holes

3.8.2. Remove existing and install new the following structure:

3.8.2.1. Not to exceed 20 square feet of plate. For bidding purposes, plate shall be 1/4 inch thick High Tensile

Strength (HTS) steel.

3.8.2.2. Not to exceed 20 linear feet of flatbar stiffeners. For bidding purposes, stiffeners shall be 2 inch x 1/4 inch flat bar.

3.8.2.3. Not to exceed 15 pipe hangers. For bidding purposes, hangers shall be 1-1/2 inch wide x 1/4 inch thick flat bar.

3.9. Plan of Execution:

3.9.1 Contractor shall participate in pre-job planning from date of award to start of execution. Contractor representative(s) shall be authorized by the contractor to make management decisions relative to the requirements of the SOW. The representative(s) shall meet with the NNSY Project team on a daily basis for the Work Integration

Meeting and compare programmed NNSY, Ship’s Force, Alteration installation Teams (AIT), and Fleet

Maintenance Activity (FMA) work with the Contractor schedule. The representative(s) shall address factors that may impact milestones and the SOW completion and provide recommended courses of action to resolve problem areas. All time durations are subject to discussion for slight adjustments during the pre-job planning phase. Laydown dry-dock and pier-side equipment locations will be finalized.

3.9.2 The contractor shall coordinate with the NNSY Code 300 Work Integration Leader and the NNSY Code 440

Shipbuilding Specialist to develop, maintain, and track a scheduled plan of execution. Submit the overall project schedule and weekly schedule updates IAW Reference 2.1 (CDRL A003) and submit monthly and annual reports of cost performance, schedule performance and risk assessment (CDRL A004-monthly, CDRL A007-annual). The contractor is required to inspect and perform repairs in multiple areas simultaneously.

3.9.3 Contractor shall provide a point of contact who may be reached 24 hours a day, seven days a week, to coordinate and manage the production effort in conjunction with NNSY’s work, who shall attend project team meetings IAW Paragraph 3.9.1, as directed by the Code 440 Shipbuilding Specialist. Contractor will be afforded 2 weeks for set up of all equipment and personnel onboard to meet boots on the ground start date.

3.9.4 Contractors shall coordinate schedules and areas affected by work with the Code 440 Shipbuilding Specialist.

Contractor shall participate in all Shipyard drills affecting the Project (approximately two hours total time each).

The Project will coordinate all Drills with the Code 440 Shipbuilding Specialist and will normally require the

Contractor to muster outside of the dry−dock with the Work Integration Zone Manager (WIZM) or Project

Designated Representative. The Contractor shall plan for one Shipyard drill per quarter during the availability. The contractor shall conduct this action in accordance with NAVSEA Standard Item 009-60 of Reference 2.1.

3.9.5 Contractors shall be responsible for inspection of workspaces prior to manning to ensure spaces are available for work to avoid unnecessary delays in day to day schedule. Any concerns must be immediately relayed to the

Code 440 Shipbuilding Specialist. A general timeline of workspace availability is provided in paragraph 8 for initial planning purposes.

3.10. Permanent Removals: The contractor shall be required to repair or replace the structure and items, remaining after permanent conversion rip-outs are complete, relating to the tasks above IAW NAVSEA approved documents cited in Section 2, within the references cited herein and only IAW NAVSEA approved documents. Coordination to identify these areas shall occur IAW Paragraph 3.9 above.

3.10.1. The contractor shall not inspect structure or components that were permanently removed prior to the contractor’s scheduled inspection.

3.10.2. The contractor shall not inspect existing structure between frames 40-1/2 to 60-1/2, nor shall the contractor inspect any new structure.

(I)(G) “POST-BLAST INSPECTION”

3.11. Post-Blast Inspections: The contractor shall perform post-blast inspections IAW References 2.8 paragraph

1.A.(4) and 2.9 paragraph 1.c. Submit a report of the inspection findings, evaluation and repair actions (CDRL

A001). All findings and repair actions incurred for these inspections and the following subparagraphs shall be provided in the final report (CDRL A002).

3.11.1. The government will perform as-arrived paint grade inspections, pre-blast inspections, preservation system removal and preservation system restoration.

3.11.2. Although Reference 2.9 does not specifically describe post-blast inspections, the intent per this SOW is that the contractor shall perform UVI post-blast inspections.

3.12. Evaluation and Repair: For evaluation and repair of defects, the contractor shall use References 2.6, 2.7, and

2.13 through 2.17 to modify the criteria within References 2.8 and 2.9. In Reference 2.8 and 2.9, all reference to

NAVSEA (PMS 392T) and SUBSAFEGRAM 71C do not apply; the contractor shall notify the Code 440

Shipbuilding Specialist in cases where NAVSEA would normally be contacted. Reference 2.6 supersedes Reference

(j) of Reference 2.8 and Reference (a) of Reference 2.9. Submit a report of the inspection findings, evaluation and repair actions (CDRL A001).

3.13. Confined or Enclosed Space: If entry into or hot work adjacent to a confined or poorly ventilated enclosed space is required, the contractor shall be responsible for gas free entry requirements and tank watch responsibilities

IAW Reference 2.1, 009-07.

3.14. Deviations, Waivers and LARs: The contractor shall submit a Condition Found Report (CFR) to the Code

440 Shipbuilding Specialist for any deviations, waivers or Liaison Action Requests (LAR) (CDRL A005).

3.15. Open and Close Tanks: The government will perform initial opening and final closure of tanks, recesses and voids.

3.16. NAVSEA Standard Items: The contractor shall work IAW the requirements set forth in References 2.1 and

2.1.1.

3.17. References: The contractor shall utilize References 2.18 through 2.55 to evaluate structure. If structure is not shown on these references, or those contained within them, contact the Code 440 Shipbuilding Specialist to obtain the drawing required.

4. SECURITY CLASSIFICATION OF EQUIPMENT, COMPONENTS, SPACES AND DOCUMENTS: The

Equipment, Space or Document is classified and subject to the applicable provisions of the National Industrial

Security Program Operating Manual, DOD 5220.22-M (0584-LP-179-6400).

4.1. Spaces: Interior Forward of Frame 40-1/2 and Exterior of Submarine to include all tanks, voids and recesses external to the pressure hull outside of a radiological boundary. All personnel will be required to have the proper clearances {minimum DOD Confidential Security Clearance for access Topside and to the Interior of the Submarine, excluding interior areas (not within boundaries of the pressure hull) accessed from the Dry-dock}. The Prime

Contractor shall be responsible to ensure that all Sub-Contractor Personnel Meet all Security Requirements, and hold Proper Clearances to support this Work Item.

4.1.1. Contractors shall be restricted to the shipboard spaces impacted by work only. All other spaces are restricted access only.

4.2. Local Security: The contractor shall abide by all local security policies at the work location IAW Standard

Work Template 042-26 of Reference 2.1.1.

5. QUALIFICATIONS:

5.1. Experience and Authorization: Contractor personnel shall be previously experienced, trained, and NAVSEA qualified in all MRC-003 inspections IAW the qualifications section of Reference 2.56. Contractor shall be authorized to conduct MRC-003 inspections IAW Reference 2.57 or 2.58.

5.2. Welding and NDT: The Contractor shall be qualified in accordance with Section 4 of Reference 2.2 which includes welding and Non-Destructive Testing (NDT) procedure qualifications and personnel qualification in accordance with References 2.4 and 2.5. Record requirements are to be in accordance with Section 5 of Reference

2.2 and where specified by References 2.2 and 2.3.

5.3. Asbestos Containing Material (ACM): The contractor shall plan and have personnel qualified to work near

ACM should it be present at the shipboard job site.

5.4. Polychlorinated Biphenyls (PCBs): The contractor shall plan and have personnel qualified to work near PCB containing components should it be present at the shipboard job site.

6. EQUIPMENT, MATERIAL AND SERVICES:

6.1. Government Furnished Property (GFP):

6.1.1. For tapped holes, the government will provide the following material:

1) NSN 8030-00-008-7207: Sealing Compound, Liquid Sealing Compd TY 1-1/2, MIL-S-81733, QTY = 16 KT (1

KT = 1 Pint)

2) NSN 5305-01-235-8311: Setscrew, 5/8-11UNC-2A X 5/8" LG, QTY = 154 EA

3) NSN: 9390-00-618-7538: Non-metallic Rod, 1/2” DIA x 36”L, Delrin, QTY = 6 EA

4) NSN 5305-01-292-1386: Screw, 5/8-11UNC-2A X 1” LG, NICU, FF-S-86E, Type IV, QTY = 32 EA

5) NSN 5305-01-235-8312: Setscrew, 3/4-10UNC-2A X 3/4 LG, QTY = 24 EA

6) NSN 9390-01-259-1401: Non-metal Rod Delrin 1" DIA, LG = 96", QTY = 1 EA

7) NSN 5305-01-234-7562: Setscrew, Headless, Plastic Acetal, 0.500-13UNC-2A-1/2 Inch Long, QTY = 104 EA

6.1.2. NNSY will confirm quantity and quality of GFP and turn over to Contractor. Once received, Contractor shall be responsible for GFP

6.1.3. All Property not consumed shall be returned to NNSY and/or disposed per Government Property

Administrator (PA)/Plant Clearance Officer (PLCO).

6.2. Government Furnished Services are requested by submitting a formal document in advance of the needed service (CDRL A006):

6.2.1. Crane services for movement of hoses, pumps, and associated equipment between pier and ship.

6.2.2. Temporary services including but not limited to power, lighting, ventilation, and tool air.

6.2.3. Hazardous Material Disposal.

6.2.4. Any temporary system deemed necessary by the government Hull, Mechanical and Electrical Chief Test

Engineer (CTE) or the Nuclear CTE to maintain plant conditions.

6.2.5. A lay down area for contractor use related to the work in this SOW. The lay down area shall not exceed

10,000 square feet.

6.3. Contractor Furnished Material:

6.3.1. The contractor shall furnish all material required to execute this SOW that is not provided by the government, including consumable material.

6.3.2. The Navy and Defense Supply Systems material shall be used to its maximum extent without presenting risk to completing work by scheduled completion milestones. Should the supply system be unable to support work dates, or the local commercial procurement is more cost effective to obtain the identical item, the contractor shall note that scenario on the respective Inspection Report (IR) and move forward without seeking an exception to this requirement from the Administrative Contracting Officer (ACO).

6.3.3. All equipment, material, and articles incorporated into the work covered by this contract shall be domestic, new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract.

References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The contractor shall use any equipment, material, article, or process that, in the judgment of the

Contracting Officer, is equal to that named in the specifications (material list), unless otherwise specifically provided in this contract.

7. REQUIREMENTS FOR SAFETY, HEALTH AND ENVIRONMENTAL

7.1. Occupational Safety, Health and Environmental: Per FAR 22.102-1(a) entitled “Safety”, Contractors are hereby informed that their employees or representatives present on property under NNSY cognizance shall follow Federal and State Occupational Safety, Health Administration (OSHA) requirements; NNSY Occupational Safety, Health and Environmental (OSHE) Program Manual, NAVSHIPYDNORINST P5090.2 requirements; Occupational Safety, Health and Environmental Control Manual (OSHECM) requirements and safety requirements for site specific location of the contract.

7.2. Cables, Lines and Hoses: The contractor shall ensure that all cables, hoses and lines used during task execution are properly tagged as to their use, pressure, voltage, etc. When cables, hoses or lines must be passed through watertight doors, hatches and hull openings, disconnects must be located as close as possible to the affected door, hatch or hull opening with a fire axe located in close proximity for severing cables, lines or hoses as necessary.

Quick-disconnects shall be used where possible. The service identification tag shall be securely attached to the service line, within 4 feet of the watertight door, hatch or hull opening and shall be capable of withstanding the rigors of the shipboard working environment.

7.3. Asbestos Containing Material: ACM was recently encountered on a SSN-688 class submarine; therefore it is not reasonable to assume ACM is not present on all class boats.

7.3.1. The government will sample for ACM and notify the contractor if ACM is present. Preliminary sampling is negative to date. If warranted, the government will remove ACM from contractor job sites.

7.3.2. The contractor shall notify the Work Integration Manager (WIM) and request sampling within 24 hours if

ACM is suspected.

7.4. Polychlorinated Biphenyls:

7.4.1. The government will sample for PCBs and notify the contractor if PCBs are present.

7.4.2. The contractor shall notify the WIM and request sampling within 24 hours if PCBs are suspected.

8. PERIOD OF PERFORMANCE (POP):

8.1. The POP under this SOW is: 5 MAR 2018 to 1 JUL 2019. All tank work must be inspected and repaired before

19 FEB 2019. All Pressure Hull and non-Pressure Hull inspections and repairs must be completed before 4 APR

2019. The Final Report must be prepared and completed 12 weeks after the final repair is complete. (CDRL A002)

8.2. High Risk Work: Based on previous executions of work on similar platforms with a similar size and scope, the project team assesses there is significant risk in large amount of internal and external tank inspections and repairs.

This risk centers on two major factors. There is risk in the total duration required for the contractor to complete inspection, evaluation and repair of discrepancies due to the large amount of surface area of these tanks. The second risk factor is the amount of contracting effort that is going into the tanks. The project team must rely on a cooperative atmosphere between contractors that promotes efficient work and turnover from one contractor to another. For better planning and cost estimation efforts, the below table provides an updated tank schedule based on a docking date of 15 NOV 2017. These dates are the best estimates as of the date of this SOW, but these dates are subject to change as the detailed planning process progresses. The below dates do not represent all the work contained in this SOW.

8.2.1: Tentative Inspection and Repair Dates:

At the start of the Period of Performance, the following worksites should be available to commence inspections and repairs:

Non-Pressure Hull: Sonar Dome

Sonar Dome Drain Insert

Torpedo Ejection Pump Recesses

Forward Trim Tank Top and Exterior

Potable Water Tanks #1 and #2

Forward Recesses

Stern Dive Planes

Aft Recesses

Hull Inserts: TD-85, SA-8

Component--Inspection Type-- Earliest date this inspection can start--Date repairs must be complete

Pressure Hull--Hull Inspection--3/5/2018--4/4/2019

Non-Pressure Hull Exterior--Hull Inspection --4/10/2018--4/4/2019

Potable Water 1--Tank Inspection-- 3/5/2018--4/20/2018

Potable Water 2--Tank Inspection-- 3/5/2018--4/20/2018

Forward Trim--Tank Inspection--3/13/2018--5/1/2018

Torpedo Impulse Tank 1--Tank Inspection-- 3/5/2018--3/27/2018

Torpedo Impulse Tank 2--Tank Inspection-- 3/30/2018--4/12/2018

San 1--Tank Inspection--3/23/2018--5/22/2018

Forward Bilge Collecting Tank--Tank Inspection--7/23/2018-- 8/9/2018

WRT 1--Tank Inspection-- 6/14/2018--7/10/2018

WRT 2--Tank Inspection-- 8/9/2018--8/29/2018

Bow Sonar Tank--Tank Inspection--8/8/2018--8/24/2018

MBT 1A--Tank Inspection --10/23/2018--1/28/2019

MBT 1B--Tank Inspection--11/7/2018--2/19/2019

MBT 2A--Tank Inspection--8/15/2018--11/20/2018

MBT 2B --Tank Inspection--6/25/2018--11/20/2018

MBT 3A--Tank Inspection--7/18/2018--1/4/2019

MBT 3B--Tank Inspection--7/19/2018--1/4/2019

MBT 4A--Tank Inspection--6/21/2018--9/19/2018

MBT 4B--Tank Inspection--7/2/2018--9/28/2018

MBT 5A--Tank Inspection--4/30/2018--8/22/2018

MBT 5B --Tank Inspection--7/17/2018--10/31/2018

Enclosure 1: NAVSEA Standard Items FY 18

The Following Category I NAVSEA Standard Items apply for this Statement of Work:

009-01 General Criteria; accomplish

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide

009-03 Toxic and Hazardous Substances; control

009-04 Quality management System; provide

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

009-20 Government Property; control

009-23 Interferences; remove and install

009-24 Shipboard Authorization, Control, Isolation, Blanking, Tagging and Cleanliness Requirements; accomplish

009-28 Fire Prevention Requirements; accomplish

009-60 Schedule and Associated Reports for Availabilities over 9 Weeks in Duration; provide and manage

009-69 Heavy Weather and Mooring Plan; provide

009-74 Occupational, Health and Safety Requirements; accomplish

009-106 Work Authorization Form Coordinator (WAFCOR); provide

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish

009-120 Fact Finding and Critique of Unplanned Events; manage

009-121 Ship Assessment/Inspection Requirements; provide

The following CAT II NAVSEA Standard Item applies to this Statement of Work:

009-09 Process Control Procedures; provide and accomplish

NAVSEA Standard items can be accessed at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx

The Following NNSY Standard Work Templates apply for this Statement of Work:

042-05 General Requirements for Work on Submarines for Norfolk Naval Shipyard (NNSY) Depot Level

Availabilities; accomplish

042-11 General Occupational Safety, Health and Environment (OSHE) Requirements for Work within Norfolk

Naval Shipyard; accomplish (PCP)

042-22 General Requirements for Work within Norfolk Naval Shipyard (NNSY); accomplish

042-26 Security Requirements for Work within Norfolk Naval Shipyard (NNSY); accomplish

042-28 Special Requirements for Work on Submarines; accomplish

042-89 General Radiological Requirements for Nuclear Powered Submarines at Norfolk Naval Shipyard (NNSY);

accomplish

HQ C-2-0002 ACCESS TO PROPRIETARY DATA OR COMPUTER SOFTWARE (NAVSEA) (JUN 1994)

(a) Performance under this contract may require that the Contractor have access to technical data, computer software, or other sensitive data of another party who asserts that such data or software is proprietary. If access to such data or software is required or to be provided, the Contractor shall enter into a written agreement with such party prior to gaining access to such data or software. The agreement shall address, at a minimum, (1) access to, and use of, the proprietary data or software exclusively for the purposes of performance of the work required by this contract, and (2) safeguards to protect such data or software from unauthorized use or disclosure for so long as the data or software remains proprietary.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .