Replace Fire Sprinkler Dry Piping, B-232
Solicitation number
N400857230124
Issued by

About this file

This is an Amendment (0003) to a federal contract (7230124) for replacing fire sprinkler dry piping in Building 232 at Marine Corps Air Station Cherry Point, North Carolina. The amendment addresses multiple Request for Information (RFI) responses related to project implementation, including attic access, ceiling and insulation removal, furniture protection, building occupancy during construction, and potential louver modifications. Key details include:

The proposal due date remains unchanged at 05 January 2026 at 12:00 PM local time. A revised NAVFAC drawing (12912790) for Mechanical Abbreviation & Legend was issued on 12/23/25. The responses clarify that work can be performed using a catwalk through the suspended ceiling, existing ceiling tiles and insulation should be replaced if damaged, and removal/reinstallation of gable end louvers is acceptable. The contracting activity is CG MCAS Cherry Point Facilities, ROICC, located in Cherry Point, NC.

View the file

Other files

File Type Posted
7230124 AMENDMENT 0003.pdf PDF
7230124 AMENDMENT 0002.pdf PDF
7230124 AMENDMENT 0001.pdf PDF
7230124 RFP.pdf PDF
7230124 SpecsAsOne.pdf PDF
7230124 DrawingsAsOne.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 12/30/2025 7230124

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point

FACILITIES, ROICC

B-87, 748 Roosevelt Blvd.

PSC BOX 8006

CHERRY POINT, NC 28533

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION N400857230124

9B. DATED (SEE ITEM 11)

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

7230124 Replace Fire Sprinkler B232, Marine Corps Air Station Cherry Point, NC

The proposal due date of 05 January 2026 at 12:00 PM local time REMAINS unchanged.

See Attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

Amendment 0003 7230124 Replace Fire Sprinklers B232

RFI Responses:

1. There isn’t an attic access as shown on the drawings. It appears that all of the sheetrock that separated the attic from the living space has been previously removed and a acoustical ceiling has been installed with insulation laying on top of it. The acoustical ceiling and insulation will have to be removed for the sprinkler system to be replaced. This isn’t shown on the scope of work in the contract documents. Please advise.

Response:

Reference Revised NAVFAC Drawing 12912790. Catwalk is accessable through suspended ceiling.

Work can be performed on catwalk. Reference Revised NAVFAC Drawing 12912790 GENERAL NOTE

1. Submit Proposals in accordance with RFP, Specs, Drawings and all amendments.

2. Is the ceiling and insulation to be replaced or the existing reinstalled?

Existing ceiling tile and insulation to be replaced if damaged during construction. Reference Revised NAVFAC Drawing 12912790 GENERAL NOTE 1. Submit Proposals in accordance with RFP, Specs, Drawings and all amendments.

3. With the ceiling being removed, all existing furniture will have to be removed and or moved and protected. The existing furniture has not been addressed in the contract documents. Please review and advise.

Response:

Existing ceiling tile and insulation to be replaced if damaged during construction. Reference Revised NAVFAC Drawing 12912790 GENERAL NOTE 1. Submit Proposals in accordance with RFP, Specs, Drawings and all amendments.

4. The building is to remain in operation while the contract is being performed. With the work having to be completed through the ceilings (3.5’ from truss to peak and no working platform) we don’t think the building can remain occupied. In addition, once the sprinkler system is removed, wouldn’t this become a life safety issue if the building were to remain occupied?

Response:

Reference Revised NAVFAC Drawing 12912790. Catwalk is accessible through suspended ceiling.

Work can be performed on catwalk. Reference Revised NAVFAC Drawing 12912790 GENERAL NOTE

1. Submit Proposals in accordance with RFP, Specs, Drawings and all amendments.

5. It appears that the louvers at the gable ends of the building will have to be removed and reinstalled to get the new piping into the attic. See the attached picture. Is this acceptable?

Amendment 0003 7230124 Replace Fire Sprinklers B232

This is acceptable. Submit Proposals in accordance with RFP, Specs, Drawings and all amendments.

Subj: AMENDMENT TO WO 7230124, REPLACE FIRE SPRINKLER DRY PIPING, BUILDING

232, MCAS CHERRY POINT NC

CONTINUATION SHEET

DOCUMENT 00 01 15

1.2 CONTRACT DRAWINGS

The following drawings are revised as of 12/23/25:

NAVFAC DWG NO. TITLE

12912790 MECHANICAL ABBREVIATION & LEGEND – BLDG. 232

These drawings accompany this Amendment.

DESIGN

FINAL

CHERRY POINT, NC 28533
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL