This Pre-Proposal Inquiry (PPI) Submission Form documents questions and responses for a Navy contract (N4008525R2685) to replace guardrails at Building 1807. The document contains 34 detailed inquiries from potential contractors, addressing key project specifications including concrete removal, deck coating, railing installation, safety requirements, and site conditions. Significant clarifications include confirming the project is design-bid-build with a portion of delegated design, specifying that full concrete replacement is not expected, and requiring the entire walkway between railing repairs and building to be re-coated.
Key technical details reveal the project involves balcony repairs where contractors must remove existing slab, metal deck, and adjacent structures as necessary to complete handrail replacement. The government expects contractors to address superficial concrete cracks according to topcoat manufacturer recommendations, seal joint conditions to prevent water intrusion, and repair EFIS/stucco areas damaged during construction. The building will remain occupied during construction, and contractors must follow EM-385-1 safety specifications, protect mechanical equipment, and coordinate work around existing residents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1807 Record Drawings.pdf | ||
| 25R2685 Site Visit Log.pdf | ||
| N4008525R2685 Amendment 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Inquiry Submission Form
N4008525R2685 - Replace Guardrail at Building 1807
Date Submitted
LEAVE
BLANK
Reference
Question Response Page Section Paragraph
05/07/25
Spec section 01 35 26, paragraph
1.8.3 states the level 2 SSHO may not serve as QC manager or superintendent. However, spec section 01 45 00, paragraph 1.6.1.1 states the QC manager is also to serve as the SSHO. Is the government allowing those 2 roles to be performed by the same person?
Yes
05/07/25 Will the government also allow the superintendent to perform the roles of SSHO and QC manager?
No
05/07/25 How thick is the concrete slab over metal deck that contractors will be removing?
See detail C3 Sheet A- 501.
05/07/25
Is the expectation for the contractors to remove the concrete slab down to the metal deck, or just deep enough to remove the current hand rails and install new?
Remove existing slab, metal deck, adjacent structure, etc. as necessary in order to complete the work.
05/07/25
How far out from the hand rails are contractors to provide saw cutting to remove the concrete and hand rails?
It would help if there was an approximate quantity for removal of concrete for all contractors to base our bids on so everyone is bidding on the same amount.
The Government expects the contractor to remove existing slab, metal deck, adjacent structure, etc. as necessary in order to complete the work.Only repair/replace what is damaged or removed to facilities per the SOW.
05/07/25
SOW asks contractors to repair all cracks along topside of balcony decks to eliminate water infiltration.
Can the government provide an approximate amount of cracks to be repaired so all contractors are basing their bids on the same amount?
We believe the cracks are superficial and need to be addressed IAW concrete top coat manufactures recommendations.
05/07/25 Is there an approximate amount of stucco repair that is anticipated being required on this project?
No. Only repair/replace what is damaged or removed to facilities per the SOW.
05/07/25
SOW asks contractors to apply gray waterproof deck coating to both balconies. Are contractors to remove the waterproof coating completely from each balcony and replace, or just in areas where the waterproof coating is damaged? If it is the latter, will the government provide approximate square footages of the coating that needs to be repaired?
The Government expects the entire balcony to be coated IAW with manufacture's instructions.
05/15/25
It was mentioned during the site visit that the contractors are responsible for determining the best means to install the new railings into the deck.
If this is the case, would that make this project a design/build, as we would need an engineer to provide stamped drawings as well as performing calculations on if the structure can bear the required weight?
This is a design bid build project. A portion of the project is delegated design as shown on drawing A- 501 and specification 05 12 00 Paragraph 1.3.3
05/15/25
Are there any more current record drawings showing how the existing rails are installed? There appeared to be multiple areas of differing means of installation of the railings.
See Record Drawings
05/15/25
Will the building be occupied during construction or will this project need to be phased to accomodate moving residents during periods of construction?
See specifications 01.14.00
05/20/25
There is no specification or notes on the drawings regarding replacement concrete for the deck. Can either pre-bagged repair mortars or ready mix be used.
Either pre-bagged or ready mix is acceptable as long as it is compatible with the top coat.
05/20/25
During the prebid walkthrough there were noticable cracks in the concrete walkways. It was indicated that these cracks are to be repaired however there are no notes or locations indiacted on the drawings.
Please provide a quantity of cracks to be included in the repairs. Also there is no specification section for crack repair. Do these cracks need to be repaired with epoxy injection / gravity feed or shall they merely be sealed with urethane sealants.
We believe the cracks are superficial and need to be addressed IAW concrete top coat manufactures recommendations.
05/20/25
Demolition note #3 indicates that only areas exhibiting scalling are to be stripped or grinded away down to bare concrete. It was indicated during the walkthrough that all existing coating is to be removed down to the concrete substrate for new coating work. Please confirm whether all existing coating is to be removed or just localized areas. If just localized areas indicate how much spot removal is to be included.
All coating is to be removed.
05/20/25
Specifications include section 09 67
23.13 referencing Standard
Resinous Flooring. Is it the intent to use this specifcatin for the new coating applied on the walkways or a more movement capable urethane
If other alternative is available. Please submit for review and approval.
system typically used in similar installtions but not currently specified or called out in the contract documents? Please confirm.
05/20/25
Detail A3 on A-501 shows the edge condition. There is no sealant indicated between the metal edge strip and the concrete. Please confirm whether this joint condition is to be left open as currently shown or should be sealed with some type of urethane sealant to mitigate water intrusion / rusting at the interface.
Joint to be sealed to prevent water intrusion.
05/20/25
It was discussed at the prebid walkthrough that the joint sealant at the interface between the horizontal concrete walkway slabs and the units vertical EIFS / Stucco walls was to be replaced. Please clarify whether any sealant is to be replaced and where.
EFIS/Stucco to be repaired as needed in areas that have been repaired/replaced or damaged to facilitate
SOW.
05/21/25 Will the building be occupied during construction?
See specifications
01.14.00
05/21/25 Will work outside of regular working hours be required on this project?
See specifications 01.14.00
05/21/25 Could the government please specify the location of the lay down area
Approximately close to construction area.
(Exact location to be determined post award)
05/21/25
Will all the concrete slab need to be replaced as noted on Sheet A-501?
If not, could the government provide a CLIN on the price proposal sheet to properly qualify the cost associated with this repair?
Full concrete replacement not expected. Concrete removal only necessary to the replacement of handrail only.
05/21/25
Could the government specify the L.F. of crack repair required to be repaired? If not, could the government provide a CLIN on the price proposal sheet to properly qualify the cost associated with this repair?
We believe the cracks are superficial and need to be addressed IAW concrete topcoat manufactures recommendations.
05/21/25
Could the government specify the S.F. of concrete spall repair required to be repaired? If not, could the government provide a CLIN on the price proposal sheet to properly qualify the cost associated with this repair?
Full concrete replacement not expected. Concrete removal only necessary to the replacement of handrail only.
05/21/25 Is the entire walkway between the railing repairs and building to be re-coated on this project?
Yes
05/21/25 Is the entire walkway between the railing repairs and building to be receive a new concrete slab?
Full concrete replacement not expected. Concrete removal only necessary to the replacement of handrail only.
05/21/25 Can the QC Manager serve as the superintendent on this project?
Yes
05/21/25
The general notes state that the building will be occupied during construction. The balcony areas will be removed during constuction and it will be unsafe for any personnel to be living in the rooms. How does the
Government expect for us to work around the tenants?
The balcony areas will not be removed. Balcon will be repaired per specifications.
Contractor must follow
EM-385-1
05/21/25 Please specify what areas of the building will be occupied during construction.
See specifications01.14.00
05/21/25
The general notes state that dust controls are to be in place to protect mechanical equipment adjacent to the work area. Could the government please specify what areas are to be protected? What means of protection is required?
Contractor is responsible for protecting mechanical equipment against construction debris and dust as to not impact the operation of the equipment. PTAC units.
05/21/25 Is any phasing required for this project?
See specifications
01.14.00
05/21/25
Is the plan to notch out the concrete (approx. 8-10 inch square ) to allow removal and replacement ? Or does the government want a full replacement of the concrete balcony walkways on the 2nd and third floors?
Full concrete replacement not expected. Concrete removal only necessary to the replacement of handrail only.
05/22/25 Please share the Sign In Sheet.
See Site Visit Log
Attachment
05/22/25 Can a single person be a
QC/Superintendents/SSHO if qualify?
No
05/22/25 Is US Citizen mandatory at Job site?
See specifications
01.14.00
05/22/25
Please provide the incumbent steel subcontractors information, company name, POC information (Name, email, Phone).
See Site Visit Log Attachment for all available information provided.
05/22/25 Railing Replaced
Please provide a product number for existing paint. Paint spec doesn't specify colors or products to match existing
Contractor to match existing.
05/22/25 Railing Replaced Please provide a detail for decking support at new hand rail post pockets
See Record Drawings
05/22/25 Railing Replaced
Please provide specs for existing decking. The new decking must match the existing profile at the overlap joint
See Record Drawings
05/22/25 Railing Replaced
Removing 12"of concrete from the edge of the wall is not enough to overlap decking during the concrete installation
Not a question. Please see drawings and specifications. Drawing AD-101, Demolition
Note 2.
05/22/25 Railing Replaced Please provide spec for concrete coatings See specification Sec.
09.67.23.13
05/22/25 Railing Replaced
For competative bid purposes, a square footage of stucco repair needs to be quantified by the owner to align bids
Replace only what is damaged during replacement of handrail
05/22/25 Railing Replaced
Will we be able to shut down sections of the walk-way until work is completed? If not then temp railing will be needed. Please provide a detail for temp railing if walkways must remain open
Contractor responsible, see specifications EM-
385-1
05/22/25 Railing Replaced
What type of framing is forming the ceiling below the C4. We feel that the decking has rusted away and is not under most of the floor slab. If this is infact the case, concrete will fall to the ceiling of the floor below during the sawcutting proccess
See Record Drawings
05/22/25 Railing Replaced Is overhead protection needed on the floor below for safety?
Contractor responsible, see specifications EM-
385-1