7364533 Amend 0003.pdf
PDF 770 KB Posted
- Attached to
- 7364533 R149 Modifications for MSAT, B4845
- Solicitation number
- N400857364533
About this file
This is Amendment 0003 to a solicitation/modification of contract for R149 Modifications at Marine Corps Air Station (MCAS) Cherry Point, North Carolina, issued by CG MCAS Cherry Point Facilities, ROICC on May 27, 2026. The contract ID is 7364533, and the work involves modifications to Building 4845 (VMUT-2). The amendment was issued to answer pre-award inquiries (PPIs), with the proposal due date of May 29, 2026 at 12:00 PM local time remaining unchanged. No liquidated damages or estimated cost ranges are provided per FAR Section 36.204, which removed magnitude disclosure requirements from construction projects.
The amendment includes revised contract documents and drawings effective May 26, 2026: Section 01 14 00 (Work Restrictions), Drawing 12912600 (B4845 Floor Plan – Demolition), and Drawing 12912612 (Panel Schedules B4845). The pre-award inquiries address twelve key questions covering ductless split heat pump installation configurations, salvage versus demolition scope, occupied building operations during construction, government-furnished hardware coordination, fire alarm system modifications and testing, utility shutdown procedures and restrictions, door and frame scope clarification, electrical panel modifications and capacity, ceiling replacement extent, and CMU wall removal structural responsibility. Government responses clarify that work will proceed as per revised drawings and specifications, with detailed references to specific drawing sheets and work sections for contractor guidance on mechanical systems, building restrictions during occupied-building construction, door scheduling, electrical panel reuse, ceiling extents, and temporary bracing requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7364533 Amendment 0004.pdf | ||
| 7364533 Amend 0002.pdf | ||
| 7364533 Amend 0001.pdf | ||
| 7364533 Drawings As One.pdf | ||
| 7364533 Master PPI Form.xlsx | XLSX spreadsheet | |
| 7364533 RFP.pdf | ||
| 7364533 Specs As One.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0003 05/27/2026 7364533
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
MCAS Cherry Point R149 Modifications for MSAT, Building 4845, VMUT-2
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7364533 R149 Modifications for MSAT, Building 4845, VMUT-2, Marine Corps Air Station Cherry Point, NC
Amendment 0003 is being issued to answer pre-award inquires (PPI).
The deadline to submit pre-award RFI’s has passed.
The proposal due date of 29 May 2026 at 12:00 PM local time REMAINS unchanged.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
UNITED STATES MARINE CORPS
MARINE CORPS AIR STATION
POSTAL SERVICE CENTER BOX 8006
CHERRY POINT NC 28533-0006
DISTRIBUTION: DoW COMMUNITY ONLY
FAC
26 MAY 2026
From: Head, Architecture Branch To: Director, Contracting Division Via: Data Technician, Design Management & Engineering Division
Subj: AMENDMENT TO WO 7364533, R149 MODIFICATION FOR MSAT, B4845, VMUT-2 MCAS
CHERRY POINT NC
Encl: (1) Amendment Information Sheet
1. Enclosure (1) on the subject contract does not affect the price, quantity, or quality of the work.
2. For any further information, please contact the Design Manager, Leira Peed, at 466-4712.
H. M. PERRY, RA
Subj: AMENDMENT TO WO 7364533, R149 MODIFICATION FOR MSAT, B4845, VMUT-2, MCAS CHERRY POINT NC
DISTRIBUTION: DoW COMMUNITY ONLY
CONTINUATION SHEET
PROJECT TABLE OF CONTENTS
SECTION 01 14 00, WORK RESTRICTIONS, is deleted and 01 14 00, WORK RESTRICTIONS, dated 5/26/2026, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.
DOCUMENT 00 01 15
1.2 CONTRACT DRAWINGS
The following drawings are revised as of 05/26/2026:
NAVFAC DWG NO. TITLE
12912600 B4845 FLOOR PLAN – DEMOLITION, 5/26/2026
12912612 PANEL SCHEDULES B4845, 5/26/2026
These drawings accompany this Amendment.
PREAWARD INQUIRY FORM
PAGE SECTION PARAGRAPH
1 4/29/2026 RFP Can the government provide the liquidated damages and estimated cost range for this project?
Liquidated Damages will not be assessed on this project. Per the Revolutionary FAR Overhaul (RFO), FAR Section 36.204 Disclosure of the magnitude of construction projects has been REMOVED from the FAR. As a result, the government will no longer be providing magnitudes on construction projects; please bid accordingly.
2 5/8/2026 M-101 & M-501 Detail A-1 & Ductless Split Schedule On M-101, Detail A-1, it shows that two mini splits are being added (one in RM 148, one in RM 149) but the schedule shows only 1 Unit for in the indoor unit desigination and it annotates that it's only serving "Indoor RM 149 Side B".
Can you please confirm there are two (2 ea) indoor units being installed with two (2 ea) seperate line sets connecting to one (1 ea) Condensing Unit outside.
See revised Drawings M-101 & M- 501, NAVFAC Drawings# 12912606 and 12912607. M-101, See New Work Notes, work note #2 and M-501, See Ductless Split Heat Pump Schedule, Note: 5 & 6. Yes, there are two (2 ea) indoor units being installed with two (2
ea) seperate line sets connecting to one (1 ea) Condensing Unit outside.
3 5/19/2026 Contract documents require a salvage plan and note that items designated by the Contracting Officer remain Government property. Please confirm: Which specific materials/equipment are to be salvaged vs demolished.
Whether any items shown on demolition plans are to be salvaged and reinstalled.
Bid as per drawings and specs. 0003
4 5/19/2026 The building will remain occupied during construction. Please confirm: Required phasing sequence (if any). Areas that must remain operational at all times. Temporary access/egress requirements during work.
See revised 01 14 00 Work Restrictions and 12912600, dated 5/26/2026 for clarification.
5 5/19/2026 Door hardware is identified as Government-furnished and Government-installed (GFGI).
Please confirm: Contractor scope for coordination only vs temporary installation.
Whether door frames and prep must be fully compatible with Government hardware package.
See spec 08 71 00 for all hardware that is the responsibility of the contractor.
Note at the end of 3.4 Hardware Sets for additional coordination for GFGI hardware.
POSTED ON
AMENDMENT #PPI # REFERENCE QUESTION GOVERNMENT RESPONSEDATE
SUBMITTED
July 2011
PAGE SECTION PARAGRAPH AMENDMENT #PPI # QUESTION GOVERNMENT RESPONSESUBMITTED
6 5/19/2026 Fire alarm work is included for Rooms 148–150. Please confirm: Whether existing system modifications or full system extension is required.
Responsibility for programming and commissioning.
See spec 28 31 76 new speaker strobes should be in series with existing speaker strobe.
7 5/19/2026 Fire Alarm Acceptance Testing Confirm requirements for: Third-party testing vs contractor testing Government witnessing requirements for final acceptance
See spec 28 31 76 Section 3.6 and 3.7 0003
8 5/19/2026 UTILITY INTERRUPTIONS Utility Shutdown Coordination Specs require 15-day notice for utility interruptions. Please confirm: Maximum allowable outage durations Any mission-critical restrictions preventing shutdowns
See 01 25 26 Governmental Safety Requirements for Utility Outage Requirements
9 5/19/2026 addresses a discrepancy in door and frame scope between demolition and construction documents. Demolition plans reference removal of existing doors while in certain cases retaining existing frames, whereas construction notes indicate that doors and frames are to be new unless otherwise noted. A complete door and frame schedule identifying which openings are to receive new frames, reused frames, or modifications is requested to eliminate scope ambiguity.
See 12912603 for Door Schedule that details which openings receive new frames.
10 5/19/2026 addresses electrical capacity and panel modifications. Panel schedules are shown, but it is unclear whether existing panels are being reused or replaced, and whether sufficient capacity exists for added loads. Please confirm panel scope and load capacity requirements.
Panel LS is an existing panel. See revised ES601, dated 5/26/26, for Panel Schedule changes.
11 5/19/2026 requests clarification of ceiling replacement scope. Drawings indicate demolition of the existing ceiling assembly and installation of new insulation, plywood cap, and gypsum ceiling but do not clearly define if full replacement is required throughout. Please confirm extent of removal and new installation.
See revised 12912600, dated 5/26/2026, for extents of removal.
PAGE SECTION PARAGRAPH AMENDMENT #PPI # QUESTION GOVERNMENT RESPONSESUBMITTED
12 5/19/2026 concerns structural integrity during CMU wall removal. Drawings require saw-cutting walls and removing lintels but do not define structural responsibility. Please confirm whether the contractor is responsible for engineering temporary shoring and provide design criteria for new lintels.
Reference 12912600, keynote 11, for temporary shoring and bracing requirements. Reference 12912603 for lintel schedule and details.
R149 Modification for MSAT, B4845, VMUT-2 7364533
SECTION 01 14 00
WORK RESTRICTIONS
11/22, CHG 2: 05/24
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. The building will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
c. The Contractor will have access to RM 139 for the duration of construction.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic, and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Additional Personnel Requirements
1.3.1.2.1 General Construction and Finish Work
General construction and finish work of the controlled area must be performed by U.S. firms using U.S. citizens. General construction includes construction activities such as building sitework, utilities, foundations, structure, and enclosure or shell, including doors, windows, and façade work. Finish Work includes construction activities such as insulation, floor, partition, and ceiling systems; cabinet work; conveyor
05/26/2029 SECTION 01 14 00 Page 1 systems; specialties; building furnishings, fixtures, and equipment; and mechanical and electrical services and equipment including those specialized for fire protection, security, communication, control, energy conservation, safety, comfort, convenience, and similar purposes.
1.3.1.3 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .
No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.3.1.3.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .
Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.3.1.3.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
05/26/2029 SECTION 01 14 00 Page 2
1.3.1.3.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.3.1.3.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.3.1.4 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Working Hours
Regular working hours will consist of an 8 1/2 hour period, between 7:00 a.m. and 3:30 p.m., Monday through Friday, excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number, and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.4 Occupied Building
The Contractor shall be working in an existing building which is occupied.
Do not enter the building without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
05/26/2029 SECTION 01 14 00 Page 3
Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the building during the construction period.
Relocate movable furniture approximately 6 feet away from the Contractor's working area or as required to perform the work, protect the furniture, and replace the furniture in their original locations upon completion of the work. Leave attached equipment in place, and protect them against damage, or temporarily disconnect, relocate, protect, and reinstall them at the completion of the work.
1.3.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.4 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:
1.4.1 MCAS Cherry Point Regulations
No employee or representative of the contractor will be admitted to the work site without an Identification Badge or is specifically authorized admittance to the work site by the FEAD, Facilities Engineering & Acquisition Division.
IMPORTANT NOTE: FEAD personnel (Construction Managers, Engineers/Architects, Engineering Technicians, Contract Specialists, or Contract Surveillance Representatives) will not receive, process, re-transmit, or otherwise handle IN ANY WAY Personally Identifiable Information (PII) related to the badging process. Do NOT forward any of this information to the FEAD.
1.4.2 Contractor Access to MCAS Cherry Point and Outlying Areas
1. Documentation requirements for granting access to MCAS Cherry Point for commercial and contract employers and employees. This document is an aid in meeting ASO 5560.6B requirements and is not a substitute for the order.
05/26/2029 SECTION 01 14 00 Page 4
2. The Pass & Identification Office at Building 251 will issue credentials to authorized contractors. Sub-Contractors and suppliers must coordinate through the Prime-Contractor.
3. Criminal Activity. In accordance with ASO 5560.6B, the below list of criminal activities within an applicant's record are considered not in the best interest of the Marine Corps and will be grounds for automatic denial of access aboard the Installation:
a. Conviction for espionage, sabotage, sedition, treason, terrorism, armed robbery, or murder.
b. Felony conviction for a firearms or explosives violation, regardless of the date of conviction.
c. Conviction of crimes encompassing sexual assault or rape.
d. Conviction of crimes encompassing child molestation, or the possession or production of child pornography.
e. Conviction of trafficking in persons.
f. Conviction of drug possession with intent to sell or distribute.
g. Convicted of three or more misdemeanor violations, or attempted violations, within the previous 10 years of the following offenses:
(1) Sex crime
(2) Assault
(3) Larceny
(4) Drugs
(5) Weapons
4. Persons requesting access to MCAS Cherry Point will be denied access based on the following:
a. The individual is a registered sex offender.
b. The individual has an active arrest warrant from Federal, State, local, or other civil law enforecement authorities, regardless of offense or violation.
c. The individual has a felony conviction within the last 10 years, regardless of the offense or violation.
d. The individual's name appears on any Federal or State agency watch list for criminal behavior or terrorist activity.
e. The individual is debarred entry or access to a Marine Corps site, other DoD installations or facilities, or other Federal site or facility.
f. The individual engaged in acts or activities designed to overthrow the U.S. Government by force.
g. The individual is known to be or reasonably suspected of being a terrorist or belongs to an organization with known terrorism links/support.
05/26/2029 SECTION 01 14 00 Page 5
h. The individual is identified in the National Crime Information Center (NCIC) known suspected terrorist (KST) file, or the Terrorist Screening Database (TSDB) report as known to be, or suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity. If an individual is identified on the NCIC KST files or TSDB, the Provost Marshal's Office (PMO) will immediately call the NCIS Multiple Threat Alert Center (MTAC) for further coordination. The MTAC will coordinate with the Department of Justice or Federal Bureau of Investigation (FBI) and provide handling instructions to MCAS Cherry Point Police, Criminal Investigations Division (CID), or NCIS.
i. The individual is illegally present in the U.S.
j. The individual has knowingly submitted an employment questionnaire with false or fraudulent information.
k. The individual is a prisoner on a work-release program or currently on felony probation or parole.
l. The individual is pending any felony charge.
m. The individual has criminal arrest information that the site commander determines the person presents a threat to good order, discipline, or health and safety on the Marine Corps site.
n. Any reason the Installation Commander deems reasonable for good order and discipline.
1.4.3 Staging Area
As indicated on the plans, the Contractor staging area will be (Construction Manager to coordinate). Amount of material on site shall be kept to a minimum and shall only be material that is pertinent to the work currently being performed. All stockpiling of equipment and materials shall be closely coordinated with the Government and shall not disrupt activities at the site.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
05/26/2029 SECTION 01 14 00 Page 6
A1 B4845 FLOOR PLAN - DEMOLITION
N
AD101
C1 B4845 REFLECTED CEILING PLAN - DEMOLITION
N
M A
R
IN
E C
O R
P S
A
IR
S
TA
TI
O
N , C
H E
R R
Y P
O
IN
T, N
.C
FINAL
R
M
O D
IF
IC
A
TI
O N
F O
R M
S A
T, B
, V M
U T-
02.15.2026
3 4
8 8 8
8 8
KEY PLAN
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
HERITAGE ROOM
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
HERITAGE ROOM
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 5'
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 10'
AutoCAD SHX Text DEMOLISH EXISTING 3'-0" X 7'-0" WOOD DOOR, EXISTING METAL FRAME, EXISTING GYPSUM BOARD TRIM SURROUND ON BOTH SIDES OF DOOR OPENING, AND EXISTING METAL WIDE-FLANGE LINTEL. SEE DETAIL A1/A-501. DEMOLISH EXISTING 6'-0" X 7'-0" HOLLOW METAL DOOR. EXISTING METAL DOOR FRAME TO REMAIN. PREPARE FRAME FOR NEW FINISH. DEMOLISH EXISTING (7'-11" TALL X LENGTH X WIDTH DESIGNATED ON PLAN) ROLLING STORAGE SHELVES, WHEEL TRACKS, AND RUBBER MAT. DEMOLISH EXISTING EPOXY FLOORING AND 4" RESILIENT BASE. PREPARE EXISTING CONCRETE FLOOR FOR NEW FLOOR FINISH. PREPARE EXISTING CONCRETE MASONRY WALLS TO RECEIVE FINISH. EXISTING CONTROL JOINT IN CONCRETE SLAB. DEMOLISH EXISTING LIGHT FIXTURES. SEE ELECTRICAL FOR MORE INFORMATION. DEMOLISH EXISTING MECHANICAL SUPPLY AND RETURN. SEE MECHANICAL FOR MORE INFORMATION. DEMOLISH EXISTING 3/4" PLYWOOD CAP ABOVE METAL CEILING JOISTS TO THE EXTENTS INDICATED ON PLAN. DEMOLISH EXISTING GYPSUM BOARD CEILING TO THE EXTENTS INDICATED ON PLAN. SAW CUT AND REMOVE PORTION OF EXISTING 8" CMU WALL 7'-4" HIGH BY WIDTH INDICATED ON PLAN TO ACCOMMODATE NEW DOOR OPENING. PROVIDE TEMPORARY SHORING AND BRACING. REMOVE ONE COURSE OF CONCRETE MASONRY BELOW FINISH FLOOR LEVEL TO ALLOW FOR NEW DOOR SILL INSTALLATION. LOCATE WALL OPENING TO CLOSEST FULL MASONRY BLOCK.
AutoCAD SHX Text
KEYNOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
APPLIES TO THIS SHEET ONLY
AutoCAD SHX Text
1. SEE SYMBOL LEGEND ON SHEET G-001. SEE SYMBOL LEGEND ON SHEET G-001. 2. SEE FINISH SCHEDULE ON SHEET A-601 FOR ALL SEE FINISH SCHEDULE ON SHEET A-601 FOR ALL MATERIAL AND COLOR SELECTIONS 3. ALL MATERIALS ARE TO BE CONSIDERED NEW ALL MATERIALS ARE TO BE CONSIDERED NEW UNLESS SPECIFICALLY REFERRED TO AS "EXISTING". 4. DOORS INDICATED WITH A NUMBER IN THE DOORS INDICATED WITH A NUMBER IN THE CONSTRUCTION PLAN MUST BE NEW DOORS AND NEW FRAMES UNLESS OTHERWISE NOTED. REFER TO THE DOOR SCHEDULE SHEET A-601 FOR NEW DOOR DESCRIPTIONS. 5. WALLS INDICATED WITH A NUMBER ARE NEW. SEE WALLS INDICATED WITH A NUMBER ARE NEW. SEE WALL TYPES SCHEDULE SHEET A-501. 6. DIMENSIONS ORIGINATE FROM THE FACE OF STEEL DIMENSIONS ORIGINATE FROM THE FACE OF STEEL STUDS AND FACE OF CONCRETE MASONRY UNLESS OTHERWISE NOTED. 7. WALLS MUST EXTEND TO THE STRUCTURE ABOVE WALLS MUST EXTEND TO THE STRUCTURE ABOVE UNLESS OTHERWISE NOTED. 8. SEE DETAIL A4/A-601 FOR SIGNAGE DETAILS. SEE DETAIL A4/A-601 FOR SIGNAGE DETAILS. 9. EXISTING CEILING IS GYPSUM BOARD FASTENED TO EXISTING CEILING IS GYPSUM BOARD FASTENED TO CEILING JOISTS ±8'-6" ABOVE FINISH FLOOR.CEILING JOIST ARE ±1'-4" ON CENTER.10. FIRE SPRINKLER PENDANTS AND PIPING ARE FIRE SPRINKLER PENDANTS AND PIPING ARE EXISTING TO REMAIN.
AutoCAD SHX Text
B4845 FLOOR PLAN - DEMOLITION
AutoCAD SHX Text 12912600
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
UNCLASSIFIED - FOR OFFICIAL USE ONLY
AutoCAD SHX Text
UNCLASSIFIED - FOR OFFICIAL USE ONLY
AutoCAD SHX Text
UNCLASSIFIED - FOR OFFICIAL USE ONLY
AutoCAD SHX Text
SPEC. NO.
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
STA. PROJ. NO.
AutoCAD SHX Text
FED NO.
AutoCAD SHX Text
CODE ID. NO. 80091 SIZE D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
CHIEF ARCH./ ENGR.
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
DESIGN DIRECTOR
AutoCAD SHX Text A/E
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
QC
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
REVIEW
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
EFD
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY - SATISFACTORY TO
AutoCAD SHX Text
FOR EFD FOR COMMANDER NAVFAC
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
DESIGNED & ENGINEERED BY:
AutoCAD SHX Text
FACILITIES ENGINEERING
AutoCAD SHX Text
CHERRY POINT, NC
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT STATION
AutoCAD SHX Text
HLP
AutoCAD SHX Text
LTP
AutoCAD SHX Text 7364533
AutoCAD SHX Text
LPF
AutoCAD SHX Text
LTP
AutoCAD SHX Text
LTP
AutoCAD SHX Text
LPF
AutoCAD SHX Text 2'-2"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 16'-8"
AutoCAD SHX Text 17'-2"
AutoCAD SHX Text 53'-6 "12"
AutoCAD SHX Text 13'-4"
AutoCAD SHX Text ±15'-0"
AutoCAD SHX Text
SCALE: 1/32"=1'-0"
AutoCAD SHX Text 3'-4"
AutoCAD SHX Text 14'-8"
AutoCAD SHX Text ±53'-612"
AutoCAD SHX Text ±13'-4"
AutoCAD SHX Text
GYPSUM BOARD CEILING DEMO
AutoCAD SHX Text 5/26/26
AutoCAD SHX Text
LTP
A B C
LOAD (A)
PANEL: LS 208Y/120V, 3PHASE, 4WIRE 100A
BLDG. 4845 PANELBOARD SCHEDULE
LOAD SERVED LOAD SERVEDCKT.
NO.
CKT.
NO.
WIRE
SIZE
BKR.
TRIP A B C
PHASE LOAD (A)
A B C
WIRE
SIZE
BKR.
TRIP
ES601
M A
R
IN
E C
O R
P S
A
IR
S
TA
TI
O
N , C
H E
R R
Y P
O
IN
T, N
.C
R
M
O D
IF
IC
A
TI
O N
F O
R M
S A
T, B
, V M
U T-
File details come from the government source that posted it. Updated .