Amend 0002.pdf

PDF 112 KB Posted

Attached to
Multiple Building Fire Exhaust Systems Repairs
Solicitation number
N4008526R9059
Issued by

About this file

This is Amendment 0002 to a federal solicitation for construction services issued by NAVFAC Mid-Atlantic on July 22, 2026. The amendment responds to three requests for information (RFI) submitted by offerors regarding the project N40085-26-R-9059, titled "Multiple Building Fire Exhaust Systems Repairs" at Camp Lejeune, NC.

The amendment clarifies three key technical and operational issues: (1) Exhaust Fan VF2 support installation shall follow the detail shown on drawing M-7 rather than mirroring the existing VF1 configuration; (2) a Variable Frequency Drive (VFD) can be relocated to the opposite wall adjacent to the building electrical panel to accommodate existing materials and hoses in building G700A; and (3) contractors should coordinate with the Building Fire Chief regarding vehicle access during installation, as fire trucks and ambulances can be moved to accommodate work. The proposal submission deadline remains unchanged, and offerors must acknowledge receipt of this amendment with their proposals to avoid rejection. All other terms and conditions of the original solicitation dated July 6, 2026, remain in effect.

View the file

Other files

File Type Posted
Amend 0001.pdf PDF
Pricing Sheet 240046.pdf PDF
RFP 240046.pdf PDF
N4008524B0046 Specs.pdf PDF
N4008524B0046 Dwgs Signed.pdf PDF
24-0046 SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

AMENDMENT NO. 0002 07/22/26 24-0046

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-26-R-9059

07/06/26

24-0046, Multiple Building Fire Exhaust Systems Repairs Amendment 0002, Respond to RFI.

The time and date for receipt of proposals remains unchanged.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

See Continuation Page(s)

N40085-26-R-9059 Amendment 0002

CONTINUATION SHEET

1. QUESTION: During the walk through. We have been told to support the Exhaust Fan VF2 like the existing exhaust fan VF1. However, on M-7 the supporting exhaust installation details is not the same. Please confirm which way to support VF2.

ANSWER: Please follow detail on M-7.

2. QUESTION: There are some materials hoses boxes at the wall where the EF needs to be installed in G700A. Are these supposed to be moved by the government or by the contractor?

ANSWER: VFD can be moved on the opposite wall adjacent to the building electrical panel.

3. QUESTION: Will the Fire truck and ambulance truck will be out of the building during the installation, or do we have to work around them

ANSWER: Please coordinate with the Building Fire Chief. They should have no problem working with the contractor moving vehicles.

4. All other terms and conditions remain unchanged.

Draft Amend 00011