Amendment 0002.pdf

PDF 983 KB Posted

Attached to
7232046 Renovate Driving Range Restroom Facility
Solicitation number
N400857232046
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a federal construction project issued by the U.S. Marine Corps at Cherry Point, North Carolina.

Project Overview and Key Details: The solicitation concerns the renovation of the Driving Range Restroom Facility, Building 4608, at Marine Corps Air Station (MCAS) Cherry Point, North Carolina, with contract ID code 7232046. Amendment 0002 was issued on September 1, 2026, to provide revised drawings and answer Pre-Award Inquiries (PPIs). The proposal due date of September 3, 2026, at 12:00 PM local time remains unchanged, and the deadline for submitting pre-award RFIs has passed. The contracting office is located at MCAS Cherry Point Facilities, ROICC, B-87, 748 Roosevelt Boulevard, Cherry Point, NC 28533 (Code N40085).

Work Requirements and Specifications: The project requires renovation of restroom facilities including plumbing, fixtures, and water service systems. Key specifications include: provision of three temporary toilets for driving range patrons with twice-weekly servicing during construction; installation of an instantaneous electric water heater (120V, 3.0 kW) with specified temperature rise capabilities; plumbing fixtures including lavatories, water closets, and a water fountain with bottle filler (Elkay LVRCTL8WSK model) located on the exterior wall between restrooms; utility connections including domestic water and sanitary sewer within the 5-foot line; and hazardous material remediation limited to identified report findings. The contract requires contractor compliance with DBIDS (Defense Biometrics Identification System) access requirements, adherence to a no-smoking policy, regular working hours of 7:00 AM to 3:30 PM Monday through Friday, and coordination of utility cutovers outside normal business hours. The contractor must provide contact personnel lists, maintain security protocols, and minimize on-site material stockpiling.

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
Master PPI Form.xlsx XLSX spreadsheet
7232046 RFP.pdf PDF
7232046 Specs As One.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 09/01/2026 7232046

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

CG MCAS Cherry Point

FACILITIES, ROICC

B-87, 748 Roosevelt Blvd.

PSC BOX 8006

CHERRY POINT, NC 28533

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION

Renovate Driving Range Restroom Facility, B4608

9B. DATED (SEE ITEM 11)

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

7232046 Renovate Driving Range Restroom Facility, Building 4608, Marine Corps Air Station Cherry Point, NC

Amendment 0002 is being issued to provide revised drawings and answer PPIs.

The deadline to submit pre-award RFI’s has passed.

The proposal due date of 03 September 2026 at 12:00 PM local time REMAINS.

See Attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

PREAWARD INQUIRY FORM

PAGE SECTION PARAGRAPH

8/27/2026 285 286 302 313 22 00 00

Provide a coordinated restroom fixture/accessory schedule or explicit note confirming the exact accessible fixture and accessory set required in each restroom, including mounting criteria where they differ from standard details.

See A-101 for accessory schedule.

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

8/27/2026 177 306 22 00 00

Identify the exact utility connection scope to be carried in the base bid for domestic water and sanitary piping, including any required work beyond the 5-foot line and the location of each tie-in point.

See C-001 for utility scope. Submit proposals in accordance with RFP, Specificaions, Drawings, and all amendments.

8/27/2026 184 185 187 188 01 80 00

Confirm that base-bid hazardous-material scope is limited to the identified report findings and state how unsampled or differing hazardous conditions discovered during demolition will be compensated.

See 01 35 26. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.

8/27/2026 7 01 14 00 1.2.A State the required temporary toilet type, accessibility standard, servicing frequency, any required utility connections, and the designated location for the unit during construction.

See revised 01 14 00 Work Restrictions.

8/27/2026

Please clarify if the water meter shown in Detail 1 is existing-to-remain, owner furnished, or contractor furnished. If contractor furnished, please provide model, authority acceptance requirements, and utility coordination procedure.

See Note C2 on Sheet C-001. Submit propasal in accordance with RFP, specifications, drawings and all amendments.

8/27/2026

Civil Note C3 calls for a 2'x2'x4" concrete pad at the yard hydrant. A-101 Keynote 12 calls for a 4" concrete pad. A-601 Detail A4 appears to indicate a 5" concrete slab section.

Please confirm required slab thickness and reinforcement.

See revised 12891816 Detail 2. 0002

8/27/2026

Demolition Keynote 19 directs contractor to clear roof of debris and vegetative growth. No roofing repair scope or roof condition report is provided. Please clarify whether any roof repairs, membrane replacement, flashing repairs, or leak remediation are required as part of this project.

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

8/27/2026

Existing 1x8 column covers are to be removed and replaced, while structural wood columns remain. Please provide clarification regarding expected repair/replacement of deteriorated structural wood discovered after removal of column wraps.

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

8/27/2026

P-501 identifies a 120V, 3.0kW instantaneous water heater but does not identify manufacturer or approved basis-of-design model. Please provide manufacturer/model and intended performance requirements.

P501 updated with manufacturer/model and intended performance requirements

POSTED ON

AMENDMENT #PPI #

REFERENCE

QUESTION GOVERNMENT RESPONSE

DATE

SUBMITTE

D

C-001 Detail 1 Spec 22 00 00 Para. 2.5 Backflow Preventers

C-001 Note C3 A-101 Keynote 12 A-601 Detail A4

AD-101 Keynote 19

AD-101 Keynote 7 A-101 Keynote 4 Spec Section 06 20 00 Finish Carpentry

P-101 Keynote 2 P-501 Equpment Schedule D-WH-1

July 2011 # DISTRIBUTION: DoW COMMUNITY ONLY

POSTED ON

AMENDMENT #PPI # QUESTION GOVERNMENT RESPONSESUBMITTE

D

8/27/2026 Please provide approved manufacturer and model number for the water cooler/bottle filler assembly and clarify whether filtered water is required.

ELKAY / LVRCTL8WSK P501

updated with manufacturer/model Filtered water is required.

8/27/2026 Please identify total linear footage of slab expansion joints requiring sealant replacement and whether complete depth joint cleaning and reconstruction is intended.

See dimensions on AD101. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

8/27/2026 Please confirm whether pressure washing, masonry repairs, crack repair, block filler application, and complete repainting of all exposed CMU surfaces are required.

See 09 90 00 and A-601 finish schedule. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

8/27/2026

The report identifies lead-containing paint on restroom walls but drawings do not clearly identify the extent of disturbance.

Please confirm whether contractor is required to perform lead abatement, lead stabilization, or lead-safe work practices only.

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

14 8/27/2026 P-101 3 Keynote 3 on drawing P-101 states to "provide new water cooler. The new water cooler must be piped direct from water source with no additional ports or taps. See electrical drawings for more information." Are we not to use the existing water line that is currently installed and stubbed out of the wall?

Yes we are using the current plumbing that is stubbed out of the wall

15 8/27/2026 Regarding the installation of the new water cooler, there does not seem to be any notation for block removal. Will there be any need for block removal or concrete cutting to install a new water line to connect to the new water cooler?

No there will be no block removal as we are using the existing plumbing.

16 8/27/2026 If a new water line is to be installed for the new water cooler, where do we make the connection point? This connection is not shown in the drawings. Will we need to provide a backflow preventer for this water line?

We are using the existing plumbing. 0002

17 8/27/2026 Keynote 3 on Drawing P-101 states to provide new water cooler. The new water cooler must be piped direct from water source with no additional ports or taps. See electrical drawings for more information. Are we not to use the exiting water line that is currently installed and stubbed out of the wall?

Yes we are using the current plumbing that is stubbed out of the wall

18 8/27/2026 Regarding installation of the new water cooler, there does not seem to be any notation for block removal. Will there be any need for block removal or concrete cutting to install a new water line to connect to the new water cooler?

No there will be no block removal as we are using the existing plumbing.

P-101 Keynote 3 P-501 water fountain detail Spec 22 00 00 para.2.4.3

AD-101 Keynote 16 A-101 Keynote 11 Spec 07 92 00 Joint Sealants

A-601 Finish Schedule Spec 09 90 00

Spec 01 80 00 Report CE&I Assessment Report Spec 02 83 00 Lead Remediation

POSTED ON

AMENDMENT #PPI # QUESTION GOVERNMENT RESPONSESUBMITTE

D

19 8/27/2026 If a new water line is to be installed for the new water cooler, where do we make the connection point? This connection is not shown in the drawings. Will we need to provide a backflow preventor for this water line?

We are using the existing plumbing. 0002

20 8/27/2026 P-101 Keynote 3 on Drawing P-101 states to provide new water cooler. The new water cooler must be piped direct from water source with no additional ports or taps. See electrical drawings for more information. Are we not to use the exiting water line that is currently installed and stubbed out of the wall?

Yes we are using the current plumbing that is stubbed out of the wall

21 8/27/2026 P-101 Regarding installation of the new water cooler, there does not seem to be any notation for block removal. Will there be any need for block removal or concrete cutting to install a new water line to connect to the new water cooler?

No there will be no block removal as we are using the existing plumbing.

22 8/27/2026 P-101 If a new water line is to be installed for the new water cooler, where do we make the connection point? This connection is not shown in the drawings. Will we need to provide a backflow preventor for this water line?

We are using the existing plumbing. 0002

Renovate Driving Range Restroom Facility, B4608 7232046

SECTION 01 14 00

WORK RESTRICTIONS

11/22, CHG 1: 02/23

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. For the duration of construction, the Contractor must provide (3) temporary toilets for use of Driving Range patrons only located near B4608. The Contractor must also provide servicing of temporary toilet twice a week. Coordinate final location with Contracting Officer.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, including delivery vehicles, are clearly identified with their company name.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

08/31/26 SECTION 01 14 00 Page 1

1.3.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.3.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.3.1.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.3.1.2.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office

08/31/26 SECTION 01 14 00 Page 2 are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.3.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.2 Working Hours

Regular working hours will consist of an 8 1/2 hour period, between 7 a.m.

and 3:30 p.m., Monday through Friday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number, and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.4 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to 4 hours. This time limit includes time for deactivation and reactivation.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

08/31/26 SECTION 01 14 00 Page 3

1.4 SECURITY REQUIREMENTS

1.4.1 Station Regulations

No employee or representative of the contractor will be admitted to the work site without an Identification Badge or is specifically authorized admittance to the work site by the FEAD, Facilities Engineering & Acquisition Division.

IMPORTANT NOTE: FEAD personnel (Construction Managers, Engineers/Architects, Engineering Technicians, Contract Specialists, or Contract Surveillance Representatives) will not receive, process, re-transmit, or otherwise handle IN ANY WAY Personally Identifiable Information (PII) related to the badging process. Do NOT forward any of this information to the FEAD.

1.4.2 Contractor Access to MCAS Cherry Point and Outlying Areas

1. Documentation requirements for granting access to MCAS Cherry Point for commercial and contract employers and employees. This document is an aid in meeting ASO 5560.6B requirements and is not a substitute for the order.

2. The Pass & Identification Office at Building 251 will issue credentials to authorized contractors. Sub-Contractors and suppliers must coordinate through the Prime-Contractor.

3. Criminal Activity. In accordance with ASO 5560.6B, the below list of criminal activities within an applicant's record are considered not in the best interest of the Marine Corps and will be grounds for automatic denial of access aboard the Installation:

a. Conviction for espionage, sabotage, sedition, treason, terrorism, armed robbery, or murder.

b. Felony conviction for a firearms or explosives violation, regardless of the date of conviction.

c. Conviction of crimes encompassing sexual assault or rape.

d. Conviction of crime encompassing child molestation, or the possession or production of child pornography.

e. Conviction of trafficking in persons.

f. Conviction of drug possession with intent to sell or distribute.

g. Convicted of three or more misdemeanor violations, or attempted violations, within the previous 10 years of the following offenses:

(1) Sex crime

(2) Assault

(3) Larceny

(4) Drugs

(5) Weapons

08/31/26 SECTION 01 14 00 Page 4

4. Persons requesting access to MCAS Cherry Point will be denied access based on the following:

a. The individual is a registered sex offender.

b. The individual has an active arrest warrant from Federal, State, local, or other civil law enforecement authorities, regardless of offense or violation.

c. The individual has a felony conviction within the last 10 years, regardless of the offense or violation.

d. The individual's name appears on any Federal or State agency watch list for criminal behavior or terrorist activity.

e. The individual is debarred entry or access to a Marine Corps site, other DoD installations or facilities, or other Federal site or facility.

f. The individual engaged in acts or activities designed to overthrow the U.S. Government by force.

g. The individual is known to be or reasonably suspected of being a terrorist or belongs to an organization with known terrorism links/support.

h. The individual is identified in the National Crime Information Center (NCIC) known suspected terrorist (KST) file, or the Terrorist Screening Database (TSDB) report as known to be, or suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity. If an individual is identified on the NCIC KST files or TSDB, the Provost Marshal's Office (PMO) will immediately call the NCIS Multiple Threat Alert Center (MTAC) for further coordination. The MTAC will coordinate with the Department of Justice or Federal Bureau of Investigation (FBI) and provide handling instructions to MCAS Cherry Point Police, Criminal Investigations Division (CID), or NCIS.

i. The individual is illegally present in the U.S.

j. The individual has knowingly submitted an employment questionnaire with false or fraudulent information.

k. The individual is a prisoner on a work-release program or currently on felony probation or parole.

l. The individual is pending any felony charge.

m. The individual has criminal arrest information that the site commander determines the person presents a threat to good order, discipline, or health and safety on the Marine Corps site.

n. Any reason the Installation Commander deems reasonable for good order and discipline.

1.4.3 Staging Area

As indicated on the plans, the Contractor staging area will be (CM to

08/31/26 SECTION 01 14 00 Page 5 coordinate). Amount of material on site shall be kept to a minimum and shall only be material that is pertinent to the work currently being performed. All stockpiling of equipment and materials shall be closely coordinated with the Government and shall not disrupt activities at the site.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

08/31/26 SECTION 01 14 00 Page 6

C-001

M A

R

IN

E C

O R

P S

A

IR

S

TA

TI

O

N , C

H E

R R

Y P

O

IN

T, N

.C

R E

N O

V A

TE

D

R

IV

IN

G

R A

N G

E R

E S

TR

O

O

FA

C

IL

IT

Y

, B

12.14.2023

WATER SERVICE

FROST-PROOF YARD HYDRANT

BOLLARD

AutoCAD SHX Text

UTILITY PLAN

AutoCAD SHX Text 12891816

AutoCAD SHX Text

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 07 AUG 2018

AutoCAD SHX Text

UNCLASSIFIED - FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED - FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED - FOR OFFICIAL USE ONLY

AutoCAD SHX Text

SPEC. NO.

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

STA. PROJ. NO.

AutoCAD SHX Text

FED NO.

AutoCAD SHX Text

CODE ID. NO. 80091 SIZE D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text

CHIEF ARCH./ ENGR.

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

DESIGN DIRECTOR

AutoCAD SHX Text A/E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

QC

AutoCAD SHX Text

DESIGN

AutoCAD SHX Text

REVIEW

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

EFD

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY - SATISFACTORY TO

AutoCAD SHX Text

FOR EFD FOR COMMANDER NAVFAC

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

DESIGNED & ENGINEERED BY:

AutoCAD SHX Text

FACILITIES ENGINEERING

AutoCAD SHX Text

HAVELOCK, NC

AutoCAD SHX Text

AutoCAD SHX Text

CHERRY POINT

AutoCAD SHX Text

HMP

AutoCAD SHX Text

EJF

AutoCAD SHX Text N/A

AutoCAD SHX Text 7232046

AutoCAD SHX Text

LPF

AutoCAD SHX Text

EJF

AutoCAD SHX Text

LTP

AutoCAD SHX Text

LPF

AutoCAD SHX Text NOTES: : 1) WATER METER BOX SHALL BE H20 RATED. 2) BOX AND LID SHALL BE CAST GRAY IRON, ASTM A48, CLASS 25. 3) ALL BRASS COMPONENTS SHALL BE 'NO LEAD' BRASS MEETING UNS C89833 AS PER ASTM B584.

AutoCAD SHX Text

SIDE VIEW

AutoCAD SHX Text

END VIEW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

EASEMENT

AutoCAD SHX Text

UNDISTURBED SOIL

AutoCAD SHX Text

12" #57 WASHED STONE

AutoCAD SHX Text

EXISTING GRADE

AutoCAD SHX Text

3/4" CLASS 200 POLYETHYLENE

AutoCAD SHX Text

34" TEE

AutoCAD SHX Text 11 "2732"

AutoCAD SHX Text 12 "12"

AutoCAD SHX Text

18 " OPENING18" OPENING

AutoCAD SHX Text 9"

AutoCAD SHX Text 26 "2932"

AutoCAD SHX Text

AutoCAD SHX Text

ASSE

AutoCAD SHX Text

WATER

AutoCAD SHX Text

METER

AutoCAD SHX Text

8" OPENING

AutoCAD SHX Text

TOP VIEW

AutoCAD SHX Text

CAST PLUG WITH PIN

AutoCAD SHX Text

LOCKING LID

AutoCAD SHX Text

LOCK NUT (2)

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

ASSE 1024 NO LEAD DUAL CHECK VALVE

AutoCAD SHX Text

TO YARD HYDRANT

AutoCAD SHX Text

AutoCAD SHX Text C-001

AutoCAD SHX Text

RESERVOIR

AutoCAD SHX Text 18"

AutoCAD SHX Text 27"

AutoCAD SHX Text 2'x2'x4" CONCRETE

AutoCAD SHX Text

SLAB WITH 6X6 W1.4XW1.4

AutoCAD SHX Text

REINFORCEMENT FLUSH

AutoCAD SHX Text

SANITARY FROST PROOF YARD HYDRANT WITH

AutoCAD SHX Text

VACUUM BREAKER & 3/4" MALE

AutoCAD SHX Text

HOSE NOZZLE. VACUUM BREAKER

AutoCAD SHX Text

SHALL BE NON FREEZE TYPE

AutoCAD SHX Text CONFORMING TO ASSE No. 1057

AutoCAD SHX Text

FOR APPLICATIONS WITHOUT

AutoCAD SHX Text

CONTINUOUS PRESSURE

AutoCAD SHX Text

CAST IRON METER BOX

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

3/4" CLASS 200 POLYETHYLENE

AutoCAD SHX Text

AutoCAD SHX Text C-001

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text CIVIL NOTES: C1. REMOVE AND DISPOSE OF EXISTING HYDRANT SERVICE AND YARD HYDRANT. C2. PROVIDE 3/4" PE SERVICE LINE AND APPURTENANCES. SEE DETAIL 1, SHEET C-001 C3. PROVIDE SANITARY FROST FREE YARD HYDRANT (WOODFORD S3 OR EQUAL). PLACE 2'X2'X4" CONCRETE PAD AROUND YARD HYDRANT. SEE DETAIL 2, SHEET C-001 C4. PROVIDE 2 BOLLARDS TO PROTECT YARD HYDRANT. EXISTING POLE TO PROTECT OTHER SIDE OF YARD HYDRANT. SEE DETAIL 3, SHEET C-001.

AutoCAD SHX Text GENERAL NOTES: : 1. LOCATION AND SIZE OF WATER LINE IS BASED ON GIS DATA AND RECORD DRAWINGS. CONFLICTING INFORMATION WAS LOCATION AND SIZE OF WATER LINE IS BASED ON GIS DATA AND RECORD DRAWINGS. CONFLICTING INFORMATION WAS FOUND REGARDING THE SIZE AND MATERIAL. CONTRACTOR SHALL LOCATE AND VERIFY SIZE AND MATERIAL OF EXISTING WATER LINE BEFORE ORDERING NEW MATERIALS. 2. CONTRACTOR SHALL HAVE A COMPLETE SET OF CONSTRUCTION DRAWINGS, SPECIFICATIONS, ADDENDA, AND APPROVED CONTRACTOR SHALL HAVE A COMPLETE SET OF CONSTRUCTION DRAWINGS, SPECIFICATIONS, ADDENDA, AND APPROVED PERMITS ON THE JOB SITE AT ALL TIMES. 3. CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT WORK REQUIRED TO PROPERLY CONSTRUCT THE WORK. ALL UTILITIES CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT WORK REQUIRED TO PROPERLY CONSTRUCT THE WORK. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. 4. NOT ALL EXISTING UTILITIES ARE SHOWN ON THE PLAN. LOCATION AND ELEVATION OF EXISTING UTILITIES ARE SHOWN NOT ALL EXISTING UTILITIES ARE SHOWN ON THE PLAN. LOCATION AND ELEVATION OF EXISTING UTILITIES ARE SHOWN IN APPROXIMATE MANNER ONLY. THE CONTRACTOR IS RESPONSIBLE FOR LOCATION OF ALL EXISTING UNDERGROUND UTILITIES. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES BEFORE CONSTRUCTION BEGINS AND COORDINATE CHANGES TO UTILITIES, IF NEEDED, WITH THE CONTRACTING OFFICER. 5. CONTRACTOR SHALL REPAIR ANY DAMAGE DONE TO EXISTING FACILITIES DUE TO CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL REPAIR ANY DAMAGE DONE TO EXISTING FACILITIES DUE TO CONSTRUCTION ACTIVITIES. 6. CONTRACTOR SHALL REPAIR ALL IMPROVEMENTS TO EXISTING OR BETTER CONDITIONS IF DISTURBED DURING CONTRACTOR SHALL REPAIR ALL IMPROVEMENTS TO EXISTING OR BETTER CONDITIONS IF DISTURBED DURING CONSTRUCTION. 7. CONTRACTOR SHALL PROVIDE MEASURES AS NECESSARY DURING CONSTRUCTION FOR SEDIMENTATION AND EROSION CONTRACTOR SHALL PROVIDE MEASURES AS NECESSARY DURING CONSTRUCTION FOR SEDIMENTATION AND EROSION CONTROL. 8. ALL EROSION CONTROL DEVICES SHALL BE IN PLACE BEFORE COMMENCEMENT OF CONSTRUCTION ACTIVITIES. ALL EROSION CONTROL DEVICES SHALL BE IN PLACE BEFORE COMMENCEMENT OF CONSTRUCTION ACTIVITIES. 9. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND APPROVALS PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND APPROVALS PRIOR TO BEGINNING CONSTRUCTION. 10. ALL DEBRIS HAULING TRUCKS SHALL FULLY COVER LOADS WHEN HAULING MATERIALS FROM THE SITE. ALL DEBRIS HAULING TRUCKS SHALL FULLY COVER LOADS WHEN HAULING MATERIALS FROM THE SITE. 11. KEEP TRAVELWAYS FREE OF DEBRIS AT ALL TIMES. KEEP TRAVELWAYS FREE OF DEBRIS AT ALL TIMES. 12. CONTRACTOR SHALL ESTABLISH A LAYDOWN AREA IN COORDINATION WITH CONTRACTING OFFICER. CONTRACTOR SHALL ESTABLISH A LAYDOWN AREA IN COORDINATION WITH CONTRACTING OFFICER. 13. CONTRACTOR SHALL MAKE EVERY EFFORT TO SAVE IRONS, MONUMENTS, OTHER PERMANENT POINTS AND LINES OF CONTRACTOR SHALL MAKE EVERY EFFORT TO SAVE IRONS, MONUMENTS, OTHER PERMANENT POINTS AND LINES OF REFERENCE AND CONSTRUCTION STAKES. IRONS, MONUMENTS, AND OTHER PERMANENT POINTS OF REFERENCE DESTROYED BY THE CONTRACTOR SHALL BE REPLACED BY A LICENSED LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE. 14. PROTECT EXISTING UTILITY LINES THAT ARE INDICATED TO REMAIN. PROTECT EXISTING UTILITY LINES THAT ARE INDICATED TO REMAIN. 15. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF DAMAGE TO OR AN ENCOUNTER WITH AN UNKNOWN EXISTING NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF DAMAGE TO OR AN ENCOUNTER WITH AN UNKNOWN EXISTING UTILITY LINE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIRS OF DAMAGE TO EXISTING UTILITY LINES THAT ARE TO REMAIN ACTIVE. 16. BURNING IS NOT PERMITTED ON SITE. BURNING IS NOT PERMITTED ON SITE. 17. EXCAVATION AND CONSTRUCTION SHALL PROCEED ACCORDING TO THE LATEST OSHA REGULATIONS AND THE EM 385.EXCAVATION AND CONSTRUCTION SHALL PROCEED ACCORDING TO THE LATEST OSHA REGULATIONS AND THE EM 385.

AutoCAD SHX Text C1/C2

AutoCAD SHX Text C3

AutoCAD SHX Text 30'

AutoCAD SHX Text

SCALE: 1" = 10'

AutoCAD SHX Text 5'

AutoCAD SHX Text

AutoCAD SHX Text 5'

AutoCAD SHX Text 10'

AutoCAD SHX Text 50'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ex. water line

AutoCAD SHX Text 3'-2"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text

GRADE SURFACE

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

12" DIA.

AutoCAD SHX Text

CONCRETE FOOTING

AutoCAD SHX Text

1" CROWN

AutoCAD SHX Text

SCHEDULE 40 STEEL PIPE

AutoCAD SHX Text

4" DIAMETER-

AutoCAD SHX Text

BLACK & YELLOW STRIPES.

AutoCAD SHX Text

PAINT 4" WIDE ALTERNATING

AutoCAD SHX Text

3" DOME FILL POST

AutoCAD SHX Text

WITH CONCRETE

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

AutoCAD SHX Text C-001

AutoCAD SHX Text C4

AutoCAD SHX Text

WITH GRADE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CORRECTED SLAB THICKNESS & REINFORCEMENT

AutoCAD SHX Text 8/28/2026

EJF

P-501

A

R

IN

E C

O R

P S

A

IR

S

TA

TI

O

N , C

H E

R R

Y P

O

IN

T, N

.C

FINAL

R E

N O

V A

TE

D

R

IV

IN

G

R A

N G

E R

E S

TR

O

O

FA

C

IL

IT

Y

, B

XX.XX.XXXX

PLUMBING EQUIPMENT SCHEDULE

TAG TYPE DESCRIPTION LOCATION TEMPERATURE RISE FAHRENHEIT/GPM MANUFACTURER/MODEL

D-WH-1 INSTANTANEOUS WATER

HEATER

INSTANTANEOUS ELECTRIC WATER HEATER

120V / SINGLE PHASE / 3.0 KW IN RESTROOMS NEXT TO SINK

0.3GPM 0.5GPM 0.75GPM 1.0GPM 1.5GPM 2.0GPM

68 41 27 20 14 10

PLUMBING FIXTURE SCHEDULE

DESCRIPTION

ROUGH-INS (INCHES)

REMARKS

WASTE TRAP VENT CW HW

LAVATORY, VITREOUS CHINA, UNDERMOUNT 17" NOMINAL DIMENSION 2" 1 1/4" 2" 1/2" 1/2"

WATER CLOSET, VITREOUS CHINA, FLOOR-MOUNTED, ELONGATED BOWL, RIM @ 15" AFF 3" -- 2" 1/2" --

FLOOR DRAIN, NICKEL BRONZE, SOLVENT WELD, 3" PIPE DIAMETER 3" -- 2" -- --

2" 1/2"WATER FOUNTAIN WITH WATER BOTTLE FILLER

A4 WATER FOUNTAIN AND BOTTLE FILLER

2" 1 1/4" --

EEMAX / SPEX3012

WATER FOUNTAIN AND BOTTLE FILLER SCHEDULE

TAG TYPE DESCRIPTION LOCATION

D-WH-1 WATER FOUNTAIN AND BOTTLE

FILLER

EZH2O BOTTLE FILLING STATION & VERSILITE

BI LEVEL ADA COOLER FILTERED,

REFRIGERATED

EXTERIOR WALL BETWEEN THE RESTROOMS ELKAY / LVRCTL8WSK

MANUFACTURER / MODEL

AutoCAD SHX Text

PLUMBING SCHEDULE AND DETAILS

AutoCAD SHX Text 12891824

AutoCAD SHX Text

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 07 AUG 2018

AutoCAD SHX Text

UNCLASSIFIED - FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED - FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED - FOR OFFICIAL USE ONLY

AutoCAD SHX Text

SPEC. NO.

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

STA. PROJ. NO.

AutoCAD SHX Text

FED NO.

AutoCAD SHX Text

CODE ID. NO. 80091 SIZE D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text

CHIEF ARCH./ ENGR.

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

DESIGN DIRECTOR

AutoCAD SHX Text A/E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

QC

AutoCAD SHX Text

DESIGN

AutoCAD SHX Text

REVIEW

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

EFD

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY - SATISFACTORY TO

AutoCAD SHX Text

FOR EFD FOR COMMANDER NAVFAC

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

DESIGNED & ENGINEERED BY:

AutoCAD SHX Text

FACILITIES ENGINEERING

AutoCAD SHX Text

HAVELOCK, NC

AutoCAD SHX Text

AutoCAD SHX Text

CHERRY POINT

AutoCAD SHX Text

NAH

AutoCAD SHX Text

JRM

AutoCAD SHX Text 7232046

AutoCAD SHX Text

LPF

AutoCAD SHX Text

JRM

AutoCAD SHX Text

LTP

AutoCAD SHX Text

LPF

AutoCAD SHX Text P-1

AutoCAD SHX Text P-2

AutoCAD SHX Text P-3

AutoCAD SHX Text P-4

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 8/31/2026

AutoCAD SHX Text

CORRECTED SCHEDULE AND ADDED SCHEDULE

JRM