This is Amendment 0002 to a federal solicitation issued by FEAD Cherry Point (Code N40085) for the procurement requisition 7415686 titled "Provide Swing Gates Station BEQ's." The amendment was effective September 14, 2026, and is being issued to provide Preaward Inquiry (PPI) responses. The proposal due date remains Wednesday, September 16, 2026, at 3:00 P.M. local time, and this amendment must be acknowledged with proposal submission. The estimated cost range for the project is between $100,000 and $250,000.

The Preaward Inquiry Form addresses six substantive questions submitted by potential bidders on September 10, 2026. Government responses clarify that contractors should bid in accordance with the provided plans and specifications, with revised plan sheets addressing questions regarding demolition/installation limits, grounding/bonding details, and foundation details for gate posts and bollards. The government confirmed that the gate design has been successfully constructed twice previously with sufficient detail to execute the work. For gate equipment and controls, the government clarified that gates are manually operated with no automatic controls required. Regarding contractor scheduling, the government directed bidders to section 01 14 00 Work Restrictions, paragraph 1.3, for special scheduling requirements governing work at multiple locations.

View the file

Other files

File Type Posted
12939795.pdf PDF
12939792.pdf PDF
12939791.pdf PDF
12939786.pdf PDF
00 01 15.pdf PDF
Amendment 0001.pdf PDF
7415686 SpecsAsOne.pdf PDF
7415686 RFP.pdf PDF
Master PPI Form.xlsx XLSX spreadsheet
7415686 DrawingsAsOne.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

FEAD CHERRY POINT

PSC BOX 8006

CHERRY POINT, NC 28533

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL

is extended is not extended original

PREAWARD INQUIRY FORM

PAGE SECTION PARAGRAPH

8/19/2026 RFP Please provide the Government's estimated cost range for this project. This information is requested to determine whether a bid bond will be required and to allow our surety to evaluate the appropriate bonding limits, as the estimated cost range is required for their review. Providing this information in advance will help avoid the unnecessary risk associated with requesting a bid bond on the day of bid submission and ensure sufficient time for the surety to issue the bond, allowing us to comply with the solicitation's Bond Requirements, which require the bid bond to be submitted with the proposal.

The Estimated cost range is between $100,000 and $250,000.

9/10/2026 4,6 Provide a plan clarification or marked-up demolition/installation limit plan for each gate identifying exact tie-in points and required restoration scope.

See revised plans sheets

9/10/2026 211 Issue a grounding/bonding detail or note identifying conductor sizes/materials, bonding points, and the required connection to existing/new grounding electrodes or systems.

See revised plan sheets.

9/10/2026 211212 Issue foundation details or a structural schedule for gate posts and hold-open bollards, including pier/footing sizes, reinforcing, and embedment requirements by gate type/location

Bid in accordance with plans and specifications.

NOTE: This same gate deisgn has been sucessfully constructed with the same level of detail two previous times. There is sufficient detail to execute the work required under this projects scope of work.

9/10/2026 6, 211 Issue a gate equipment/control schedule or detail identifying the required operator assembly, power, safety devices, and control interfaces for each gate location.

Bid in accordance with plans and specifications.

NOTE: There are no controls for these gates, they are manually operated.

9/10/2026 Will the contractor be able to work at multiple locations or is their limitations requiring phasing Bid in accordance with plans and specificaitons.

NOTE: See section 01 14 00 WORK

RESTRICTIONS; PARA 1.3 SPECIAL

SCHEDULING REQUIREMENTS

POSTED ON

AMENDMENT #

REFERENCE

QUESTION GOVERNMENT RESPONSEDATE

SUBMITTED

July 2011

File details come from the government source that posted it. Updated .