This is a Statement of Work detailing requirements for shaft seal inspection services on the USNS Matthew Perry (TAKE 9) ship located at Tango Pier in Guam. The work involves inspecting the ship's shaft seal closed loop system, specifically the external piping, fittings, and pipe hangers exterior of the hull aft of shaft alley Frame 85 to the stern tube.
The contractor must conduct a pre-dive planning meeting with key stakeholders to discuss communications, emergency procedures, vessel drafts, and environmental conditions. Key inspection requirements include checking all welds for cracks, examining the Stern Tube Aft Seal Adapter Plate for weld damage, assessing the overall material condition of the Stern Tube System for leaks, and inspecting the protective covering of the STFW system aft seal supply piping. The work must be completed on February 22, 2025, as it is a prerequisite for an upcoming sea trial. The contractor must submit inspection reports electronically in PDF format with photographs. The point of contact is Ed Madrelino, and special attention must be paid to high voltage electrical systems safety requirements due to the T-AKE class's non-standard electrical color coding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4044625Q0006 Amendment 3.pdf | ||
| N4044625Q0006 Amendment 2.pdf | ||
| N4044624Q0011 Amendment 1.pdf | ||
| N4044625Q0006.pdf | ||
| 0901_SHAFT SEAL INSPECTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS Matthew Perry
( TAKE 9 )
SSU25-013
ITEM NO. 0901 CATEGORY "A" 0202-02-20
SHAFT SEAL INSPECTION MH-GUAM
0958 - 1
1.0 ABSTRACT
The purpose of this item is to inspect the ship’s shaft seal closed loop system.
2.0 REFERENCES/ENCLOSURES
2.1 Available onboard
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity
3.1.1 Location: Underwater Hull
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None
5.0 NOTES
5.1 The contractor and all subcontractors, regardless of
tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 24, 28, and 29.
5.2 The contractor and all subcontractors regardless of
tier are advised to review other work items under this contract, Many of the definitions relating to performance of this work item are found in Work Item 001.
SSU25-013
0958 - 2
5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL
SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING
SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME
APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER
AUTHORIZATION.
5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT
FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE
CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND
WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED
AND PROVEN OTHERWISE. TEST ALL ELECTRICAL CABLES TO ENSURE THEY
ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.
5.5 After the discussion with the ship, in-port schedule
had changed. There is requirement to conduct a sea trial either Sunday or Monday. The shaft seal inspection is the pre-requisite for the sea trial and has to be done tomorrow, 22Feb2025.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional
7.0 STATEMENT OF WORK REQUIRED
7.1 Coordinate with ship’s force to have associated
equipment locked and/or tagged out per ship’s lock out/tag out policy. When the maintenance is complete, coordinate with ship’s force to have associated equipment unlocked and/or tagged in per ship’s lock out/tag out policy.
7.2 Conduct a Pre-Dive Planning Meeting with the Diver’s
Representative, Master, Chief Engineer and OMT REP. The meeting agenda and discussion covers, at a minimum:
7.2.1 Discuss means of communication between the
Bridge, Dive Team, and Engine Room.
7.2.2 Discuss procedures/plans for emergencies.
7.2.3 Discuss the vessel’s anticipated drafts, pier-
side clearance, and under-keel clearance at the time of the
SSU25-013
0958 - 3 cleaning.
7.2.4 Discuss impact of the tides and currents on
divers and the examination.
7.2.5 Discuss anticipated duration of the underwater
work.
7.3 Inspect the ship's shaft seal closed loop system.
Inspect the external piping, fittings, and pipe hangers exterior of the hull aft of shaft alley Frame 85 to the stern tube.
7.4 Contractor will inspect all welds, check for cracks in
all piping sections.
7.5 Inspect the Stern Tube Aft Seal Adapter Plate exterior
of ship at stern tube for any damage to welds.
7.6 Report material condition of ship's Stern Tube System
for leaks and overall material condition.
7.7 Inspect protective covering of the STFW system aft
seal supply piping external to the hull for damage.
7.8 Maintain workspaces in a clean condition during and
upon completion of the work requirements. Prevent contamination of any adjacent equipment and spaces.
7.9 Reports
7.9.1 Submit one (1) electronic copy in Portable
Document Format (PDF) and photographs.
8.0 GENERAL REQUIREMENTS:
SSU25-013
0958 - 4
8.1 Location: Tango Pier
8.2 POP: 22 Feb 2025
8.3 POC: Ed Madrelino edwin.s.madrelino.civ@us.navy.mil
Tel: (671)339-6040/671)480-8085 mailto:edwin.s.madrelino.civ@us.navy.mil
| 1.0 ABSTRACT |
| The purpose of this item is to inspect the ship’s shaft seal closed loop system. |
| 2.0 REFERENCES/ENCLOSURES |
| 2.1 Available onboard |
| 3.0 ITEM LOCATION/DESCRIPTION |
| 3.1 Location/Quantity |
| 3.1.1 Location: Underwater Hull |
| 4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None |
| 5.0 NOTES |
| 5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tie... |
| 5.2 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, Many of the definitions relating to performance of this work item are found in Work Item 001. |
| 5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION. |
| 5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERW... |
| 6.0 QUALITY ASSURANCE REQUIREMENTS: None additional |
| 7.0 STATEMENT OF WORK REQUIRED |
| 7.1 Coordinate with ship’s force to have associated equipment locked and/or tagged out per ship’s lock out/tag out policy. When the maintenance is complete, coordinate with ship’s force to have associated equipment unlocked and/or tagged in per ship’s... |
| 7.2 Conduct a Pre-Dive Planning Meeting with the Diver’s Representative, Master, Chief Engineer and OMT REP. The meeting agenda and discussion covers, at a minimum: |
| 7.2.1 Discuss means of communication between the Bridge, Dive Team, and Engine Room. |
| 7.2.2 Discuss procedures/plans for emergencies. |
| 7.2.3 Discuss the vessel’s anticipated drafts, pier-side clearance, and under-keel clearance at the time of the cleaning. |
| 7.2.4 Discuss impact of the tides and currents on divers and the examination. |
| 7.2.5 Discuss anticipated duration of the underwater work. |
| 7.3 Inspect the ship's shaft seal closed loop system. Inspect the external piping, fittings, and pipe hangers exterior of the hull aft of shaft alley Frame 85 to the stern tube. |
| 7.4 Contractor will inspect all welds, check for cracks in all piping sections. |
| 7.5 Inspect the Stern Tube Aft Seal Adapter Plate exterior of ship at stern tube for any damage to welds. |
| 7.6 Report material condition of ship's Stern Tube System for leaks and overall material condition. |
| 7.7 Inspect protective covering of the STFW system aft seal supply piping external to the hull for damage. |
| 7.8 Maintain workspaces in a clean condition during and upon completion of the work requirements. Prevent contamination of any adjacent equipment and spaces. |
| 7.9 Reports |
| 7.9.1 Submit one (1) electronic copy in Portable Document Format (PDF) and photographs. |
| 8.0 GENERAL REQUIREMENTS: |
| 8.1 Location: Tango Pier |
| 8.2 POP: 22 Feb 2025 |
| 8.3 POC: Ed Madrelino edwin.s.madrelino.civ@us.navy.mil |