RFQ N4019221Q5004_Amendment 0001.pdf
PDF 506 KB Posted
- Solicitation number
- N4019221Q5004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_N4019221Q5004_with Attachments A-E.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to alter portions of the solicitation as follow s:
1. Block 10 of SF-18 and Section L, Paragraph 1 is hereby revised to extend the deadline to submit quotations from 02 August 2021 to Friday, 06 August 2021.
2. All other terms and conditions remain unchanged.
3. RFI Notice 01 is provided herein as Attachment (1) and is for information purposes only. Any changes to the solicitation shall be implemented by amendment only.
1. CONTRACT ID CODE PAGE OF PAGES
1 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4019221Q5004
X 9B. DATED (SEE ITEM 11)
09-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jul-2021
CODE
COMMANDING OFFICER - NAVFAC MARIANAS
MAR CORE SVC
PSC 455, BOX 195
FPO AP 96540-2937
N40192 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
mark.c.cruz@fe.navy.milEMAIL:671-333-3175TEL:
MARK C. CRUZ / CONTRACT SPECIALIST
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND MARIANAS
PSC 455, BOX 195
FPO AP 96540-2937
IN REPLY REFER TO:
Attachment (1) RFQ Amendment 0001
ACQR 5860213
30 July 2021
REQUEST FOR QUOTATION (RFQ) N40192-21-Q-5004; PERFORM THREATENED AND
ENDANGERED (T&E) PLANT AND INVERTEBRATE SURVEYS ON GUAM AT NAVAL
BASE GUAM, NAVAL MUNITIONS SITE
REQUEST FOR INFORMATION (RFI) NOTICE 01
RFI
NO.
RFQ
Reference/
Section
QUESTION RESPONSE
1 Attachment D, Page 3 of 24, Section 2.2.1, Safety plans:
Some of the field survey areas are located in patches of sword grass, which often have feral pig activity and limited visibility. Are there recommended safety measures for surveying in these areas?
There are no recommended safety measures for surveying in these areas. However, Offerors shall develop and submit an Accident Prevention Plan (APP), including an Activity Hazardous Analysis (AHA) as an appendix.
2 Attachment D, Page 11of 24, Section 7.22, Work Element 3, field work
PWS states that the performance standard is completed field work as specified in project plans and other requirements of the PWS with no health and safety incidents. While safety is a top priority, it is not possible to completely eliminate the potential for safety incidents due to the nature of the work. If a there is a health and safety incident, does that mean that the performance standard will not be met and payment and or a positive review will be withheld?
Safety is a top priority. Offerors shall develop and submit an Accident Prevention Plan (APP), including an Activity Hazardous Analysis (AHA) as an appendix. These reports are intended to reduce/prevent safety incidents.
Contractors that follow the standards of their approved APP, AHA and HACCP and follow general safety precautions would not necessarily result in non-payment of the final work element and/or a negative evaluation.
3 Attachment D, Page 5 of 24, Section 3.2, Experience requirement
The PWS requests a list of personnel who will work on this project and their CVs. In order to meet the proposed schedule, we may hire additional staff or subcontract some of the work after the project has been awarded. Can additional qualified staff be added to the project after award with Government approval?
CVs would be provided for approval.
This is a fixed price, performance based requirement. As such, Offerors are responsible to propose an approach that meets the requirements as prescribed in the Performance Work Statement.
4 Attachment D, page 4 of 24, Section 2.3.1, #2
The Contractor will conduct surveys on parallel fixed width (10m) transects for listed plants and invertebrates… Do these surveys require 100% coverage of the surveyed terrain, or just what is encountered/observed along each transect?
100% coverage is needed, transects 10m apart should allow surveyors to see everything between transects.
5 Attachment D, page 4 of 24, Section 2.3.1, #1 and #2
The PWS for these sections specify surveys for ESA-listed plants, butterfly host plants, and invertebrates, while #3 indicates that
Data is required for ESA-listed plants and invertebrates only. Host plants for wandering butterfly do not need to be recorded.
RFQ N40192-21-Q-5004; RFI NOTICE 01
Attachment (1) RFQ Amendment 0001 data will be collected on all ESA-listed species. Is data required for all ESA-listed species, or just plants and invertebrates? Will host plants for the extirpated wandering butterfly also need to be recorded?
6 RFQ We would like to request an additional week to work with our partners to prepare a bid. Can the submittal date be moved to 9 August 2021 for RFQ N4019221Q5004?
See RFQ Amendment 0001.
7 We would like to request an extension at this time to Thursday the 5th.
See RFQ Amendment 0001.
File details come from the government source that posted it. Updated .