SAS4408 Pedestrian Bridge Replacement Specifications
This document is a comprehensive specification and design plan for the replacement of a 198-foot pedestrian bridge located at SAS4408 on Dougless Road at New River Air Station, North Carolina. The contractor shall provide all materials, labor, equipment, and supervision required to demolish the existing damaged bridge and construct a new 220-foot pedestrian bridge with new abutment placements. The new bridge will be 11 feet wide by 4 feet of concrete hand rails, constructed of pressure-treated wood components including 7x16 glulam girders, 4x18 and 6x18 glulam joists spaced at 16 inches on center, 6x6 pressure-treated posts at 4-foot intervals, and 2x6 pressure-treated rails. The structure shall be supported by 12-inch timber piles with 14-foot embedment minimum, utilizing 3/4-inch galvanized through bolts and high-strength connections per RCSC specifications.
Material and design requirements include reinforced concrete abutments with 3000 PSI compressive strength per NCDOT Class A specifications, ASTM A615 Grade 60 reinforcing steel, southern yellow pine lumber No. 1 dense or higher with hot-dipped galvanized fasteners, and all structural steel of domestic origin conforming to ASTM A36 HDG standards. Design loads are 85 PSF live load, 20 PSF dead load, 15 PSF snow load, with 130 MPH wind speed and L/480 deflection limits per AASHTO criteria. The contractor must provide field verification of measurements, a geotechnical report by a licensed North Carolina engineer, and submit shop drawings, installation drawings, product specifications, and maintenance data prior to construction. The project includes jogging trail repair at each bridge end (approximately 200 square feet), installation of four "No Motor Vehicles" signs, and site security with debris control throughout the work areas.
View the file
Other files
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKESIDE POND
DOUGLASS RD
WHITE ST
MCAVOY ST
C H
U R
C H
S T
GRIER ST
C
AN
AL
S
T
E ST
SC
H
M
ID
T
ST
B ST
BAN
C
R O
FT ST
CAMPBELL ST
D
EM
AR
C
O
ST
H
AW
KI
N
S
BL
VD
JONES ST
TIM
ER
M
AN
ST
EP
PE
R
SO
N S
T
COMPTON ST
NINTH ST
DAVIS ST
LANGTRY ST
BORDELON ST
M O
N
TE
IT
H
S T
AG
ER
HO
LM
S T
ELEVENTH ST
BA
XT
ER
S
T
HARDIN ST
TIMMERMAN ST
TENTH ST
R O
BE
R
T L
W
IL
SO
N
B
LV
D
NEWELL ST
CRAWFORD ST
C
ST
C
AN
AL
S
T
F
ST
D
ST
MCAS TRAIL
G R
EEN
W
AY TR
AIL
WALKING TRAIL
MAT 6
MAT 5
MAT 7
MAT 4
ECHO
FUEL PITS
AS4203
AS4192
AS1001
AS206
AS86
SAS713
SAS4350
SG915
AS3808
AS4114
SAS4596
UNUM5
SAS4311
AS4125
AS4041
SAS4307
AS90
SAS4194
AS994
AS3905
SAS528
AS517
SAS120
AS4013F
AS97
AS499
SAS148
SAS140
AS4147A
AS4100
SAS195
SAS592
AS522
SAS4161
AS5040
SAS491
AS186
ASP714
AS143
UNUM7
SAS545
AS553
AS119
AS4128
SAS4160
STC953
AS3905
AS515
AS4111
AS518
AS41
AS4106
AS4085
AS541
AS4109
TC1500
AS4400
AS265
AS4055
AS255
AS510
G930
AS4020
AS4025
AS100
AS4100
AS4013
AS4040
AS4206
AS1000
G920
AS4200
AS4015
AS4171
AS4004
AS4110
AS4211
AS3900
AS4212
AS130AS4000
AS4208
AS4207
AS4158
AS4192
AS4035
AS120
AS4007
AS4006
AS516
AS85
AS90
B12
AS214
AS118
AS124
G801
AS240
AS4122
G800
TC809
AS186
TC829
TC805
TC838
TC836
TC806
AS111
TC837
AS1010
TC808
TC807
TC819
AS5040
TC817
AS4052
AS4141
TC839
TC1027
TC1006
TC1142
TC1026
TC1019
TC1143
TC1005
TC1003
TC1161
TC1162
TC1069
TC1004
TC1160
TC1068
TC1065
TC1067
AS4002
SAS4045
TC1066
AS187
AS4026
TC1064
AS4042
AS112
AS4039
AS4514
SAS4195
AS4502
AS4506
AS116
SAS180
AS4525
AS170
AS182
SAS4306
AS4568
AS4503
AS4517
AS4507
AS4537
AS4559
AS160
AS4008
AS4310
AS4126
AS148
AS4165
AS4230
SAS4140
SAS113
AS1169
AS4138
AS4061
AS257
AS1082
AS1177
AS1009
AS4311
AS1109
AS1105
AS1172
AS1108
AS4518
AS4516
AS1147
AS1106
AS4562
AS4534
AS4526
AS4522
AS4552
AS1194
AS1158
AS1126
AS1156
AS4541
AS4557
AS1229
AS1060
AS1175
AS1180
AS1112
AS1128
AS1192
AS1152
AS1113
AS1186
AS1011
AS1111
AS1162
AS4508
AS1120
AS1302
AS1149
AS1033
AS4582
AS4574
AS4579
AS4505
AS4566
AS4584
AS4501
AS4521
AS4567
AS4515
AS4533
AS1137
AS1110
AS4523
AS1124
AS1233
AS4500
AS4512
AS1065
AS1165
AS1114
AS1107
AS1144
AS1168
AS1125
AS1163
AS1098
AS1117
AS1317
AS1326
AS1142
AS1178
AS1140
AS4504
AS4510
AS1103 AS1320
AS1249
AS1239
AS1100
AS1154
AS1173
AS1127
AS1101
AS1190
AS1176
AS1251
AS1079
AS1227
AS1243
AS1069
AS1024
AS4527
AS1333
AS1089
AS1311
AS1312
AS1184
AS1157
AS1029
AS1160
AS1115
AS1058
AS1027
AS1328
AS1150
AS1083
AS1018
AS1075
AS1122
AS1119
AS1062
AS1091
AS1104
AS1132
AS1174
AS1182
AS1057
AS1167
AS1170
AS1016
AS1148
AS1030
AS1073
AS1134
AS1181
AS1203
AS1059
AS1022
AS1084
AS1071
AS1231
AS1090
AS1043
AS1146
AS1093
AS1035
AS1088
AS1074
AS1188
AS1086
AS1081
AS1094
AS1063
AS1141
AS1213
AS1116
AS1139
AS1032
AS1197
AS1123
AS1097
AS1099
AS1019
AS1133
AS4511
AS1306
AS1205
AS1179
AS1135
AS1159
AS1211
AS1095
AS1077
AS1318
AS1138 AS1241
AS1307
AS1076
AS1061
AS1020
AS1096
AS1314
AS4585
AS4587
AS4535
AS4513
AS4531
AS4519
AS4578
AS4572
AS4563
AS4529
AS4577
AS4565
AS4570
AS4569
AS4573
AS4509
AS4564
AS4588
AS4581
AS4586
AS4571
AS4575
AS4576
AS4583
AS4580
AS1315
AS1031
AS1041
AS1304
AS1118
AS1055
AS1054
AS1130
AS1067
AS1012
AS4520
AS4524
AS4561
AS4544
AS4532
AS4546
AS4551
AS4555
AS4549
AS4530
AS4558
AS4550
AS4536
AS4542
AS4545
AS4528
AS4538
AS4539
AS4556
AS4553
AS4554
AS4540
AS4548
AS4547
AS4560
AS4543
AS1309
AS1070
AS1161
AS1195
AS1153
AS1025
AS1028
AS1072
AS1092
AS1048
AS1014
AS1201
AS1056
AS1039
AS1199
AS1310
AS1151
AS1053
AS224
AS568
AS1080
AS1102
AS1183
AS1136
SAS4173
AS1026
AS1045
AS1171
SAS179
AS1049
AS1078
AS1051
AS1047
AS1121
AS4090
AS499
AS1155
AS3906
AS1052
AS4113
STC872
AS1050
AS236A
TC813
SAS4037
SAS173
AS4177
AS4184
TC1061
TC1062TC1060
TC1063
AS125
SAS178
AS1316
AS1013
PVAS4109
AS1037
SAS4032
SAS4017
SAS4042
AS1034
AS1068
SAS4221
AS1308
AS205
AS222
AS211
AS4038
AS208
AS236
AS4120
AS4078
AS4081
AS502
AS4146
AS4030
AS4147
AS122
AS545
AS4135
AS207
AS114
AS480
TC942
AS4157
AS213
AS4188
AS215
AS212
AS216
TC864
AS217
AS251
AS4060
AS4044
TC826
AS4151
AS4159
AS4145
AS576
AS4350
AS4088
AS4087
AS4148
AS3980
STC911
AS5000
CONT24
AS103
AS498
SAS145
SAS4131
AS4187
SAS4232
TC1502
SAS4172
AS4500
AS1100
AS1000
AS1300
CAMPBELL ST
W H
IT
E
ST
DOUGLESS ROAD
WALKING TRAIL
ASP714
AS4400
DOUGLESS ROAD
NEW RIVER AIR STATION, N.C.
LOCATION MAP AREA MAP
SAS4408 PED
BRIDGE REPLACEMENTLOCATION
MAP
SAS4408
PED BRIDGE
AREA MAP
VICINITY MAP
DRAWING INDEX
AutoCAD SHX Text
AS4225 HAZ FLAM STHSE
AutoCAD SHX Text
STC867 HAZ WASTE STOR
AutoCAD SHX Text
AS4227 HAZARDOUS WASTE STORAGE AREA
AutoCAD SHX Text
SAS4196 HAZMAT STORAGE VIC AS4195
AutoCAD SHX Text Richlands
AutoCAD SHX Text
US 17
AutoCAD SHX Text Beulaville
AutoCAD SHX Text Burgaw
AutoCAD SHX Text Words Corner
AutoCAD SHX Text Bolton
AutoCAD SHX Text
US 7
AutoCAD SHX Text
AutoCAD SHX Text 4 &
AutoCAD SHX Text Acme
AutoCAD SHX Text Delco
AutoCAD SHX Text Leland
AutoCAD SHX Text Warsaw
AutoCAD SHX Text Magnolia
AutoCAD SHX Text Rosehill
AutoCAD SHX Text
US 117
AutoCAD SHX Text
US 421
AutoCAD SHX Text Wallace
AutoCAD SHX Text %%uCAMP LEJUENE
AutoCAD SHX Text Swansboro
AutoCAD SHX Text Hampstead
AutoCAD SHX Text Wilmington
AutoCAD SHX Text Scott Hill
AutoCAD SHX Text
US 17
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text Holly Ridge
AutoCAD SHX Text
NEW RIVER
AutoCAD SHX Text Folkstone
AutoCAD SHX Text Dixon
AutoCAD SHX Text Jacksonville
AutoCAD SHX Text Verona
AutoCAD SHX Text
AutoCAD SHX Text
GRAPHIC SCALE IN MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Morehead City
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text Pink
AutoCAD SHX Text Hill
AutoCAD SHX Text Mt. Olive
AutoCAD SHX Text Seven
AutoCAD SHX Text Springs
AutoCAD SHX Text Goldsboro
AutoCAD SHX Text
US 70
AutoCAD SHX Text New Bern
AutoCAD SHX Text Havelock
AutoCAD SHX Text
NEUSE
AutoCAD SHX Text Tuscarora
AutoCAD SHX Text Trenton
AutoCAD SHX Text Comfort
AutoCAD SHX Text Kinston
AutoCAD SHX Text Dover
AutoCAD SHX Text
%%UOAK GROVE
AutoCAD SHX Text Pollacksville
AutoCAD SHX Text Maysville
AutoCAD SHX Text
%%UCHERRY POINT
AutoCAD SHX Text
US 70
AutoCAD SHX Text
RIVER
AutoCAD SHX Text Otway
AutoCAD SHX Text Beaufort
AutoCAD SHX Text
SAS4408 PED BRIDGE REPLACEMENT
AutoCAD SHX Text
PROJECT #26M085CN
AutoCAD SHX Text
MACC #26-0430
AutoCAD SHX Text
DWG: DANA WHITMORE
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG. AAS4408
AutoCAD SHX Text
TITLE PAGE
AutoCAD SHX Text T1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text
SHEET NAME
AutoCAD SHX Text T1
AutoCAD SHX Text
TITLE SHEET, AREA MAPS
AutoCAD SHX Text A1
AutoCAD SHX Text
NOTES
AutoCAD SHX Text A2
AutoCAD SHX Text
SPECIFICATION I
AutoCAD SHX Text A3
AutoCAD SHX Text
SPECIFICATION II
AutoCAD SHX Text A4
AutoCAD SHX Text
ENLARGED SITE PLAN
AutoCAD SHX Text A5
AutoCAD SHX Text
ELEVATION SITE PLAN
AutoCAD SHX Text A6
AutoCAD SHX Text
BRIDGE PLAN
AutoCAD SHX Text A7
AutoCAD SHX Text
BRIDGE ABUTMENT
AutoCAD SHX Text A8
AutoCAD SHX Text
BRIDGE DETAIL
SAS4408 PED BRIDGE REPLACEMENT
AutoCAD SHX Text
PROJECT #26M085CN
AutoCAD SHX Text
MACC #26-0430
AutoCAD SHX Text
DWG: DANA WHITMORE
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG. AAS4408
AutoCAD SHX Text
NOTES
AutoCAD SHX Text A1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text SCOPE OF WORK: The contractor shall provide all material, labor, equipment, and : The contractor shall provide all material, labor, equipment, and supervision required to accomplish the following: General description - This scope of work is to be accomplished at SAS4408 located on - This scope of work is to be accomplished at SAS4408 located on This scope of work is to be accomplished at SAS4408 located on Dougless Rd. at New River Air Station, North Carolina. This project will consist of demo approximate 1584sf of existing pedestrian bridge, wooden head walls, 20sf of asphalt walking path. Contractor shall construct 1760sf of new pedestrian bridge, new 11' x 4' x 4' concrete head walls, new bike rails, post caps, all hardware, patch asphalt walking path per scope of work. DETAILED REQUIREMENTS AND SPECIFICATIONS: The contractor shall take his own : The contractor shall take his own field measurements in determining required materials and costs for the following. SPECIAL SCHEDULING AND ACCESS: Access and scheduling to the work area shall be Access and scheduling to the work area shall be arranged through Contracting Officer"s Representative for the OICC office and the tenant of the building. Point of Contact for access to building. NOTES: 1. The measurements and quantities furnished here are for reference only. The The measurements and quantities furnished here are for reference only. The contractor is responsible for actual field verification prior to bidding, ordering material and during every step of construction for existing surfaces, dimensions and conditions. 2. Repair, refinish all areas damaged or disturbed by new work to be provided Repair, refinish all areas damaged or disturbed by new work to be provided under this contract. 3. Contractor may ONLY use the Camp Lejeune Sanitary landfill for the disposal Contractor may ONLY use the Camp Lejeune Sanitary landfill for the disposal of asbestos containing materials, building products with tightly adhered lead containing paint, non-contaminated clean dirt and clean gravel. the hours of operations are 0730-1530 Monday- Thursday and 0730-1430 on Friday. delivery of acceptable materials (identified above) shall be by appointment only. Appointment made by phone at 1-910-457-5011 or 1-910-451-2946. 4. All other contractor generated material shall be weighed through the Base All other contractor generated material shall be weighed through the Base Landfill scales before being removed from the Base. Contractor utilizing the base scale will require Contracting Officers assisted per-registration with the Landfill manager. 5. The Contracting officer will register the contract via E-mail, with the base The Contracting officer will register the contract via E-mail, with the base landfill. All haul vehicles will maintain a secure vehicle placed as a condition to utilize the scale. E-mail the contractors information to the Landfill Clerk, include the name on the Prime contractor, contract number, job name / description, completion date and whether or not any above material will be delivered to the Landfill. 6. Prior to performing "HOT WORK" (welding, cutting, etc.) or operating other Prior to performing "HOT WORK" (welding, cutting, etc.) or operating other flame -producing spark producing devices, a written permit shall be requested from the Fire Division. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. The contractor will provide at least two (2) twenty (20) pound 4A:20 BC rated extinguishers for normal "HOT WORK". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "HOT WORK" done at this activity. The Fire watch shall be trained in accordance with NFPA 51B and remain on site for a minimum of sixty (60) minutes after work is completed. 7. Contractor is to be aware of all rules, regulation and codes required for Contractor is to be aware of all rules, regulation and codes required for successful completion of project.
SUBMITTALS: 1. Contractor shall make electronic copies of all submittals, include the approved Contractor shall make electronic copies of all submittals, include the approved transmittal sheets and provide two (2) CD/DVD's containing all submittals for project. The CD/DVD's shall be marked "Complete Submittal package - "SAS4408 PED BRIDGE REPLACEMENT" with Contract # as issued by Contracting Officer. 2. AFTER AWARD: The Contractor shall furnish the Contracting Officer, material, AFTER AWARD: The Contractor shall furnish the Contracting Officer, material, specifications for selection and approval prior to the ordering and installation of said materials. 3. The contractor is required to submit a schedule detailing when they and or The contractor is required to submit a schedule detailing when they and or any subcontractor will be working. The schedule must be approved by Government before beginning work. 4. The contractor shall submit to the Contracting Officer, the manufacture's The contractor shall submit to the Contracting Officer, the manufacture's product specifications, complete with technical products data for all of the material being used in this process. The product specification shall as a minimum, provide the technical details on the following items. 5. Submit: Submit: A. SHOP DRAWINGS. SHOP DRAWINGS. B. INSTALLATION DRAWINGS /shop drawings INSTALLATION DRAWINGS /shop drawings C. PRODUCT DATA PRODUCT DATA C.A. Manufactures technical data Sheet Manufactures technical data Sheet C.B. Material Safety Data Sheets (MADA) Material Safety Data Sheets (MADA) C.C. Maintenance Data Maintenance Data D. WARRANTY ( 10 year Commercial Limited Warranty) WARRANTY ( 10 year Commercial Limited Warranty) E. READ LINE DRAWINGS READ LINE DRAWINGS 6. Qualifications: Qualifications: 6.1. Fabricator Qualifications: Minimum of three years documented experience in m Fabricator Qualifications: Minimum of three years documented experience in m similar in scope and complexity to this Project. Current certified by manufacturer as acceptable fabricator. 6.2. Installer Qualifications: minimum of three years documented installation Installer Qualifications: minimum of three years documented installation experience for project similar in scope and complexity to this project and currently certified by manufacturer as an acceptable installer.
CONCRETE: ALL REINFORCED CONCRETE TO HAVE A
COMPRESSIVE STRENGTH (f'c) OF 3000 PSI, IN ACCORDANCE
WITH NCDOT CLASS A MIX SPECIFICATIONS.
EXPOSED CONCRETE SHALL BE AIR-ENTRAINED.
REINFORCING STEEL: ASTM A615 GRADE 60.
WOOD: ALL SAWN WOOD TO BE SOUTHERN YELLOW PINE
(SYP) NO. 1 DENSE OR HIGHER.
ALL FASTENERS AND HANGERS TO BE HOT DIPPED
GALVINIZED (HDG) (AT A MINIMUM)
PRESERVATIVE PRESSURE TREATMENT TO BE IN
ACCORDANCE WITH AWPA STANDARD M4-06 & U1-07.
GLULAM SPECS: Fb=2400 PSI Fv=270 PSI E=1,800,000 PSI.
DIMENSIONS SHOWN ARE NOMINAL ACTUAL DIMENSIONS
ARE AS FOLLOWS:
4X18 - 318 X 1778 6X18 - 518 X 1778 7X16 - 63
4 X 1612
ECONOMIC FASTENER, HANGER OR STRUCTURAL MEMBER
SUBSTITUTES TO BE APPROVED BY PWO.
STRUCTURAL STEEL: ALL STRUCTURAL STEEL SHALL BE
DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH
THE LATEST EDITION OF THE AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (A.I.S.C.) "SPECIFICATION FOR STRUCTURAL
STEEL BUILDINGS - ALLOWABLE STRESS DESIGN AND
PLASTIC DESIGN", AND THE AISC CODE OF STANDARD
PRACTICE.
STRUCTURAL STEEL, TO BE OF DOMESTIC ORIGIN, AND
CONFORM TO:
PLATES, ANGLES, & CHANNELS: ASTM A36 HDG
HSS ROUND PIPE: ASTM A501 HDG
ANCHOR BOLTS: ASTM A307 HDG
ALL SHOP AND FIELD CONNECTIONS SHALL BE MADE WITH
HIGH STRENGTH BOLTS, (OR WELDED EQUIVALENT) UNLESS
OTHERWISE NOTED. SELECT CONNECTIONS TO SUPPORT
[50%] OF THE TOTAL UNIFORM LOAD CAPACITY IN BENDING
FOR EACH GIVEN BEAM AND SPAN. BOLTING TO BE IN
ACCORDANCE WITH RCSC SPECIFICATIONS.
GENERAL NOTES:
GENERAL: ALL NOTES ARE FOR SUPPLEMENTING THE
PLANS AND SPECIFICATIONS AND ARE IN NO WAY TO BE
CONSIDERED AS EXCLUDING ANY ITEM IN THEM.
CODE: DESIGN AND CONSTRUCTION TO BE IN ACCORD
WITH THE UNITED FACILITIES CRITERIA (UFC) AND THE
PARTICULAR CODES AS REFERENCED IN UFC.
DESIGN CRITERIA PER AASHTO:
LIVE LOAD: 85 PSF
DEAD LOAD: 20 PSF
SNOW LOAD: 15 PSF
WIND SPEED: 130 MPH
HORIZONTAL WIND LOAD: 35 PSF
DEFLECTION: L/480
FOUNDATION: EXCAVATION FOR AND BEARING MATERIAL
FOR FOUNDATIONS SHOULD BE SUPERVISED AND
APPROVED BY PWD PRIOR TO FOOTING INSTALLATION.
MATERIAL SATISFACTORY FOR CONTROLLED FILL AND
BACKFILL MATERIAL AROUND AND ABOVE FOOTINGS
SHALL INCLUDE CLEAN SOIL OR BANKRUN SAND AND
GRAVEL (GW, GC, SC, SM, ML & CL), BUT EXCLUDE
HIGHLY PLASTIC CLAYS (MH & CH) OR HIGH SHRINK
SWELL SOILS. THE FILL MATERIALS SHALL BE FREE
FROM TOPSOIL, ORGANIC CONTAMINATED SOIL AND
ROCK FRAGMENTS HAVING A MAJOR DIMENSION
GREATER THAN FOUR (4) INCHES, AND SHALL CONTAIN
NO ICE OR SNOW.
CONTRACTOR TO PROVIDE GEOTECHNICAL REPORT
PERFORMED BY LICENSED GEOTECHNICAL ENGINEER
REGISTERED IN THE STATE OF NORTH CAROLINA.
AutoCAD SHX Text
SAS4408 PED BRIDGE REPLACEMENT
AutoCAD SHX Text
PROJECT #26M085CN
AutoCAD SHX Text
MACC #26-0430
AutoCAD SHX Text
DWG: DANA WHITMORE
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG. AAS4408
AutoCAD SHX Text
SPECIFICATION
AutoCAD SHX Text A2
AutoCAD SHX Text
AutoCAD SHX Text
I
AutoCAD SHX Text
PROJECT #26M085CN
AutoCAD SHX Text
MACC #26-0430
AutoCAD SHX Text
DWG: DANA WHITMORE
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG. AAS4408
AutoCAD SHX Text
SPECIFICATION
AutoCAD SHX Text A3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
II
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
SITE OF ONE (1) DAMAGED 198 FOOT LONG PEDESTRIAN
AutoCAD SHX Text
BRIDGES, SAS4408. DEMOLISH AND DISPOSE OF EXISTING
AutoCAD SHX Text
BRIDGE AND ABUTMENTS OFF BASE.
AutoCAD SHX Text
NEW BRIDGES SHALL BE CONSTRUCTED AS SHOWN ON
AutoCAD SHX Text
SHEETS. NEW BRIDGE CONSTRUCTION WILL REQUIRE NEW
AutoCAD SHX Text
ABUTMENT PLACEMENTS TO ALLOW FOR A 220 FOOT
AutoCAD SHX Text
SPAN BRIDGE.
AutoCAD SHX Text
SITE SAS4408 REQUIRES JOGGING TRAIL REPAIR. REPAIR
AutoCAD SHX Text
AREA AT EACH END OF NEW BRIDGE APPROXIMATELY 200
AutoCAD SHX Text
SF. DEMOLISH AND DISPOSE OF EXISTING ASPHALT OFF
AutoCAD SHX Text
BASE. REPLACE JOGGING TRAIL AS SHOWN ON DETAIL
AutoCAD SHX Text
SHEET. NEW BULK HEAD AT EACH END OF BRIDGE
AutoCAD SHX Text
AND REESTABLISH RIP RAP ALONG DISTURBED SLOPES.
AutoCAD SHX Text
INSTALL "NO MOTOR VEHICLES" SIGNS ON EACH SIDE OF
AutoCAD SHX Text
EACH BRIDGE, TOTALING FOUR (4) SIGNS.
AutoCAD SHX Text
CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS,
AutoCAD SHX Text
EQUIPMENT, AND MATERIALS.
AutoCAD SHX Text
EXISTING UTILITIES SHALL BE LOCATED PRIOR TO WORK
AutoCAD SHX Text
AND SHALL NOT BE DISTURBED. CONTRACTOR IS
AutoCAD SHX Text
RESPONSIBLE TO REPAIR ANY DAMAGE TO EXISTING
AutoCAD SHX Text
UTILITIES. EXERCISE CAUTION WHILE EXCAVATING AROUND
AutoCAD SHX Text
UTILITIES.
AutoCAD SHX Text
WORK SITES SHALL BE SECURED TO PREVENT PUBLIC
AutoCAD SHX Text
FROM ENTERING WORK AREAS. WORK SITES SHALL BE
AutoCAD SHX Text
KEPT CLEAN AND FREE OF DEBRIS.
AutoCAD SHX Text
WOOD SCHEDULE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
PRESSURE TREATMENT
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
POST CAP
AutoCAD SHX Text 5.5"X5.5"
AutoCAD SHX Text
ALUMINUM PYRAMID
AutoCAD SHX Text
SHAPE: PYRAMID COLOR: BLACK
AutoCAD SHX Text
DECKING
AutoCAD SHX Text
3"X12" MILLED
AutoCAD SHX Text
(CCA-C) .60PCF PERM WOOD FOUNDATION
AutoCAD SHX Text
(3) 60D (3) AT EACH BEARING PRE DRILL DECK BOARDS
AutoCAD SHX Text
POST
AutoCAD SHX Text 6"X6" 6x6 TRAIL GUARD RAIL
AutoCAD SHX Text
(CA-B) .21PCF GROUND CONTACT
AutoCAD SHX Text
GALVANIZED 3/4" BOLT & WASHER
AutoCAD SHX Text
RAILS
AutoCAD SHX Text 2X6
AutoCAD SHX Text
(CA-B) .21PCF GROUND CONTACT
AutoCAD SHX Text
16D RING SHANK (3) AT EACH BEARING
AutoCAD SHX Text
BICYCLE RAIL
AutoCAD SHX Text 2"
AutoCAD SHX Text
GALVANIZED STEEL AFTER CONSTRUCTION
AutoCAD SHX Text
2"-0.5" W/4 BPB25412 SIMPSON
AutoCAD SHX Text
ALL FASTENERS SHALL BE HOT DIPPED GALVANIZED STEEL
AutoCAD SHX Text ALL LUMBER SHALL BE GRADE #1, OR BETTER, SOUTHERN YELLOW PINE BEFORE BEFORE PRESSURE TREATMENT.
AutoCAD SHX Text 1.
AutoCAD SHX Text 2.
AutoCAD SHX Text 3.
AutoCAD SHX Text 4.
AutoCAD SHX Text 5.
AutoCAD SHX Text 6.
7.
AutoCAD SHX Text
PROJECT #26M085CN
AutoCAD SHX Text
MACC #26-0430
AutoCAD SHX Text
DWG: DANA WHITMORE
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG. AAS4408
AutoCAD SHX Text
ENLARGED
AutoCAD SHX Text A4
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text 198'
AutoCAD SHX Text 220'
AutoCAD SHX Text
EXISTING SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text A4
AutoCAD SHX Text A4
AutoCAD SHX Text
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
AutoCAD SHX Text 1" = 50'
AutoCAD SHX Text
REPLACEMENT SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text A4
AutoCAD SHX Text A4
AutoCAD SHX Text
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
AutoCAD SHX Text 1" = 50'
AutoCAD SHX Text
FIELD VERIFY
FIELD VERIFY
DOUGLASS ROAD
AutoCAD SHX Text
HEADWALL INV=7.78'
AutoCAD SHX Text
8' WOOD BRIDGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OVERHEAD ELECTRIC LINES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RIPRAP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EOHW
AutoCAD SHX Text
UP ASL-6A
AutoCAD SHX Text
TOE
AutoCAD SHX Text
TOB
AutoCAD SHX Text
TOB
AutoCAD SHX Text
TOB
AutoCAD SHX Text
TOE
AutoCAD SHX Text
10"EW
AutoCAD SHX Text
10"EW
AutoCAD SHX Text
APPROXIMATE LOCATION OF EXISTING WATERLINE
AutoCAD SHX Text
SAS4408 PED BRIDGE REPLACEMENT
AutoCAD SHX Text
PROJECT #26M085CN
AutoCAD SHX Text
MACC #26-0430
AutoCAD SHX Text
DWG: DANA WHITMORE
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG. AAS4408
AutoCAD SHX Text
NEW ELEVATION
AutoCAD SHX Text A5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
NEW SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text A5
AutoCAD SHX Text A5
AutoCAD SHX Text
AutoCAD SHX Text 30'
AutoCAD SHX Text 60'
AutoCAD SHX Text 1" = 30'
AutoCAD SHX Text
POINT -4.17FT ELEVATION
4'-0"4'-0"
6 x 18 GLULAM OUTER BAND
6X6 POST
34"Ø GALVANIZED THRU BOLTS
2X12 PT BRACE
12"Ø PILE
7X16 GLULAM GIRDER30'-0" MAX
2X6 PT RAIL @ 3" OC
'-6
B
IC
Y C
L E H
A N
D R
A
IL
' E
M B
E D
M E N
T M
IN
'-6
P E D
H
A N
D R
A
IL
2X6 PT BRACE
RIP RAP
CREEK
BICYCLE RAIL
MIN. BEARING 3" TYP.
34"Ø GALVANIZED THRU BOLTS
8A
AutoCAD SHX Text
SAS4408 PED BRIDGE REPLACEMENT
AutoCAD SHX Text
PROJECT #26M085CN
AutoCAD SHX Text
MACC #26-0430
AutoCAD SHX Text
DWG: DANA WHITMORE
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG. AAS4408
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text A6
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
TYPICAL BRIDGE SECTION
AutoCAD SHX Text
AutoCAD SHX Text A6
AutoCAD SHX Text A6
AutoCAD SHX Text
AutoCAD SHX Text 10'
AutoCAD SHX Text 20'
AutoCAD SHX Text 1" = 10'
'-0
4'-0"
'-6
CONCRETE ABUTMENT
CENTERLINE BRIDGE
1'-6"
CONCRETE PAD OR
ASPHALT TRAIL
ten foot section on each side
11' CONCRETE FOOTING
STONE BASE
1'-6" DEEP X 12'-0" WIDE
'-8
M
IN
4'-0"
'-4
M
IN
1'-6" MIN. BEARING
RIP RAP
SIMPSON GLBT612- BEAM
SEAT OR EQUIV.
4X18 - 314" W 6X18 - 51
4" W
3"
3"
3"
3"
#5 @ 15" OC VERT &
HORIZONTAL CONT.
#5 VERTICAL
@ 15" OC
#5 HORIZONTAL
@ 15" OC
C
O V E R
T Y P
2" GAP
AutoCAD SHX Text
SAS4408 PED BRIDGE REPLACEMENT
AutoCAD SHX Text
PROJECT #26M085CN
AutoCAD SHX Text
MACC #26-0430
AutoCAD SHX Text
DWG: DANA WHITMORE
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG. AAS4408
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text A7
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
REINFORCING DETAIL
AutoCAD SHX Text
AutoCAD SHX Text A7
AutoCAD SHX Text A7
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text 5'
AutoCAD SHX Text
ABUTMENT DETAIL
AutoCAD SHX Text
AutoCAD SHX Text A7
AutoCAD SHX Text A7
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text 5'
AutoCAD SHX Text
ABUTMENT PLAN
AutoCAD SHX Text
AutoCAD SHX Text A7
AutoCAD SHX Text A7
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3/4" = 1'-0"
6'-0"
'-6
SOLID PT 2X12
BLOCKING BETWEEN
JOIST @ POST
LOCATIONS
4 X 18" GLULAM
@ 16" OC MAX
3X12 PT DECKING
(3) 34"Ø GALVANIZED
THRU BOLTS @ PILE
LOCATIONS
12"Ø TIMBER PILE 0.80 CCA
6X6 PT POST @ 4'-0" OC
2X6 PT RAILS
4" GALV.
THRU BOLTS
7'-4"
2X12 PT BRACE
EACH SIDE
MST20SS (2) PER
JOIST ENDS
' E
M B
E D
M E N
T T Y P
GRADE
4"
'-6
2"Ø GALV. STD PIPE
BICYCLE HANDRAIL
6 X 18" GLULAM
END JOIST
6 X 18"
GLULAM
END JOIST
4" PL. 5X0'-5" W/ (4)
SDS25412 GALV. SIMPSON
SCREWS OR EQUIV.
7 X 16" GLULAM
GIRDER
'-8
'-0
M
A X
'-0
M
A X
'-0
M
A X
34"Ø GALVANIZED THRU BOLTS
8'-0"POST CAP
METAL
6X6 PT POST
NEW 2X6 PT HORIZ.
RAILING
'-4
1 2
TOP OF EX. POST
SECTION POST/RAIL DETAIL
NEW METAL CAP 6X6
6X6 POST WITH CAP
6X6 POST WITH CAP
SIMPSON A33 GALV. SUPPORT ANGLES
6X6 PT POST
(4) SDS25412 GALV. SCREWS OR EQUIV.
TYPICAL RAIL/POST CONNECTION
POST CONNECTION DETAIL
PLAN VIEW
2X6 RAILS
2X6 HORIZ. RAILING
EVENLY SPACING
2" RAILING FROM
DECK
1-5/8" galvanized steel rail
5-1/2"" x 5-1/2" GALV. SUPPORT plate welded to pipe before galv.
mounted ever other post.
6X6 PT POST
(4) 14" x 2" lag bolts GALV. OR EQUIV.
TYPICAL RAIL/POST CONNECTION
1 58" galv. pipe 1 58" galv. pipe
1 58" galv. pipe mounting
AutoCAD SHX Text
COMPACTED SUBGRADE
AutoCAD SHX Text
BASE COURSE
AutoCAD SHX Text
1-1/2" SF9.5A MIX
AutoCAD SHX Text
4" AGGREGRATE
AutoCAD SHX Text
SAS4408 PED BRIDGE REPLACEMENT
AutoCAD SHX Text
PROJECT #26M085CN
AutoCAD SHX Text
MACC #26-0430
AutoCAD SHX Text
DWG: DANA WHITMORE
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG. AAS4408
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text A8
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
BRIDGE SECTION DETAIL
AutoCAD SHX Text
AutoCAD SHX Text A8
AutoCAD SHX Text A8
AutoCAD SHX Text
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text 1" = 20'
AutoCAD SHX Text
WALKING TRAIL
AutoCAD SHX Text
AutoCAD SHX Text A8
AutoCAD SHX Text A8
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text 5'
AutoCAD SHX Text
RAIL & POST DETAIL
AutoCAD SHX Text
AutoCAD SHX Text A8
AutoCAD SHX Text A8
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3/4" = 1'-0"
SAS4408 FOOTBRIDGE
REPLACEMENT
AREA OF NEW
FOOT BRIDGE
12”X 12” POST
SAS4408 FOOTBRIDGE
REPLACEMENT SAME
FOOTPRINT
HWY 17 SOUTH
DOUGLESS
ROAD
NEW RIVER AIR STATION
| SAS4408 PEDESTRIAN BRIDGE REPLACEMENT - SOW |
| Sheets and Views |
| SAS4408 FOOT BRIDGE-Title Page |
| SAS4408 FOOT BRIDGE-A1 |
| SAS4408 FOOT BRIDGE-SPECIFICATION 1 A2 |
| SAS4408 FOOT BRIDGE-SPECIFICATION 2 A3 |
| SAS4408 FOOT BRIDGE-EXISTING SITE PLAN A4 |
| SAS4408 FOOT BRIDGE-ELEVATION SITE PLAN A5 |
| SAS4408 FOOT BRIDGE-BRIDGE PLAN A6 |
| SAS4408 FOOT BRIDGE-BRIDGE ABUTMENT A7 |
| SAS4408 FOOT BRIDGE-BRIDGE DETAIL A8 |
| SAS4408 PROPOSED FOOTBRIDGE |
| Slide Number 1 |
| Slide Number 2 |
File details come from the government source that posted it. Updated .