Amend 0004.pdf

PDF 1 MB Posted

Attached to
Geiger Quad G530 & G550 DOAS Replacement
Solicitation number
N4008526R9031
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued as Amendment 0004 to contract N40085-26-R-9031. The amendment was issued by NAVPAC Mid-Atlantic (Resident Officer in Charge of Construction) on May 26, 2026, with an effective date of April 29, 2026. The contract pertains to Project No. 25-0080, Geiger Quad G530 & G550 DOAS Replacement.

The amendment provides clarifications through a Questions and Answers format addressing contractor inquiries regarding specific contract requirements. In response to the first question, the contracting officer confirms that the Dedicated Outside Air Unit Schedule on page M501, note P, intentionally includes a five-part warranty covering parts, labor, and refrigerant—an addition not required on the previous Geiger Quad project. Regarding the second question concerning Plan sheet M101 keynote 2, the contracting officer clarifies that all exterior ductwork must be demolished and replaced with new duct, rather than disconnected and reconnected as performed on the prior Geiger project, because the new units will not match the existing ductwork layout. The time and date for receipt of proposals remain unchanged, and all other terms and conditions of the contract are unaffected by this amendment. Contractors must acknowledge receipt of this amendment when submitting proposals; failure to do so may result in rejection of the proposal.

View the file

Other files

File Type Posted
Amend 0005.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
N4008525B0079 Dwgs.pdf PDF
RFP 250080.pdf PDF
25-0079 SOW.pdf PDF
N4008525B0079 Specs.pdf PDF
N4008525B0080 Dwgs.pdf PDF
25-0080 SOW.pdf PDF
N4008525B0080 Specs.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-26-R-9031 Amendment 0004

CONTINUATION SHEET

1. QUESTION: The Dedicated Outside Air Unit Schedule on page M501, note P calls out a 5 parts, labor and refrigerant warranty. The last Geiger Quad project did not require the refrigerant warranty. Was it the intention to add the refrigerant warranty to this project?

ANSWER: Yes, it was the intention to add the refrigerant warranty to this project.

2. QUESTION: Plan sheet M101 keynote 2, says to demolish all exterior duct and install new duct. The duct looks to be in good shape. Is the intent of this contract to replace all of the duct or to disconnect and reconnect as we did on the last Geiger project?

ANSWER: The intent is to replace all exterior ductwork since the new units will not match the existing ductwork layout.

3. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .