This document is a Standard Form 30 Amendment of Solicitation for a construction project at Camp Lejeune, North Carolina, with solicitation number N40085-26-R-9008. The amendment (Amendment 0001) provides clarifications for two specific questions related to the project:

  1. Painting Scope: For the laundry room, only new partitions enclosing dryer venting and washer piping will be painted to match existing beige/light taupe walls. The existing ceiling, which is exposed structure and currently white, will have minimal painting only for new piping or conduit touchups. 2. Air Distribution Schedule: A typographical error was corrected regarding an SG-1 grille on drawing M-402, with instructions to use the specifications originally listed for TG-1 on drawing M-601. The amendment maintains the original solicitation's receipt date and indicates that all other terms and conditions remain unchanged.

View the file

Other files

File Type Posted
Amend 0003.pdf PDF
Amend 0002.pdf PDF
FC306 Laundry Room.pdf PDF
N4008524B0022 Specs.pdf PDF
N4008524B0022 Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N40085-26-R-9008 Amendment 0001

CONTINUATION SHEET

1. QUESTION: Do all the walls and ceilings get painted in the laundry room?

ANSWER: No, see A-101. There is no existing ceiling in the room. It is exposed to structure and structure currently painted white. We provided a ceiling paint spec for any new piping or conduit that runs up against the ceiling (P-2) or possibly for touchups. The 2 new partitions which enclose the dryer venting and the washer piping are to be painted to match the existing beige/light taupe walls (P-1).

2. QUESTION: Looking at drawing M-402, it shows an SG-1 grille, this grille is not listed in the air distribution schedule on drawing M-601. In order to price this grille, we will need to know what to provide. May this grille be added to the air distribution schedule so that we may know what to provide?

ANSWER: There is a typo in the air device schedule where TG-1 is supposed to say SG-1. For SG-1, provide what is listed for TG-1 on M-601.

3. All other terms and conditions remain unchanged.

Amendment SF30
Untitled
Untitled

Continuation SF30

IDCode:
Page: 1
Pages: 2
AmendNo: AMENDMENT NO. 0001
EffDate: 1/14/26
ReqNo:
ProjNo: 24-0022
IssCode: N40085
IssuedBy: NAVFAC Mid-Atlantic

Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

AdmCode:
AdminBy: See Item 6
ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolChgYs: Yes
SolChgNo: Off
SolAmdNo: N40085-26-R-9008
AmendDate: 01/13/26
ModNo:
ModDate:
NoCopies: 1
Amended: Yes
OffrExt: Off
OffrNoEx: No
ApprData:
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: 26-9008, FC306 Laundry Room

Amendment 0001, Answer Requests for information

The time and date for receipt of proposals remains unchanged.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

See Continuation Page(s)

SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:

File details come from the government source that posted it. Updated .