MARINE CORP AIR STATION
CHERRY POINT, NORTH CAROLINA 28533-0006
WORK REQUEST #6749538
MAINTENANCE ACTION PLAN BUILDIING 4389
MARINE CORPS AIR STATION CHERRY POINT
STATEMENT OF WORK:
1. GENERAL REQUIREMENTS
To repair by replacement of eleven Building 4389 existing, single, and double, full glass and aluminum, store front type, exterior doors, and hardware. The replacement of approximately twenty-four year old doors is part of the continuing Maintenance Action Plan in an effort to keep the building safe, secure, aesthetically pleasing, and in good repair. The replaced Building 4389 exterior doors are located at the first deck at room or passageway, including the following:
1. 1000
2. 1008 (double)
3. 1042
4. 1064
5. 1081
6. 1420
7. 1398
8. 1329
9. 1245
10. 1208
11. 1141(double)
2. WORK INCLUDES
Providing all labor, supervision, tools, equipment, materials, and transportation needed to replace doors, as identified on the attached drawing. Work includes all associated hardware and incidental related work. All work shall be in accordance with the attached project drawing and specifications.
3. LOCATION
All work will be performed aboard the Marine Corps Air Station, Cherry Point, North Carolina.
Specific area of work is located at the Naval Health Clinic Cherry Point, Building 4389.
4. ATTACHMENTS
4.1.1. SPECIFICATION SECTIONS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
• 00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
• 01 11 00 SUMMARY OF WORK
• 01 14 00 WORK RESTRICTIONS
• 01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
• 01 30 00 ADMINISTRATIVE REQUIREMENTS
• 01 33 00 SUBMITTAL PROCEDURES
• 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
• 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
• 01 45 00.00 20 QUALITY CONTROL
• 01 50 00 TEMPORARY CONSTRUCTION
• 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
• 01 78 00 CLOSEOUT SUBMITTALS
• 01 78 23 OPERATION AND MAINTENANCE DATA
• 01 90 00 SCOPE OF WORK
DIVISION 08 - OPENINGS
• 08 11 16 ALUMINUM DOORS AND FRAMES
• 08 71 00 DOOR HARDWARE
• 08 81 00 GLAZING
4.1.2. NAVFAC DRAWING 12767021 - 12767024
5. SPECIFIC REQUIREMENTS
Coordinate through the Contracting Officer’s Designated Representative to have all necessary electrical lines locked out and tagged out as necessary for the completion of this work. The contractor is ultimately responsible for the health and safety of their employees. They shall also recognize the other inherent hazards and provide their employees with the appropriate safety equipment for each job. All North Carolina Building Codes, International Building Codes, Fire Codes, Statutes, NEC, OSHA Safety Codes, and the U.S. Army Corps of Engineer’s Safety and Health Requirements Manual, EM 385-1-1 shall be strictly enforced. An accident prevention plan in accordance with the EM 385-1-1 is required.
5.1.1. Provide and erect all required safety barriers needed to keep unauthorized personnel out of the work area.
5.1.2. Completely demolish existing doors as identified on sketch. Dispose of construction debris off station. Install new doors and all associated hardware. New glazing shall be 9/16” thermal impact resistant safety insulated glazing with a blast film. All door closers shall be mounted on the interior side of the doors. Installation shall be in accordance with manufacturer’s instructions. Provide all hardware identified in schedule. All hardware shall be designed for high traffic areas and match aluminum frame finish. Each door will need to be measured on site.
5.1.3. Contractor shall ensure all materials are approved by the Government prior to purchase and on site prior to starting demolition of existing equipment. The intent of this solicitation is to ensure full and open competition. The contractor shall request prior approval for alternate products other than what is specified. Alternate products must match the required performance specifications described above.
5.1.4. Unless otherwise indicated in project specifications, all material shall have a one (1) year parts and labor warranty provided to the Contracting Officers Designated Representative.
6. PLANNED OUTAGES AND SERVICE DISRUPTIONS
6.1.1. Description
Planned outages and service disruptions are requested by the contractor for approval to the contracting officer when necessary to facilitate and/or accomplish contract work. Affected services include:
• Utilities (steam, water, waste water, and electrical service)
• Communications (telephone, network, industrial control systems, and fire/security alarm systems)
• Fire protection equipment
• Infrastructure and road closures.
Disruption of these services cannot be allowed without written approval of the government.
6.1.2. Requirement
The contractor is required to:
• Request the outage in writing
• Demonstrate sufficient contingency preparedness in the event that service cannot be restored due to a failure in accomplishment of contract work.
7. TERMS OF THE CONTRACT
PRIOR TO BID, THE CONTRACTOR IS RESPONSIBLE for an on-site visit to inspect the work area and fully understand the scope of work. All work shall be performed during the hours of 07:30- 16:00, Monday through Friday. Any work performed outside of these periods must be pre-approved by the Contracting Officer. Project shall be completed within 60 days following contract award.
8. JOB EXECUTION
The contractor shall perform all work and incorporate the intent of this project as outlined in this scope of work. The work practice and installation shall conform to all industry standards and applications as they apply to this project, including, but not limited to:
• UFC 1-200-01, June 2016, Including Change 1, Feb 2018
• UFC 4-00-01, 12 Dec 2018
• North Carolina Building Codes and Statutes
• International Building Code (IBC), 2018
• International Electric Code (IEC)
• National Electrical Safety Code (NESC), 2017
• National Electric Code, National Fire Protection Association (NFPA) 70, 2017
• National Fire Alarm and Signaling Code, NFPA 72, 2019
• Life Safety Code, NFPA 101, 2018
• Architectural Barriers Act (ABA) Accessibility Requirements
• OSHA Safety Standards
All equipment and debris generated from this project becomes the property of the contractor and it must be removed from the jobsite and MCAS Cherry Point.
| 1. GENERAL REQUIREMENTS |
| 2. WORK INCLUDES |
| 3. LOCATION |
| 4. ATTACHMENTS |
| 5. SPECIFIC REQUIREMENTS |
| 6. Planned Outages and Service Disruptions |
| 7. TERMS OF THE CONTRACT |
| 8. JOB EXECUTION |
File details come from the government source that posted it. Updated .