About this file
This is a Statement of Work for HVAC duct cleaning services at Naval Base Point Loma, Building 570.
The contractor must provide all labor and materials to clean and disinfect HVAC ducting and registers across three floors of Building 570, encompassing approximately 25,463 square feet with 99 registers and associated ducting. Work shall be performed in accordance with current NADCA ACR standards. Specific tasks include covering office equipment prior to cleaning, removing all particles and debris from air ducts using industry-appropriate equipment with HEPA filtration during negative air operations, cleaning all registers, and disinfecting ducts as needed using Decon 30 or equivalent. If mold or bacteria are detected in porous materials, the contractor must submit a Condition for Review to the MSC representative with recommendations for cleaning or replacement. Pre- and post-cleaning airborne particle count testing using calibrated laser particle counters must be conducted in representative occupied spaces and HVAC supply outlets, with results documented and submitted to the MSC representative. Upon completion, the contractor must conduct a walk-through with the Facility Operations Specialist to verify customer satisfaction. The contractor bears responsibility for repairing or replacing any damaged materials. The period of performance is July 13-31, 2026, and work is located at Naval Base Point Loma, Building 570, 140 Sylvester Road, San Diego, CA 92106.
Additional requirements include mandatory on-site supervision, contractor responsibility for base access credentials (DBIDS), compliance with federal, state, and local safety codes including FAR 52.236-13, and reporting of contractor labor hours to the Military Sealift Command via a secure data collection portal. Service Contract Act wage determination 2015-5635 (Revision 3, dated 12/30/2016) applies. The government will furnish no equipment, materials, or services; all costs are the contractor's responsibility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HVAC QUESTIONS AND ANSWERS TEMPLATE FINAL.xlsx | XLSX spreadsheet | |
| HVAC QUESTIONS AND ANSWERS TEMPLATE FINAL.xlsx | XLSX spreadsheet | |
| B570 HVAC 2ND FLR 2.jpeg | JPEG file | |
| B570 HVAC 2ND FLR 1.jpeg | JPEG file | |
| 570 3rd flr layout REGISTERS.pdf | ||
| B570 3RD flr 1.jpeg | JPEG file | |
| 570 1st flr layout REGISTERS.pdf | ||
| 570 2nd flr layout(2) REGISTERS.pdf | ||
| B570 HVAC 3RD FLR 2.jpeg | JPEG file | |
| WI HVAC DUCT CLEANING MSCPAC REV 1.pdf | ||
| HVAC QUESTIONS AND ANSWERS TEMPLATE.xlsx | XLSX spreadsheet | |
| Installation Master Upload as of July 2024.xlsx | XLSX spreadsheet | |
| SECNAV 5512 1 (REV JULY 2027) Fillable AA.pdf | ||
| N4044326Q0035 HVAC DUCT CLEANING MSCPAC_Combined Synopsis.pdf | ||
| WI HVAC DUCT CLEANING MSCPAC.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
BUILDING 570 HVAC DUCT CLEANING
1.0 ABSTRACT:
This item describes the requirement to clean and disinfect the HVAC ducting and registers in building 570 at
Naval Base Point Loma. All work shall be performed in accordance with the current NADCA ACR.
2.0 REFERENCES/ ENCLOSURES:
None.
3.0 ITEM LOCATION/QUANTITY/ITEM DESCRIPTION/MANUFACTURER’S DATA:
3.1 Location: Building 570, floors 1-3.
3.2 Quantity: 3 floors. Approx. 25,463 sq. ft. 99 registers and ducting.
4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIALS/ SERVICES:
None.
5.0 NOTES:
5.1 Security: Contractor’s access is limited to work site area, authorize restrooms use that are in main building.
5.2 Safety: Contractors must comply with applicable federal, state and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirements invoked by contract. In addition, certain types of construction and demolition contracts require inclusion of the FAR 52.236-13 Accident Prevention Clause that requires compliance with the US
Army Corps of Engineers Safety and Health Requirements Manual, EM-385-1-1. Designated
Personal Protection Equipment (PPE) for Eye, Head, Face, Hearing and Footwear is required, based upon a safety / hazard survey. PPE identified as necessary serves as control measures that should be used after a hazard evaluation identifies hazards associated with a particular job or activity, and it is determined that the hazards cannot be eliminated and/or controlled to an acceptable level through engineering design or administrative actions.
5.3 Other Pertinent Information or Special Consideration: On site supervisor is required. The Contractor shall have adequate personnel on-site during the delivery and pick-up times to ensure on the spot replacements are made to prevent safety hazards. The Contractor shall work with the Command
Facility Operations Specialist in developing a work schedule that will ensure access to the facility and work area.
6.0 QUALITY ASSURANCE REQUIREMENTS:
None Additional.
7.0 STATEMENT OF WORK REQUIRED:
Provide all labor and material to clean and disinfect building 570. There are three floors approximately 25,463
sq. ft, 99 registers and ducting. Contractor is to cover office equipment and spaces prior to cleaning and return furniture to original location upon completion. Use industry appropriate equipment to remove all particles/debris from air ducts and clean all registers utilizing a HEPA filtered during negative air operations from each vent. Disinfect each one of the ducts, only as needed, in the building per system with Decon 30 or equivalent. If mold/bacteria are present in porous material, submit CFR to MSC rep with recommendation to either clean or replace material. Pre and post cleaning, airborne particle count testing using a calibrated laser particle counter. Testing shall be conducted at representative occupied spaces and HVAC supply outlets under comparable operating conditions. Results shall be documented and submitted to MSC rep. Upon completion of the work, contractor is to walk the job with the Facility Operations Specialist to ensure customer satisfaction. Any additional work not covered by this work item will be subject to a contract change order.
Contractor is responsible for repairing and/or replacing any material that is damaged while accomplishing the work item.
8.0 GENERAL REQUIREMENTS:
None additional.
9.0 PERIOD OF PERFORMANCE
July 13-31, 2026
10.0 PLACE OF PERFORMANCE
Naval Base Point Loma
Building 570
140 Sylvester Rd, 92106
11.0 MSC TERMS AND CONDITIONS
Offers/quotes submitted in response to this solicitation shall not contain nor be subject to the offeror's/vendor's standard commercial terms and conditions. Any offer/quote submitted in response to this solicitation which includes the offeror's/vendor's standard commercial terms and conditions may be considered a material defect and may be rejected as being non-responsive to the solicitation.
12.0 MSC NRFK MANPOWER
The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Military Sealift Command via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) S, Utilities ONLY; and
(5) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
13.0 MSC BASE SHIP EPIC
SHIP & BASE ACCESS (APR 2013)
https://doncmra.nmci.navy.mil/ https://doncmra.nmci.navy.mil/
Defense Biometric Identification System (DBIDS) is being implemented for access to DoD facilities in
CONUS, HI, Guam and Puerto Rico (replaces RapidGate). Vendor is responsible to acquire DBIDS credentials prior to performance start date. Delays that may result from inadequate planning are contractor responsibility. Vendor instructions and program information is available at https://www.cnic.navy.mil/om/dbids.html. DBIDS credentials require (in succession) (1) Present a letter or official document from the Government sponsoring organization that provides the purpose for your access, (2)
Present valid identification, such as a passport or Real ID Act-compliant state driver's license, (3) Present a completed copy of the SECNAV 5512/1 form to obtain your background check, (4) Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments, and (5) After all of this is done, the contractor will be provided with the DBDIS credential. For vendors with existing Navy
Commercial Access Control System (NCACS) cards, see https://www.cnic.navy.mil/om/dbids.html for instructions to obtain DBIDS credentials. Vendor is responsible to confirm that each employee held DBIDS credentials are active for the specific facility and performance period in accordance with DBIDS.
Additional access permissions may be required in the future.
Vehicle Access: Required for vehicle access to Navy facilities. Follow supplemental instructions on Base
Access forms or base-specific vehicle access forms.
Ship Access List (Vendor-Provided): On company letterhead attachment via email, the vendor is required to provide the ship master (courtesy copy the Port Engineer) with an accurate, current list of performing personnel prior to being admitted aboard the vessel. Under no circumstances will a hand-delivered list be accepted.
T-AKE email address: MASTER@AKE#.NAVY.MIL
(example: master@ake8.navy.mil, where “8” is the hull number).
All other hulls address: MASTER.SHIPNAME@MSC.NAVY.MIL
(example: master.sioux@msc.navy.mil).
(End of Text)
14.0 Wage Determination:
The following wage determination, in accordance with the Service Contract Act of 1965, as amended, is hereby incorporated by reference into the contract and compliance with the same is mandatory: Wage
Determination No.: 2015-5635 Revision No.: 3 Date Of Revision: 12/30/2016.
File details come from the government source that posted it. Updated .