26R0153 Bulkhead TPier - PLA Request for Information.pdf

PDF 109 KB Posted

Attached to
Bulkhead Repairs S50S and T Pier Demolition Naval Station Newport, Newport, Rhode Island
Solicitation number
N4008526R0153
Issued by

About this file

This is a Request for Information (RFI) regarding the potential use of Project Labor Agreements (PLAs) for federal construction projects at Naval Station Newport, Rhode Island.

NAVFAC Mid-Atlantic is conducting a market survey to solicit public comments on implementing a PLA for two related construction initiatives: (1) Bulkhead S50 South/LNG repairs involving approximately 686 linear feet of steel sheet-pile replacement and 193 linear feet of rip-rap replacement, and (2) Option 1 T-Pier Demolition (Facility #S528) including removal of concrete, excavation and disposal of soil/fill, dredging of sediment below the waterline, and removal of steel sheet-pile structures and associated infrastructure. The project NAICS Code is 237990. The estimated construction magnitude ranges from $25 million to $100 million with an anticipated performance period of approximately 610 calendar days. Executive Order 14063 requires PLAs on large-scale federal construction projects with total estimated costs at or above $35 million. The RFI includes a seven-question questionnaire addressing contractor experience with specialized construction, labor availability in the region, contractor interest and potential impact of PLA requirements, prior PLA usage on similar projects, union versus prevailing wage rate comparisons, and potential cost implications.

Responses to the attached questionnaire must be submitted via email to catharine.a.keeling.civ@us.navy.mil no later than 2:00 P.M. local time on May 13, 2026. This is a planning survey only and does not constitute a solicitation, obligation, or basis for contract award. All information will be held confidentially and used solely for the stated purposes. No debriefing will be provided on survey results.

View the file

Other files

File Type Posted
26R0153 - PLA Questionnaire .docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Labor Agreement (PLA) Request for Information (RFI) for

Bulkhead Repairs S50S and T Pier Demolition Naval Station Newport, Newport, Rhode Island

This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.

Naval Facilities Engineering System Command (NAVFAC) Mid-Atlantic is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. This project will repair by replacement of the southern portion of S50 and associated stormwater system infrastructure. Bulkhead S50 South/LNG is the most southern portion of a larger shoreline bulkhead system constructed to stabilize the upland area and support the shore facilities and infrastructure in the Coddington Cove area of Naval Station Newport.

This project will protect the embankments and shore structures from erosion and prevent further bulkhead damage from wave action. This project shall meet all aspects of the applicable EPA Record of

Decision (ROD) for the CERCLA/IR Superfund Site, Site 19 and meet the requirements of the Federal

Facility Compliance Agreement the Navy has made with the EPA.

Bulkhead S50 South (LNG) consists of approximately 686 LF of steel sheet-pile and 193 LF of rip-rap.

The existing bulkhead and rip-rap is currently in disrepair. This project proposes to repair the damaged sheet-pile wall by replacing it with a new steel sheet-pile system that will include a wale system connected to a sheet-pile deadman anchor. The new system will be coated with a macro epoxy to help prevent corrosion. The rip-rap portion of S50 South/LNG will be replaced in kind to maintain shoreline stability.

For Option 1 T-Pier Demolition, the project includes the demolition of the T-Pier (Facility #S528) located in the waterfront area of Coddington Cove (CC), Naval Station Newport. The T-Pier (Transit

Shed Pier) is constructed of fill material surrounded and supported by steel sheet-pile bulkhead.

Demolition shall include removal and disposal of concrete slab atop of the facility. Soil/fill within the structure will be excavated and disposed. Sediment/fill below the waterline shall be excavated/dredged and disposed. The steel sheet-pile bulkhead and structural supports, shall be cut 2 feet below the mudline and disposed. Project shall include removal of associated infrastructure located within or around the T-

Pier (e.g. mooring dolphins, steel piles, utilities etc.). The project NAICS Code is 237990. The magnitude of construction is anticipated to be $25M – $100M. General period of performance is anticipated to be approximately 610 calendar days.

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states:

Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at RFO 22.502-2(d) applies. Reference is made to: RFO Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects;

provision, RFO 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, RFO

52.222-34 Project Labor Agreement.

In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.

This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for

Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The

Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.

Responses shall be submitted on the attached questionnaire via email to catharine.a.keeling.civ@us.navy.mil no later than 2:00 P.M. local time on 13 May 2026.

Project Labor Agreement (PLA) Questionnaire

Questions Responses

1) Are you responding as a representative of a government entity, union, contractor (union or non-union) and/or qualified small business?

2) Would the work involve specialized construction that is available from only a limited number of contractors or subcontractors? Explain in detail.

3) What is your understanding of the availability of union labor and non-union labor in this area for this type of project? Are you otherwise aware of national, regional, or local interest in participating in this project by union or non-union contractors.

Explain in detail.

4) As a qualified contractor for a project of this type, would you be interested in participating in this project?

Would the requirement of a PLA under this project impact your interest in any way? Explain in detail.

5) Are you aware of PLAs having been used on other similar construction projects in the area and/or other nearby areas?

Explain in detail.

6) How do union wage rates compare to prevailing wage rates for this type of project and in this area, i.e., prevailing wage rates under the Construction Wage Rates Requirements statute

(formerly known as the Davis-Bacon Act). Explain in detail.

7) Are there any ways in which the requirement of a PLA might increase costs on a project of this type in this area? Explain in detail.