7381813 Streamlined MACC.pdf

PDF 623 KB Posted

Attached to
t 7381813-MCAS: Provide Humidification Control, Building 6042
Solicitation number
N400857381813
Issued by

About this file

This document is a Request for Proposal (RFP) for a Naval Facilities Engineering Command project to provide humidification control for Building 6042 at Marine Corps Air Station (MCAS) Cherry Point in North Carolina. The project involves installing humidification equipment and associated work for the HVAC system, with specific requirements including conducting the installation while the building remains operational and adhering to strict base access and security protocols.

Key project details include a requirement for U.S. firms using U.S. citizens or persons to perform general construction and finish work, mandatory participation in the Defense Biometrics Identification System (DBIDS) for contractor access, and strict security screening for all personnel. The contractor must follow specific scheduling requirements, including requesting permission 15 calendar days in advance for any utility interruptions or work outside regular hours (7:00 am to 3:30 pm, Monday through Friday). Additional requirements include wearing appropriate personal protective equipment, following base regulations, and maintaining building security throughout the project.

View the file

Other files

File Type Posted
7381813 DrawingsAsOne SIGNED.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROVIDE HUMIDIFICATION CONTROL, BUILDING 6042

MCAS CHERRY POINT, NORTH CAROLINA 28533-0006

WORK ORDER #7381813

1.1 GENERAL INTENTION

The work includes installing humidification equipment and incidental related work for HVAC system in Building 6042.

1.2 LOCATION

The work is located at MCAS Cherry Point, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 DETAILED REQUIREMENTS.

Provide and install humidifier and all necessary plumbing, electrical and miscellaneous materials necessary for new equipment. Refer to NAVFAC Drawings 12912799-12912808 and specifications attached to this scope of work.

1.4 SPECIAL SCHEDULING REQUIREMENTS

Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

The building will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

Permission to interrupt any activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption and in accordance with section 1.10.

1.5 CONTRACTOR ACCESS AND USE OF PREMISES

1.5.1 ACTIVITY REGULATIONS

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.5.1.1 SUBCONTRACTORS AND PERSONNEL CONTACTS

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.5.1.2 ADDITIONAL PERSONNEL REQUIREMENTS

1.5.1.2.1 GENERAL CONSTRUCTION AND FINISH WORK

General construction and finish work of the controlled area must be performed by U.S. firms using U.S. citizens or U.S.

Persons. General construction includes construction activities such as building sitework, utilities, foundations, structure, and enclosure or shell, including doors, windows, and façade work. Finish Work includes construction activities such as insulation, floor/partition/ceiling systems, cabinet work, conveyor systems, specialties, building furnishings/fixtures/equipment, mechanical/electrical services and equipment including those specialized for fire protection, security, communication, control, energy conservation, safety, comfort, convenience, and similar purposes.

1.5.1.3 INSTALLATION ACCESS

Obtain access to Navy and Marine Corps installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.5.1.3.1 REGISTRATION FOR DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base- Support/DBIDS/. Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer that provides the purpose for access to the Base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the Base Visitor Control Center representative to obtain a background check.

This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base- Support/DBIDS/.

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential and will be allowed to proceed to worksite.

1.5.1.3.2 DBIDS ELIGIBILITY REQUIREMENTS

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.

1.5.1.3.3 DBIDS NOTIFICATION REQUIREMENTS

Immediately report instances of lost or stolen badges to the Contracting Officer.

Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.5.1.3.4 ONE-DAY PASSES

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection and will have limited access to the installation.

The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.5.1.4 NO SMOKING POLICY

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.5.2 WORKING HOURS

Regular working hours shall consist of an 8 1/2 hour period normally between the hours of 7:00 am to 3:30 pm, Monday through Friday, excluding Government holidays.

1.5.3 WORK OUTSIDE REGULAR HOURS

Work outside regular working hours requires Contracting Officer approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.

During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.5.4 EXCLUSIONARY PERIOD

No work must be performed during the period outside regular working hours without prior written approval of the Contracting Officer. This period has not been considered in computing the time allowed for the performance of this contract.

1.5.5 OCCUPIED BUILDING

The Contractor shall be working in an existing building which is occupied. Do not enter the building without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Relocate movable furniture approximately 6 feet away from the Contractor's working area as required to perform the work, protect the furniture, and replace the furniture in its original location upon completion of the work. Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.

The Government will remove [and relocate] other Government property in the areas of the building[s] scheduled to receive work.

1.5.6 UTILITY CUTOVERS AND INTERRUPTIONS

Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays.

Conform to procedures required in the paragraph "Work Outside Regular Hours."

Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours."

Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.6 SECURITY REQUIREMENTS

1.6.1 STATION REGULATIONS

No employee or representative of the contractor will be admitted to the work site without an Identification Badge or is specifically authorized admittance to the work site by the FEAD, Facilities Engineering & Acquisition Division.

IMPORTANT NOTE: FEAD personnel (Construction Managers, Engineers/Architects, Engineering Technicians, Contract Specialists, or Contract Surveillance Representatives) will not receive, process, re-transmit or otherwise handle IN ANY WAY Personally Identifiable Information (PII) related to the badging process. Do NOT forward any of this information to the

FEAD.

1.6.2 CONTRACTOR ACCESS TO MCAS CHERRY POINT AND OUTLYING AREAS

Documentation requirements for granting access to MCAS Cherry Point for commercial and contract employers and employees.

This document is an aid in meeting ASO 5560.6B requirements and is not a substitute for the order.

The Pass & Identification Office at Building 251 will issue credentials to authorized contractors. Sub-Contractors and suppliers must coordinate through the Prime-Contractor.

Criminal Activity. In accordance with ASO 5560.6B, the below list of criminal activities within an applicant's record are considered not in the best interest of the Marine Corps and will be grounds for automatic denial of access aboard the Installation:

a. Conviction for espionage, sabotage, sedition, treason, terrorism, armed robbery, or murder.

b. Felony conviction for a firearms or explosives violation, regardless of the date of conviction.

c. Conviction of crimes encompassing sexual assault or rape.

d. Conviction of crime encompassing child molestation, or the possession or production of child pornography.

e. Conviction of trafficking in persons.

f. Conviction of drug possession with intent to sell or distribute.

g. Convicted of three or more misdemeanor violations, or attempted violations, within the previous 10 years of the following offenses:

(1) Sex crime

(2) Assault

(3) Larceny

(4) Drugs

(5) Weapons

Persons requesting access to MCAS Cherry Point will be denied access based on the following:

a. The individual is a registered sex offender.

b. The individual has an active arrest warrant from Federal, State, local, or other civil law enforcement authorities, regardless of offense or violation.

c. The individual has a felony conviction within the last 10 years, regardless of the offense or violation.

d. The individual's name appears on any Federal or State agency watch list for criminal behavior or terrorist activity.

e. The individual is debarred entry or access to a Marine Corps site, other DoD installations or facilities, or other Federal site or facility.

f. The individual engaged in acts or activities designed to overthrow the U.S. Government by force.

g. The individual is known to be or reasonably suspected of being a terrorist or belongs to an organization with known terrorism links/support.

h. The individual is identified in the National Crime Information Center (NCIC) known suspected terrorist (KST) file, or the Terrorist Screening Database (TSDB) report as known to be, or suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity. If an individual is identified on the NCIC KST files or TSDB, the Provost Marshal's Office (PMO) will immediately call the NCIS Multiple Threat Alert Center (MTAC) for further coordination. The MTAC will coordinate with the Department of Justice or Federal Bureau of Investigation (FBI) and provide handling instructions to MCAS Cherry Point Police, Criminal Investigations Division (CID), or NCIS.

i. The individual is illegally present in the U.S.

j. The individual has knowingly submitted an employment questionnaire with false or fraudulent information.

k. The individual is a prisoner on a work-release program or currently on felony probation or parole.

l. The individual is pending any felony charge.

m. The individual has criminal arrest information that the site commander determines the person presents a threat to good order, discipline, or health and safety on the Marine Corps site.

n. Any reason the Installation Commander deems reasonable for good order and discipline.

1.6.3 STAGING AREA

The contractor staging area will be (PM to coordinate). Amount of material on site shall be kept to a minimum and shall only be material that is pertinent to the work currently being performed. All stockpiling of equipment and materials shall be closely coordinated with the Government and shall not disrupt activities at the site.

1.7 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by North Carolina Law.

1.8 SUPERVISION

The complexity of this project will require one person to fill the roles of the Superintendent, Quality Control Manager, and Site Safety and Health Officer.

1.9 SUBMITTALS

The following items shall have submittals delivered to the COR for approval by the government prior to the commencement of site work:

Reference attached specifications for all required submittals

1.10 PLANNED OUTAGES AND SERVICE DISRUPTIONS

Planned outages and service disruptions are requested by the contractor for approval by the Government when necessary to facilitate and/or accomplish contract work. Affected services include utilities (steam, water, waste water, and electrical service), communications (telephone, network, industrial control systems, and fire/security alarm systems, fire protection equipment, infrastructure, and road closures.

Disruption of these services cannot be allowed without written approval of the government.

The contractor is required to 1) request the outage in writing and 2) demonstrate sufficient contingency preparedness in the event that service cannot be restored due to a failure in accomplishment of contract work.

All outages require Contractor’s written request fifteen (15) days prior to commencement of such work. The request shall be submitted to the COR with the date, time, duration, and scope of the outage.

As supporting documentation for the request, the contractor is require to submit a contingency plan for all reasonably foreseen risks related to the contractor’s performance of the work that would impact disrupted services in excess of the approved outage. This plan must demonstrate the following at a minimum.

1. Understanding of key personnel and communications methods to include phone numbers.

2. Analysis of reasonable risks during the contract work that would impact disrupted services in excess of the approved outage.

3. An effective recovery plan to restore minimum essential services in the event of these risks materializing.

4. Requested government support.

The government will similarly produce risk-based contingency plans for restoration of essential services caused by reasonably foreseen factors that are not related to the performance of the contract. In these cases, the government may request the contractor make additional preparations to support essential and high risk services. Such requests are considered within the scope of this contract but will be priced and negotiated via modification as conditions warrant.

Approvals will be issued by the Public Works Officer or his/her designee and transmitted via the COR.

1.11 GOVERNMENTAL SAFETY REQUIREMENTS

Personal protective equipment (PPE) is governed in all areas by the nature of the work the employee is performing. Use personal hearing protection at all times in designated noise hazardous locations or when performing noise hazardous tasks.

Safety glasses must be worn or carried/available on each person. Mandatory PPE includes: hard hats, long pants, appropriate safety shoes, and appropriate class reflective vest.

Comply with the Safety and Health Requirements Manual (EM 385- 1-1), NFPA 70, NFPA 70E, NFPA 241, the Accident Prevention Plan (APP), the Activity Hazard Analysis (AHA), Federal and State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard prevails.

An APP in accordance with EM 385-1-1, Appendix A, is required.

An AHA in accordance with EM 385-1-1, Section 1, is required for each activity or task.

The contractor is responsible for any required permits.

1.12 EXECUTION

If during the course of the work, conditions are encountered which are not covered in the contract or are different from conditions that would be reasonably anticipated, the contractor shall immediately notify the Contracting Officer. If such conditions are hazardous or the continuation of work would cause a hazardous condition to develop, the contractor shall stop work and proceed as directed by the Contracting Officer as directed by provisions contained in other sections of this specification. This may include modifications to, or the development of a new, Health and Safety Plan for this project, and alternate or additional appropriate abatement procedures.

1.13 CLOSEOUT SUBMITTALS

1.13.1 SPARE PARTS DATA

Submit two copies of the Spare Parts Data list. Indicate manufacturer's name, part number, nomenclature, and stock level required for maintenance and repair. List those items that may be standard to the normal maintenance of the system.

1.13.2 WARRANTY MANAGEMENT PLAN

Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction. Submit two sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan narrative must contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesmen, or of engineering background, not necessarily familiar with this contract. The term "status" as indicated below must include due date and whether item has been submitted or was accomplished. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period must begin on the date of project acceptance and continue for the full product warranty period. The warranty management plan must include, but is not limited to, the following:

a. Roles and responsibilities of personnel associated with the warranty process, including points of contact and telephone numbers within the organizations of the Contractors, subcontractors, manufacturers or suppliers involved.

b. For each warranty, the name, address, telephone number, and email of each of the guarantor's representatives nearest to the project location.

c. A list and status of delivery of Certificates of Warranty for extended warranty items, including roofs, HVAC balancing, pumps, motors, transformers, and for commissioned systems, such as fire protection and alarm systems, sprinkler systems, and lightning protection systems.

d. As-Built Record of Equipment and Materials list for each warranted equipment, item, feature of construction or system indicating:

(1) Name of item.

(2) Model and serial numbers.

(3) Location where installed.

(4) Name and phone numbers of manufacturers or suppliers.

(5) Names, addresses and telephone numbers of sources of spare parts.

(6) Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

(7) Cross-reference to warranty certificates as applicable.

(8) Starting point and duration of warranty period.

(9) Summary of maintenance procedures required to continue the warranty in force.

(10) Cross-reference to specific pertinent Operation and

Maintenance manuals.

(11) Organization, names and phone numbers of persons to call for warranty service.

(12) Typical response time and repair time expected for various warranted equipment.

e. Procedure and status of tagging of equipment covered by extended warranties.

f. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty or safety reasons.

1.13.3 OPERATION & MAINTENANCE MANUALS

Provide four electronic copies of the Operation and Maintenance Manual files. Submit to the Contracting Officer for approval 30 days before the Beneficial Occupancy Date (BOD). Update and resubmit files for final approval at BOD.

Provide Humidification Contol, Building 6042 7381813

PROJECT TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 92 00 08/23 JOINT SEALANTS

DIVISION 22 - PLUMBING

22 00 00 05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 54 19 08/21 BUILDING HEATING SYSTEMS, WARM AIR

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

S U

B M

IT

T

A L

F O

R M

,J a n

P

R E

V

IO

U S

E D

IT

IO

N I

S O

B S

O L

E T

E P

A G

E

O F

P

A G

E S

P ro v id e H u m id if ic a ti o n C o n to l, B u ild in g

S D

-0

P ro d u c t

D a ta

.1

S e a la n ts

.2

B o n d

B re a k e rs

.3

B a c k s to p s

.4

C a u lk in g

.5

C le a n in g

S o lv e n ts

S D

-0

C e rt if ic a te s

.1

.1 In d o o r

A ir Q u a lit y F o r

In te ri o r

S e a la n ts

.1

.3 In d o o r

A ir Q u a lit y F o r

In te ri o r

A c o u s ti c a l S e a la n ts

.4

In d o o r A ir Q u a lit y F o r

In te ri o r

C a u lk in g

S D

-0

P ro d u c t

D a ta

R e c y c le d C o n te n t fo r S te e l P ip e

S D

-0

C e rt if ic a te s

.3

M a te ri a ls a n d

E q u ip m e n t

B o lt s

S D

-1

O p e ra ti o n a n d

M a in te n a n c e

D a ta

P lu m b in g

S y s te m

S D

-0

S h o p

D ra w in g s

.2

.3 P ip e

I n s u la ti o n S y s te m s

.3

P ip e I n s u la ti o n S y s te m s

.2

P ip e I n s u la ti o n S y s te m s

S D

-0

P ro d u c t

D a ta

S U

B M

IT

T

A L

R E

G

IS

T E

R C

O N

T R

A C

T N

O

T

IT

L E

A N

D L

O C

A T

IO

N

C O

N T

R A

C T

O R

C O

N T

R A

C T

O R

S

C H

E D

U L

E D

A T

E S

C O

N T

R A

C T

O R

A C

T

IO

N A

P P

R O

V

IN

G A

U T

H O

R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

T

IO

N

IT

E

M S

U B

M

IT

T E

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

T E

R

IA

L N

E E

D E

D B

Y

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

D A

T E

F W

D T

O A

P P

R A

U T

H

D A

T E

R C

D F

R O

M C

O N

T R

D A

T E

F W

D T

O O

T H

E R

R E

V

IE

W E

R

D A

T E

R C

D F

R O

M O

T H

R E

V

IE

W E

R

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

M A

IL

E

D T

O C

O N

T R

D A

T E

R C

D F

R M

A P

P R

A U

T H

R E

M A

R K

S

(a

(b

(c

(d

(e

(f

(g

(h

(i

(j

(k

(l

(m

(n

(o

(p

(q

(r

B M

IT

T

A L

F O

R M

,J a n

P

R E

V

IO

U S

E D

IT

IO

N I

S O

B S

O L

E T

E P

A G

E

O F

P

A G

E S

P ro v id e H u m id if ic a ti o n C o n to l, B u ild in g

.2

.3 P ip e

I n s u la ti o n S y s te m s

.3

P ip e I n s u la ti o n S y s te m s

.2

P ip e I n s u la ti o n S y s te m s

S D

-0

S a m p le s

.2

.1 .2

T h e rm a l In s u la ti o n

S D

-0

M a n u fa c tu re r’ s I n s tr u c ti o n s

.2

.3 P ip e

I n s u la ti o n S y s te m s

.3

P ip e I n s u la ti o n S y s te m s

.2

P ip e I n s u la ti o n S y s te m s

S D

-0

S h o p

D ra w in g s

.3

D D

C C o n tr a c to r D e s ig n D ra w in g s

.3

D ra ft A s -B u ilt

D ra w in g s

.3

F in a l A s -B u ilt

D ra w in g s

S D

-0

P ro d u c t

D a ta

.8

.3 P ro g ra m m in g S o ft w a re

.8

.4 C o n tr o lle r

A p p lic a ti o n P ro g ra m s

.8

.1 C o n fi g u ra ti o n S o ft w a re

.8

.2 C o n tr o lle r

C o n fi g u ra ti o n S e tt in g s

.2

M a n u fa c tu re r' s P ro d u c t

D a ta

S D

-0

T e s t

R e p o rt s

.1

.1 E x is ti n g C o n d it io n s R e p o rt

.9

.1 P re -C o n s tr u c ti o n Q u a lit y C o n tr o l

(Q C

C h e c k lis t

.9

.2 P o s t-

C o n s tr u c ti o n Q u a lit y C o n tr o l

(Q C

C h e c k lis t

.5

.2 S ta rt

-U p

T e s ti n g R e p o rt

S U

B M

IT

T

A L

R E

G

IS

T E

R C

O N

T R

A C

T N

O

T

IT

L E

A N

D L

O C

A T

IO

N

C O

N T

R A

C T

O R

C O

N T

R A

C T

O R

S

C H

E D

U L

E D

A T

E S

C O

N T

R A

C T

O R

A C

T

IO

N A

P P

R O

V

IN

G A

U T

H O

R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

T

IO

N

IT

E

M S

U B

M

IT

T E

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

T E

R

IA

L N

E E

D E

D B

Y

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

D A

T E

F W

D T

O A

P P

R A

U T

H

D A

T E

R C

D F

R O

M C

O N

T R

D A

T E

F W

D T

O O

T H

E R

R E

V

IE

W E

R

D A

T E

R C

D F

R O

M O

T H

R E

V

IE

W E

R

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

M A

IL

E

D T

O C

O N

T R

D A

T E

R C

D F

R M

A P

P R

A U

T H

R E

M A

R K

S

(a

(b

(c

(d

(e

(f

(g

(h

(i

(j

(k

(l

(m

(n

(o

(p

(q

B M

IT

T

A L

F O

R M

,J a n

P

R E

V

IO

U S

E D

IT

IO

N I

S O

B S

O L

E T

E P

A G

E

O F

P

A G

E S

P ro v id e H u m id if ic a ti o n C o n to l, B u ild in g

.6

.4 C o n tr o l C o n tr a c to r’ s P e rf o rm a n c e

V e ri fi c a ti o n T e s ti n g P la n

.6

.2 .1

E q u ip m e n t

S u p p lie r’ s

P e rf o rm a n c e

V e ri fi c a ti o n T e s ti n g

P la n

.6

.7 .3

E n d u ra n c e

T e s ti n g R e s u lt s

.6

.8 P e rf o rm a n c e

V e ri fi c a ti o n T e s t

R e p o rt

S D

-1

O p e ra ti o n a n d

M a in te n a n c e

D a ta

.7

O p e ra ti o n a n d

M a in te n a n c e

(O

M

In s tr u c ti o n s

.9

.1 T ra in in g

D o c u m e n ta ti o n

S D

-1

C lo s e o u t S u b m it ta ls

.5

E n c lo s u re K e y s

.2

.6 .1

P a s s w o rd

S u m m a ry

R e p o rt

.9

.3 C lo s e o u t Q u a lit y C o n tr o l (Q

C

C h e c k lis t

S D

-0

P re c o n s tr u c ti o n S u b m it ta ls

.3

.1 C o n tr a c to r Q u a lif ic a ti o n s

S D

-0

P ro d u c t

D a ta

C o n tr o ls

.3

H u m id if ie rs

S D

-0

T e s t

R e p o rt s

.7

.1 F ie ld

A c c e p ta n c e

T e s t

P la n s a n d

T e s t

R e p o rt s

S U

B M

IT

T

A L

R E

G

IS

T E

R C

O N

T R

A C

T N

O

T

IT

L E

A N

D L

O C

A T

IO

N

C O

N T

R A

C T

O R

C O

N T

R A

C T

O R

S

C H

E D

U L

E D

A T

E S

C O

N T

R A

C T

O R

A C

T

IO

N A

P P

R O

V

IN

G A

U T

H O

R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

T

IO

N

IT

E

M S

U B

M

IT

T E

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

T E

R

IA

L N

E E

D E

D B

Y

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

D A

T E

F W

D T

O A

P P

R A

U T

H

D A

T E

R C

D F

R O

M C

O N

T R

D A

T E

F W

D T

O O

T H

E R

R E

V

IE

W E

R

D A

T E

R C

D F

R O

M O

T H

R E

V

IE

W E

R

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

M A

IL

E

D T

O C

O N

T R

D A

T E

R C

D F

R M

A P

P R

A U

T H

R E

M A

R K

S

(a

(b

(c

(d

(e

(f

(g

(h

(i

(j

(k

(l

(m

(n

(o

(p

(q

B M

IT

T

A L

F O

R M

,J a n

P

R E

V

IO

U S

E D

IT

IO

N I

S O

B S

O L

E T

E P

A G

E

O F

P

A G

E S

P ro v id e H u m id if ic a ti o n C o n to l, B u ild in g

.7

.2 F ie ld

A c c e p ta n c e

T e s ti n g

.5

T e s t

R e p o rt s

S D

-0

M a n u fa c tu re r’ s I n s tr u c ti o n s

.2

C o n tr o ls

I n s ta lla ti o n I n s tr u c ti o n s

.2

H u m id if ie rs

I n s ta lla ti o n

In s tr u c ti o n s

S D

-1

O p e ra ti o n a n d

M a in te n a n c e

D a ta

C o n tr o ls

.3

H u m id if ie rs

S D

-1

C lo s e o u t S u b m it ta ls

.8

F ie ld T ra in in g

In d o o r A ir Q u a lit y D u ri n g

C o n s tr u c ti o n

S D

-0

P re c o n s tr u c ti o n S u b m it ta ls

.2

.1 .2

G W ir e le s s a n d

W ir e d B ro a d c a s t

C o m m u n ic a ti o n R e q u e s t

.3

.2 D e v ic e

A c c o u n t L o c k E x c e p ti o n

R e q u e s t

.2

.3 .2

M u lt ip le E th e rn e t C o n n e c ti o n

D e v ic e R e q u e s t

.8

.1 .6

C o n tr a c to r C o m p u te r

C y b e rs e c u ri ty

C o m p lia n c e

S ta te m e n ts

S U

B M

IT

T

A L

R E

G

IS

T E

R C

O N

T R

A C

T N

O

T

IT

L E

A N

D L

O C

A T

IO

N

C O

N T

R A

C T

O R

C O

N T

R A

C T

O R

S

C H

E D

U L

E D

A T

E S

C O

N T

R A

C T

O R

A C

T

IO

N A

P P

R O

V

IN

G A

U T

H O

R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

T

IO

N

IT

E

M S

U B

M

IT

T E

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

T E

R

IA

L N

E E

D E

D B

Y

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

D A

T E

F W

D T

O A

P P

R A

U T

H

D A

T E

R C

D F

R O

M C

O N

T R

D A

T E

F W

D T

O O

T H

E R

R E

V

IE

W E

R

D A

T E

R C

D F

R O

M O

T H

R E

V

IE

W E

R

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

M A

IL

E

D T

O C

O N

T R

D A

T E

R C

D F

R M

A P

P R

A U

T H

R E

M A

R K

S

(a

(b

(c

(d

(e

(f

(g

(h

(i

(j

(k

(l

(m

(n

(o

(p

(q

B M

IT

T

A L

F O

R M

,J a n

P

R E

V

IO

U S

E D

IT

IO

N I

S O

B S

O L

E T

E P

A G

E

O F

P

A G

E S

P ro v id e H u m id if ic a ti o n C o n to l, B u ild in g

.8

.6 C o n tr a c to r T e m p o ra ry

N e tw o rk

C y b e rs e c u ri ty

C o m p lia n c e

S ta te m e n ts

.6

.2 C y b e rs e c u ri ty

I n te rc o n n e c ti o n

S c h e d u le

.6

.1 P ro p o s e d S

T

IG

a n d S

R G

A p p lic a b ili ty

R e p o rt

S D

-0

S h o p

D ra w in g s

.6

.3 N e tw o rk

C o m m u n ic a ti o n R e p o rt

.6

.6 C y b e rs e c u ri ty

R is e r

D ia g ra m

S D

-0

P ro d u c t

D a ta

.6

.8 C o n tr o l S y s te m C y b e rs e c u ri ty

D o c u m e n ta ti o n

S D

-0

T e s t

R e p o rt s

.1

.1

C o n tr o l S y s te m C y b e rs e c u ri ty

T e s ti n g P ro c e d u re s

.1

.3

C o n tr o l S y s te m C y b e rs e c u ri ty

T e s ti n g R e p o rt

S D

-0

C e rt if ic a te s

.7

S o ft w a re

L ic e n s e s

S D

-1

C lo s e o u t S u b m it ta ls

.4

.5 .5

C o n fi d e n ti a l P a s s w o rd

R e p o rt

.4

.5 .5

P a s s w o rd

C h a n g e

S u m m a ry

R e p o rt

.3

.5 E n c lo s u re K e y s

S U

B M

IT

T

A L

R E

G

IS

T E

R C

O N

T R

A C

T N

O

T

IT

L E

A N

D L

O C

A T

IO

N

C O

N T

R A

C T

O R

C O

N T

R A

C T

O R

S

C H

E D

U L

E D

A T

E S

C O

N T

R A

C T

O R

A C

T

IO

N A

P P

R O

V

IN

G A

U T

H O

R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

T

IO

N

IT

E

M S

U B

M

IT

T E

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

T E

R

IA

L N

E E

D E

D B

Y

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

D A

T E

F W

D T

O A

P P

R A

U T

H

D A

T E

R C

D F

R O

M C

O N

T R

D A

T E

F W

D T

O O

T H

E R

R E

V

IE

W E

R

D A

T E

R C

D F

R O

M O

T H

R E

V

IE

W E

R

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

M A

IL

E

D T

O C

O N

T R

D A

T E

R C

D F

R M

A P

P R

A U

T H

R E

M A

R K

S

(a

(b

(c

(d

(e

(f

(g

(h

(i

(j

(k

(l

(m

(n

(o

(p

(q

B M

IT

T

A L

F O

R M

,J a n

P

R E

V

IO

U S

E D

IT

IO

N I

S O

B S

O L

E T

E P

A G

E

O F

P

A G

E S

P ro v id e H u m id if ic a ti o n C o n to l, B u ild in g

.6

.5 S o ft w a re a n d

C o n fi g u ra ti o n

B a c k u p s

.5

.3 A u d it in g F ro n t E n d

S o ft w a re

.5

.4 .1

D e v ic e A u d it R e c o rd U p lo a d

S o ft w a re

.9

S y s te m M a in te n a n c e

T o o l

S o ft w a re

.1

.2

C o n tr o l S y s te m S c a n n in g

T o o ls

.6

.7 S

T

IG

S

R G a n d V e n d o r G u id e

C o m p lia n c e

R e s u lt R e p o rt

.6

.4 C o n tr o l S y s te m I n v e n to ry R e p o rt

S D

-0

S h o p

D ra w in g s

W ir e w a y s

.1

.6 .1

M a rk in g S tr ip s

S D

-0

P ro d u c t

D a ta

C ir c u it B re a k e rs

.6

S w it c h e s

S D

-0

C e rt if ic a te s

.7

F u s e s

S U

B M

IT

T

A L

R E

G

IS

T E

R C

O N

T R

A C

T N

O

T

IT

L E

A N

D L

O C

A T

IO

N

C O

N T

R A

C T

O R

C O

N T

R A

C T

O R

S

C H

E D

U L

E D

A T

E S

C O

N T

R A

C T

O R

A C

T

IO

N A

P P

R O

V

IN

G A

U T

H O

R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

T

IO

N

IT

E

M S

U B

M

IT

T E

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

T E

R

IA

L N

E E

D E

D B

Y

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

D A

T E

F W

D T

O A

P P

R A

U T

H

D A

T E

R C

D F

R O

M C

O N

T R

D A

T E

F W

D T

O O

T H

E R

R E

V

IE

W E

R

D A

T E

R C

D F

R O

M O

T H

R E

V

IE

W E

R

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

M A

IL

E

D T

O C

O N

T R

D A

T E

R C

D F

R M

A P

P R

A U

T H

R E

M A

R K

S

(a

(b

(c

(d

(e

(f

(g

(h

(i

(j

(k

(l

(m

(n

(o

(p

(q

SECTION 07 92 00

JOINT SEALANTS

08/23

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C734 (2015; R 2024) Standard Test Method for Low-Temperature Flexibility of Latex Sealants After Artificial Weathering

ASTM C834 (2017; R 2023) Standard Specification for Latex Sealants

ASTM C919 (2024) Standard Practice for Use of Sealants in Acoustical Applications

ASTM C920 (2018; R 2024) Standard Specification for Elastomeric Joint Sealants

ASTM C1193 (2016) Standard Guide for Use of Joint Sealants

ASTM C1521 (2019; R 2020) Standard Practice for Evaluating Adhesion of Installed Weatherproofing Sealant Joints

ASTM D217 (2021a) Standard Test Methods for Cone Penetration of Lubricating Grease

ASTM D2452 (2015; R 2019) Standard Test Method for Extrudability of Oil- and Resin-Base Caulking Compounds

ASTM D2453 (2015; R 2020; E 2020) Standard Test Method for Shrinkage and Tenacity of Oil-and Resin-Base Caulking Compounds

ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2017; Version 1.2) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

SECTION 07 92 00 Page 1

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2022) Adhesive and Sealant Applications

1.2 SUBMITTALS

Government approval is required for all submittals . Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Sealants

Bond Breakers

Backstops

Caulking

Cleaning Solvents

SD-07 Certificates

Indoor Air Quality For Interior Sealants

Indoor Air Quality For Interior Acoustical Sealants

Indoor Air Quality For Interior Caulking

1.3 PRODUCT DATA

Include storage requirements, shelf life, curing time, instructions for mixing and application, and accessories. Provide manufacturer's Safety Data Sheets (SDS) for each solvent, primer and sealant material proposed.

1.4 ENVIRONMENTAL CONDITIONS

Apply sealant when the ambient temperature is between 40 and 90 degrees F.

1.5 DELIVERY AND STORAGE

Deliver materials to the jobsite in unopened manufacturers' sealed shipping containers, with brand name, date of manufacture, color, and material designation clearly marked thereon. Label elastomeric sealant containers to identify type, class, grade, and use. Handle and store materials in accordance with manufacturer's printed instructions. Prevent exposure to foreign materials or subjection to sustained temperatures exceeding 90 degrees F or lower than 0 degrees F. Keep materials and containers closed and separated from absorptive materials such as wood and insulation.

1.6 QUALITY ASSURANCE

1.6.1 Compatibility with Substrate

Verify that each sealant is compatible for use with each joint substrate in accordance with sealant manufacturer's printed recommendations for each application.

SECTION 07 92 00 Page 2

1.6.2 Joint Tolerance

Provide joint tolerances in accordance with manufacturer's printed instructions.

1.6.3 Adhesion

Provide in accordance with ASTM C1193 or ASTM C1521.

PART 2 PRODUCTS

2.1 SEALANTS

Provide sealant products that have been tested, found suitable, and documented as such by the manufacturer for the particular substrates to which they will be applied.

2.1.1 Interior Sealants

Provide ASTM C834 ASTM C920, Type S or M, Grade NS, Class 12.5, Use NT].

Provide sealant products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide certification or validation of indoor air quality for interior sealants. Location(s) and color(s) of sealant for the following (Note, color "as selected" refers to manufacturer's full range of color options):

LOCATION COLOR

c. Joints of interior masonry walls and partitions which adjoin columns, pilasters, concrete walls, and exterior walls unless otherwise detailed.

Match adjacent surface color

2.1.2 Exterior Sealants

For joints in vertical surfaces, provide ASTM C920, Type S or M, Grade NS, Class 25, Use NT. For joints in horizontal surfaces, provide ASTM C920, Type S or M, Grade P, Class 25, Use T. Provide location(s) and color(s) of sealant as follows (Note, color "as selected" refers to manufacturer's full range of color options):

LOCATION COLOR

a. Joints and recesses formed where frames and subsills of windows, doors, louvers, and vents adjoin masonry, concrete, or metal frames. Use sealant at both exterior and interior surfaces of exterior wall penetrations.

Match adjacent surface color [

b. Joints between new and existing exterior masonry walls.

Match adjacent surface color

SECTION 07 92 00 Page 3

LOCATION COLOR

g. Voids where items pass through exterior walls.

Match adjacent surface color

2.1.3 Acoustical Sealants

Rubber or polymer based acoustical sealant in accordance with ASTM C919 to have a flame spread of 25 or less and a smoke developed rating of 50 or less when tested in accordance with ASTM E84. Provide non-staining acoustical sealant with a consistency of 250 to 310 when tested in accordance with ASTM D217. Acoustical sealant must remain flexible and adhesive after 500 hours of accelerated weathering as specified in ASTM C734. Provide sealant products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide certification or validation of indoor air quality for interior acoustical sealants.

2.1.4 Preformed Sealants

Provide preformed sealants of polybutylene or isoprene-butylene based pressure sensitive weather resistant tape or bead sealants capable of sealing out moisture, air and dust when installed as recommended by the manufacturer. At temperatures from minus 30 to plus 160 degrees F, sealants must be non-bleeding and have no loss of adhesion.

2.2 BOND BREAKERS

Type and consistency as recommended by the sealant manufacturer to prevent adhesion of the sealant to the backing or to the bottom of the joint.

Provide bond breakers for interior applications that meet the indoor air quality requirements of the paragraph INTERIOR SEALANTS above.

2.3 BACKSTOPS

Provide glass fiber roving, neoprene, butyl, polyurethane, or polyethylene foams free from oil or other staining elements as recommended by sealant manufacturer. Provide 25 to 33 percent oversized backing for closed cell and 40 to 50 percent oversized backing for open cell material, unless otherwise indicated. Provide backstop material that is compatible with sealant. Do not use oakum or other types of absorptive materials as backstops.

2.4 CAULKING

For interior use and only where there is little or no anticipated joint movement. Provide in accordance with ASTM D2452 and ASTM D2453, Type 1, for oil and resin-based caulking. Provide products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide certification or validation of indoor air quality for interior caulking.

SECTION 07 92 00 Page 4

2.5 CLEANING SOLVENTS

Provide type(s) recommended by the sealant manufacturer and in accordance with environmental requirements herein. Provide solvents for interior applications that meet the indoor air quality requirements of the paragraph INTERIOR SEALANTS above.

PART 3 EXECUTION

3.1 FIELD QUALITY CONTROL

3.2 SURFACE PREPARATION

Prepare surfaces according to manufacturer's printed installation instructions. Clean surfaces from dirt, frost, moisture, grease, oil, wax, lacquer, paint, or other foreign matter that would destroy or impair adhesion. Remove oil and grease with solvent; thoroughly remove solvents prior to sealant installation. Wipe surfaces dry with clean cloths. When resealing an existing joint, remove existing caulk or sealant prior to applying new sealant. For surface types not listed below, provide in accordance with sealant manufacturer's printed instructions for each specific surface.

3.2.1 Concrete and Masonry Surfaces

Where surfaces have been treated with curing compounds, oil, or other such materials, remove materials by sandblasting or wire brushing. Remove laitance, efflorescence and loose mortar from the joint cavity. Remove resulting debris prior to sealant installation.

3.3 SEALANT PREPARATION

Do not add liquids, solvents, or powders to sealants. Mix multicomponent elastomeric sealants in accordance with manufacturer's printed instructions.

3.4 APPLICATION

3.4.1 Joint Width-To-Depth Ratios

Acceptable Ratios:

JOINT WIDTH JOINT DEPTH

Minimum Maximum

For metal, glass, or other nonporous surfaces:

1/4 inch (minimum) 1/4 inch 1/4 inch over 1/4 inch 1/2 of width Equal to width

For wood, concrete, masonry, stone, :

1/4 inch (minimum) 1/4 inch 1/4 inch

SECTION 07 92 00 Page 5

JOINT WIDTH JOINT DEPTH

Minimum Maximum over 1/4 inch to 1/2 inch 1/4 inch Equal to width over 1/2 inch to 1 inch 1/2 inch 5/8 inch

Over 1 inch prohibited

Unacceptable Ratios: Where joints of acceptable width-to-depth ratios have not been provided, clean out joints to acceptable depths and grind or cut to acceptable widths without damage to the adjoining work. Grinding is prohibited at metal surfaces.

3.4.2 Unacceptable Sealant Use

Do not install sealants in lieu of other required building enclosure weatherproofing components such as flashing, drainage components, and joint closure accessories, or to close gaps between walls, floors, roofs, windows, and doors, that exceed acceptable installation tolerances.

Remove sealants that have been used in an unacceptable manner and correct building enclosure deficiencies to comply with contract documents requirements.

3.4.3 Masking Tape

Place masking tape on the finished surface on one or both sides of joint cavities to protect adjacent finished surfaces from primer or sealant smears. Remove masking tape within 10 minutes of joint filling and tooling.

3.4.4 Backstops

Provide backstops dry and free of tears or holes. Tightly pack the back or bottom of joint cavities with backstop material to provide joints in specified depths. Provide backstops where indicated and where backstops are not indicated but joint cavities exceed the acceptable maximum depths specified in JOINT WIDTH-TO-DEPTH RATIOS Table.

3.4.5 Primer

Clean out loose particles from joints immediately prior to application

of. Apply primer to joints in concrete masonry units, wood, and other porous surfaces in accordance with sealant manufacturer's printed instructions. Do not apply primer to exposed finished surfaces.

3.4.6 Bond Breaker

Provide bond breakers to surfaces not intended to bond in accordance with, sealant manufacturer's printed instructions for each type of surface and sealant combination specified.

3.4.7 Sealants

Provide sealants compatible with the material(s) to which they are applied. Do not use a sealant that has exceeded its shelf life or has

SECTION 07 92 00 Page 6 jelled and cannot be discharged in a continuous flow from the sealant gun. Apply sealants in accordance with the manufacturer's printed instructions with a gun having a nozzle that fits the joint width. Work sealant into joints so as to fill the joints solidly without air pockets.

Tool sealant after application to ensure adhesion. Apply sealant uniformly smooth and free of wrinkles. Upon completion of sealant application, roughen partially filled or unfilled joints, apply additional sealant, and tool smooth as specified. Apply sealer over sealants in accordance with the sealant manufacturer's printed instructions.

3.5 PROTECTION AND CLEANING

3.5.1 Protection

Protect areas adjacent to joints from sealant smears. Masking tape may be used for this purpose if removed 5 to 10 minutes after the joint is filled and no residual tape marks remain.

3.5.2 Final Cleaning

Upon completion of sealant application, remove remaining smears and stains and leave the work in a clean and neat condition.

a. Masonry and Other Porous Surfaces: Immediately remove fresh sealant that has been smeared on adjacent masonry, rub clean with a solvent, and remove solvent residue, in accordance with sealant manufacturer's printed instructions. Allow excess sealant to cure for 24 hours then remove by wire brushing or sanding. Remove resulting debris.

b. Metal and Other Non-Porous Surfaces: Remove excess sealant with a solvent moistened cloth. Remove solvent residue in accordance with solvent manufacturer's printed instructions.

-- End of Section --

SECTION 07 92 00 Page 7

SECTION 22 00 00

PLUMBING, GENERAL PURPOSE

05/24, CHG 1: 11/24

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI Z21.22/CSA 4.4 (2015; R 2020) Relief Valves for Hot Water Supply Systems

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B1.20.1 (2013; R 2018) Pipe Threads, General Purpose (Inch)

ASME B16.18 (2021) Cast Copper Alloy Solder Joint Pressure Fittings

ASME B16.22 (2021) Wrought Copper and Copper Alloy Solder Joint Pressure Fittings

ASME B16.39 (2020) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300

ASME B16.50 (2021) Wrought Copper and Copper Alloy Braze-Joint Pressure Fittings

ASME B31.5 (2022) Refrigeration Piping and Heat Transfer Components

ASME B40.100 (2022) Pressure Gauges and Gauge Attachments

AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)

ASSE 1010 (2021) Performance Requirements for Water Hammer Arresters

AMERICAN WELDING SOCIETY (AWS)

AWS B2.2/B2.2M (2016) Specification for Brazing Procedure and Performance Qualification

ASTM INTERNATIONAL (ASTM)

ASTM A53/A53M (2024) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

SECTION 22 00 00 Page 1

ASTM A733 (2016; R 2022) Standard Specification for Welded and Seamless Carbon Steel and Austenitic Stainless Steel Pipe Nipples

ASTM B88 (2022) Standard Specification for Seamless Copper Water Tube

ASTM B88M (2020) Standard Specification for Seamless Copper Water Tube (Metric)

ASTM C920 (2018; R 2024) Standard Specification for Elastomeric Joint Sealants

ASTM E1 (2014) Standard Specification for ASTM Liquid-in-Glass Thermometers

COPPER DEVELOPMENT ASSOCIATION (CDA)

CDA A4015 (2016; 14/17) Copper Tube Handbook

INTERNATIONAL CODE COUNCIL (ICC)

ICC IPC (2024) International Plumbing Code

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-58 (2018) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation

MSS SP-80 (2019) Bronze Gate, Globe, Angle and Check Valves

MSS SP-83 (2014) Class 3000 Steel Pipe Unions Socket Welding and Threaded

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA MG 1 (2021) Motors and Generators

NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors

PLUMBING AND DRAINAGE INSTITUTE (PDI)

PDI WH 201 (2010) Water Hammer Arresters Standard

SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)

SAE J1508 (2023) Hose Clamp Specifications

1.2 SUBMITTALS

Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

SECTION 22 00 00 Page 2

Recycled Content for Steel Pipe

SD-07 Certificates

Materials and Equipment

Bolts

SD-10 Operation and Maintenance Data

Plumbing System

1.3 STANDARD PRODUCTS

Specified materials and equipment must be standard products of a manufacturer regularly engaged in the manufacture of such products.

Specified equipment must essentially duplicate equipment that has performed satisfactorily at least 2 years prior to bid opening. Standard products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use must include applications of equipment and materials under similar circumstances and of similar size.

The product must have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.

Where equipment is specified to conform to requirements of the ASME Boiler and Pressure Vessel Code, the design, fabrication, and installation must conform to the code and a certificate must be submitted for the equipment.

1.3.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.

1.3.2 Service Support

The equipment items must be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations must be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.3.3 Manufacturer's Nameplate

Each item of equipment must have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.

1.3.4 Modification of References

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .