This document is a Sources Sought Project Data Form for a construction project at Naval Submarine Base New London in Groton, Connecticut. The opportunity is a pre-solicitation notice seeking small businesses (including HUBZone, Small Disadvantaged, Service-Disabled Veteran-Owned, and Women-Owned) for a complex weapons and ordnance facility construction project. The scope includes building six Containerized Long Weapons Storage (CLWS) magazines, two Type G and one Type H earth-covered high-explosive magazines, overhead cranes, and related infrastructure.

The project involves extensive site work including rock excavation, grading, wetlands mitigation, construction of an Ordnance Operations building, Truck Inspection and Sentry buildings, and demolition of 18 existing magazines. Technical specifications include special foundation features like rigid inclusions and load transfer mats, electrical utility systems, site improvements, access roads, and paved truck loading areas. The solicitation is being managed by the Naval Facilities Engineering Command, Mid-Atlantic, with the primary purpose of conducting market research to determine potential small business set-aside opportunities for this significant military construction project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – CONSTRUCTION EXPERIENCE PROJECT DATA FORM

Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.

1.
Contractor Name:
2.
Project No. (check one):
|_| - 1|_| - 2|_| - 3|_| - 4|_| - 5
3.
Contract Number:
Delivery/Task Order No.:
Project Number:
Title:
Location:
4.
Award Date (mm/dd/yy):
5.
Final Contract Price:
$
Completion Date (mm/dd/yy):
(includes all options and mods)
Project is % complete (as of submission due date)
This is the |_| total project |_| subcontract price.
6.
Type of work:
|_| New Construction|_| Repair|_| Renovation
7.
Customer/Owner Name:
Point of Contact Name/Title: (person with project knowledge)
POC Phone Number:
POC Email Address:
8.
Were you the Prime contractor for this project?
|_| Yes|_| No
Were you a subcontractor for this project?
|_| Yes|_| No
If subcontractor, who was the Prime contractor?
9.
Type of Contract (check all that apply):

|_| Design-Build |_| Design-Bid-Build (fully designed project)

|_| Other (explain):
If Design-Build, provide the following information:
|_| Design accomplished in-house
Lead design firm name:
Years working together:
Address:

10. Provide a detailed description of the project:

11. Percentage of work you self-performed on this project: %.

Provide a detailed description of the work your firm self-performed on this project:

Form may be expanded. Please DO NOT change content of the form.

File details come from the government source that posted it. Updated .