Amend 0003 26-0438.pdf
PDF 901 KB Posted
- Attached to
- Building BB6 Roofing Repairs
- Solicitation number
- N4008526R9068
About this file
This is an Amendment of Solicitation/Modification of Contract (Amendment 0003) issued by NAVPAC Mid-Atlantic for a building roof repair project. The solicitation number is N40085-26-R-9068, effective August 12, 2026, with a project number of 26-0438. The amendment modifies the contract as set forth in the original solicitation and is administered by the Resident Officer in Charge of Construction located at 1107A Birch Street, Camp Lejeune, NC 28547-2521.
The amendment consists of Answers to Requests for Information addressing nine technical questions raised by prospective contractors regarding the BB6 roofing repairs project. Key clarifications include: (1) no recent roof inspection is available from the government; (2) after-hours work requires prior written approval; (3) contractors must comply with contaminated materials specifications including asbestos procedures; (4) all three supervisory duties (superintendent, QCM, and QC) may be performed by one qualified person; (5) separate QC Specialist oversight from the manufacturer is required; (6) dumpster painting is not required; (7) cold-applied roofing processes are not permitted on low-slope areas; (8) metal flashing at rake wall-to-valley transitions must follow roof manufacturer standard details; and (9) contractors must remove the existing gutter, downspout, and fascia and replace them to match the existing size and style rather than transitioning with a drip edge. All other terms and conditions remain unchanged.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-26-R-9068 Amendment 0003
CONTINUATION SHEET
QUESTION 1: Can the government supply a recent roof inspection?
ANSWER 1: Roof inspection is not available.
QUESTION 2: Is there anticipation that some work will need to be completed outside regular working hours?
ANSWER 2: If after-hours work becomes necessary, you must submit and obtain approval for a work request prior to commencing any work outside of regular hours.
QUESTION 3: Is the contractor going to be held to this specification? This is a roof project and this section deals with procedures for a contaminated site.
ANSWER 3: Yes, there could be contaminated or hazardous materials such as asbestos.
QUESTION 4: SOW states supervision can be a 3 hat. In the specs under 1.5.1.1 Duties it states the QCM may perform the superintendent duties. Please clarify.
ANSWER 4: All three duties can be performed by one person if qualified.
QUESTION 5: Please confirm if the separate QC Specialist listed are required for this project.
ANSWER 5: Yes, this will be the manufacturer QC.
QUESTION 6: It states that dumpsters be painted standard installation color. Please confirm if this is a requirement.
ANSWER 6: No, dumpsters do not have to be painted standard installation color.
QUESTION 7: Can we use cold process on the low slope because there is a wood deck below?
ANSWER 7: Cold applied process will not be allowed.
N40085-26-R-9068 Amendment 0003
QUESTION 8: Can we clarify the metal detail at the rake wall to valley transition on the standing seam metal roof?
ANSWER 8: Provide flashing as per roof manufacturer standard detail/recommendations.
QUESTION 9: Can we use a drip edge that transitions into the existing gutter? or are we require to remove the gutter and replace the facia?
ANSWER 9: Remove gutter, downspout and fascia. Replace to match existing size/style.