P993-P995 Industry Day.pptx
PPTX presentation 32 MB Posted
- Attached to
- P993 F35 Sustainment Center, MCAS Cherry Point
- Solicitation number
- N4008525R2515
About this file
This is an Industry Day presentation for two major construction projects at Marine Corps Air Station Cherry Point, North Carolina, to be advertised by NAVFAC Mid-Atlantic in January 2025. The projects consist of P-993, a $250-$500 million F-35 Sustainment Center, and P-995, a Composite Repair Facility.
P-993 is a 255,461 sq ft depot-level hangar designed to support 20 F-35 aircraft, featuring four paint booths, administrative space, aircraft modification shops, tool shops, and an ICD705-compliant secure area. The facility will be constructed using precast structural concrete panels, pile-supported foundation, and cross-laminated timber roof deck, with site development including utility improvements and a taxiway with bridge. P-995 is a 105,755 sq ft consolidated depot-level facility for advanced composites and rotor blade repair, constructed with structural steel roof framing, metal insulated roof system, and CMU walls with brick veneer. The facility includes specialized areas for composite repair, manufacturing, rotor blade repair, and shared spaces for painting, parts washing, and support functions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P993-P995 Industry Day Flyer.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P993/P995, F-35 AIRCRAFT SUSTAINMENT CENTER AND COMPOSITE REPAIR FACILITY, MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NORTH CAROLINA
INDUSTRY DAY
19 December 2024 0900-1100
AGENDA
| Time | Action | Presenter | |||
| 0900 | Opening Remarks | NAVFAC Contracting | |||
| 0905 Introductions | NAVFAC Contracting | ||||
| 0910 Ground Rules and Goals | NAVFAC Contracting | ||||
| 0915 | Procurement Strategy | NAVFAC Contracting | |||
| 0920 | Project Presentation | NAVFAC Design Team | |||
| 1015 | Questions | NAVFAC Contracting | |||
| 1100 | Adjourn |
INTRODUCTIONS
Kim Kahler, Chief of the Contracting Office, NAVFAC Mid-Atlantic Philip Cole, Contracting Officer, NAVFAC Mid-Atlantic Brittany Cristelli, Contract Specialist, NAVFAC Mid-Atlantic Kevin Ball, Project Manager, NAVFAC Mid-Atlantic Sterling Hoy, Design Manager, NAVFAC Mid-Atlantic Dan Purpura, Project Manager, HDR David Griffith, Project Manager, MBF
GROUND RULES
This meeting is informational and for planning purposes only.
This is not a Request For Proposal (RFP). Discussions today will not be evaluated in response to any future requests for proposals.
Do not provide the Government with proprietary information, trade secrets, or any other information deemed source selection sensitive, or information that you do not want disseminated to the public.
Effort that any contractor/entity expends on this effort is at its own time, risk, and expense.
Hold all questions until the end of the presentation.
Everything you see today is a DRAFT and is subject to change.
INDUSTRY DAY GOALS
Notify the Industry of the upcoming solicitation for the P993/P995 – F-35 Aircraft Sustainment Center and Composite Repair Facility, Marine Corps Air Station, Cherry Point, North Carolina.
Inform Industry of the scope, timeline, and possible construction challenges for the project.
Solicit private sector input to help shape the project procurement.
PROCUREMENT STRATEGY
Project Budget DFARS 236.204 Magnitude of Construction: Between $250M and $500M
Acquisition Strategy Design-Bid-Build with Early Contractor Involvement Full and open competition Two segments to the procurement process Segment I – ECI Best value tradeoff process Up to 3 contractors will be selected for the ECI efforts.
Segment II – Construction Best value tradeoff process The contractors selected for Segment I will be prequalified to propose on the construction. Only the contractors who participated on the ECI segment will be prequalified.
Project Labor Agreement will be required.
EARLY CONTRACTOR INVOLVEMENT
ECI will focus on P993 but will also consider coordination and schedule with P995.
Projects will be at 65% design.
Contractors will work collaboratively with DOR and the Government team to improve the overall project delivery.
Preconstruction services will generally include:
Reviewing and evaluating the design documents at specified stages to identify potential constructability challenges and risks Provide value engineering-style recommendations and alternative ideas to improve the final product considering cost and schedule Advising on efficient construction means and methods Providing construction cost information Identifying construction cost and schedule risks and mitigation recommendations DOR maintains responsibility for the quality and engineering compliance for design Ensure design does not inhibit use of efficient construction means and methods, and to develop design solutions that avoid constructability challenges and minimize cost and schedule risks Careful consideration to avoid revealing any confidential business and proprietary information
PROCUREMENT TIMELINE
Segment I - ECI RFP: 9 January 2025 Proposals Due: 10 February 2025 Award: 14 March 2025 65% On-Board Review Meetings: Within 2 weeks of award
Segment II - Construction RFP: September 2025 Proposals Due: November 2025 Award: February 2026 Construction Duration: 1,274 days
SELECTION FACTORS
Segment I - ECI Best value tradeoff process Non-price significantly more important than price Non-price Corporate Experience (preconstruction services and construction), Preconstruction Services Approach, Safety, Past Performance Price for Preconstruction Services
Segment II - Construction Best value tradeoff process with prequalified offerors Non-price approximately equal to price Non-price Schedule and Small Business Utilization and Participation Price for Construction
PROJECT PRESENTATION
P-993
NAVFAC / HDR
Total Area: 255,461 SF 406 Parking Spaces + 20 Motorcycle Spaces outside the perimeter 379,000 sf Aircraft Parking Apron, 325,000 sf Aircraft Taxiway, New Water Tower ICD/ICS 705, Marine Corps level II, and JPO security requirements
Project Location
Hancock Village
MCAS Cherry Point
Project Location New bridge over wetlands Utility upgrades for Hancock Village Relocate installation perimeter fence New water tower to support fire service to Hancock Village Coordinating with concurrent adjacent facility construction / operations
Wetlands
Runway 5R
Scuff and Refresh
P-1066
P-993
Laydown Area P-1055 (Future)
P-995
Hancock Village Utilities
Telecom Point of Connection Fire Main Point of Connection Water Main Point of Connection Existing Elec Switch Existing Elec Switch
P-993 and P-995
BUILDING COMPONENTS
Structural Primary Steel Structural System Pier Supported Foundation System Slab on Grade Composite Second Floor Cross Laminated Timber Roof Deck Curtainwall Aluminum Panel Low Carbon Concrete (Floor Slabs, Precast Concrete) Life Safety Fully Sprinklered Mechanical Chilled Beams within Administrative Areas Central Plant with Air-To-Water Heat Pumps Conditioned Hangar Bays Transpired Solar Collector Wall
CONNECTOR
EXTERIOR CONCRETE LAYER
INTERIOR CONCRETE LAYER
INSULATION
Electrical
(2) 625 kVa Generators Electrification
First floor plan
(20) F-35 Hangar Bays Canopy/ Seat Shop Support Equipment Classified Storage LO Shop Tool Room Mod tooling Machine Shop Offices
(4) Paint Booths Paint Hygiene Area Paint Support Breakroom Locker / Shower rooms
Second floor plan
Open Office for 100 occ.
Private Offices Mothers Room Break Room Classroom Conference Rooms
Second floor plan Open Office for 100 occ.
Secure Conference Rooms Secure Rooms Private Offices Mothers Room Break Room Classroom Conference Rooms
Enclosure Design
| Description of | ||
| System | Prescriptive requirements | Proposed P-993 Design |
Case
| High Insulation R-Value Walls | R-7.6 c.i. | R-22.5 mass wall |
| High Insulation R-Value Roof | R-25 c.i. | R-40+ c.i. |
| Low U-factor Windows | 0.42 assembly | 0.36 assembly |
| HVAC System Type | VAV with Fan-Powered reheat boxes | Active Chilled Beam for office area |
| DHW Heaters | Electric resistance water heater | Electric Heat Pump water heaters |
Precast Concrete Wall Cross Laminated Timber Roof Deck
Pilot Project Objectives Net-Zero Emissions Building Electrification Sustainable Materials Energy Efficiency Passive Design
1. Aggressively insulate from the elements
2. Capture solar heat gain in winter
3. Shade from solar gain in summer
4. Provide natural ventilation
5. Reduce temperature swings with thermal mass
6. Use daylight as the primary light source
7. Control glare
8. Seal all gaps for air tightness
9. Generate electricity (on-site or co-located with other installation renewable sources)
10. Maximize views
Sustainability goals
| Federally Aligned P-993 Project Requirements and Goals | 65% Project Compliance Progress | |
| Energy Reduction | ||
| 30% energy savings from ASHRAE 90.1-2019 | ||
| 58.5% Reduction with Renewables | ||
| Net-Zero Carbon Emissions | ||
| Net-zero emissions building portfolio by 2045, including a 50% emissions reduction by 2032 |
Net 100% carbon-free electricity by 2030 Designed for Net-Zero Emissions Duke Energy will provide Carbon-free electricity in 2026 per DOD partnership
| Electrification | ||
| DOD Memo / ECB 2023-08 / CATMS1 USA001551-23 Memo | ||
| Where market-ready technology exists, use all-electric for building system components, including space conditioning, water heating, cooking, and laundry. | 100% All-Electric Building |
| Water Conservation | |
| Reduce combined indoor and outdoor potable water use by at least 20% | 35% Reduction using WaterSense-labeled flush/flow fixtures |
100% Reduction in Outdoor Water
| Sustainable Materials |
| NDAA 2022-Incorporate the Use of Sustainable Materials as Structural Components |
20% of material to meet the Low (Achievable) embodied carbon target from the 2021 CLF Material Baseline Report. 26% reduction in Embodied Carbon of the roof assembly with the use of Mass Timber (CLT) for roof decking Low carbon concrete is included in the Specifications
| Health and Wellness | |
| UFC 1-200-02 Daylight optimization | 0% Daylight Glare Probability (DGP) for the hangars |
Function First- Building Purpose
Reduce Loads
Optimize Systems
Controls / Equipment
Recover Energy
Generate Energy
LCCA
Carbon reduction
26% 32% GWP (tCO2e) % Reduction
| Concrete | 5,749 | 38% |
| Hot-rolled Steel | 3,107 | 21% |
| Rebar | 2,297 | 15% |
| Insulation | 2,117 | 14% |
| HSS Steel | 667 | 4.4% |
| Mass Timber | 370 | 2.5% |
| Steel Decking | 163 | 1.1% |
| LW Concrete | 143 | 1.0% |
| Cold-Formed Steel | 132 | 0.9% |
| Membrane | 105 | 0.7% |
| Sheathing | 94 | 0.6% |
| Glazing | 57 | 0.4% |
| TOTAL | 15,000 |
Embodied Carbon: Exterior Wall Proposed vs Baseline (Crade to gate (A1-A3)
Concrete/CMU Precast Concrete CMU (Baseline) 64.600000000000009 57.2 Rebar Precast Concrete CMU (Baseline) 13.4078 10.05585 Insulation Precast Concrete CMU (Baseline) 57.225344 57.225344 Steel Support Precast Concrete CMU (Baseline) 26.339223272727278 Brick + Mortar Precast Concrete CMU (Baseline) 47 GWB Precast Concrete CMU (Baseline) 2.23 kgCO2e/m2 of facade
Transpired solar collector wall
Preheats air during cool months Provides additional thermal layer preventing southern exposure walls from heat gain
Reduces additional cost for precast concrete reveals/ patterns.
Passive system with minimal mechanical components such as dampers
Renewable energy – Carbon free electricity
1,000 kW Solar Array provides 54.8% of the whole building energy use and 75.4% of regulated energy use.
Additional 25% of regulated energy use will be offset with carbon-free electricity from the local utility.
Photovoltaic system will be tied into base wide system to optimize generated energy rendering
P-995
NAVFAC / MBF
P-995 Composite Repair Facility - Floor Plan
P-995 Composite Repair Facility – Exterior Elevations
P-995 Composite Repair Facility – Exterior Form
P-995 Composite Repair Facility Project Facts:
Building Area: 105,755 SF maximum area per DD1391 (105,720 as currently shown) 100 parking Spaces, located outside the fenced perimeter Includes (12) overhead bridge cranes, 2 Ton capacity each (3 are within paint/sanding booths)
Large Equipment:
Autoclaves: Large (15x40 inside), Medium (8x20 inside), Small (3x5 inside)
(1) Composite Oven
(2) Sanding Booths, (1) Paint Booth
(1) X-Ray Booth
(1) Walk-In Freezer, (3) small freestanding freezers
Electrical / Telecomm:
(4) Separate electrical services, w/ (2) 1500 KVA PMTs, (1) 750 KVA PMT, (1) 300 KVA PMT OSP Communication currently estimated at 48 strand SM Fiber and 400 pair copper Generator to backup freezers Lightning Protection Electrification mandate does NOT apply
HVAC:
4 pipe CHW/HW system: CHW system- 125 ton cooling load. HW system- (4) gas-fired boilers Air system: (1) DOAS unit w/ CHW/HW coils & fixed plate cross-flow heat exchanger RTUs zoned as appropriate, supply and return ducted directly to spaces
ANY QUESTIONS?
Any additional questions can be submitted in writing to: brittany.n.cristelli.civ@us.navy.mil image14.jpeg image15.png image16.png image17.png image18.png image19.jpeg image20.jpeg image21.png image22.jpeg image23.png image24.png image25.jpeg image26.png image27.jpg image28.png image29.jpeg image30.jpg image31.jpg image32.jpeg image33.png image34.jpeg image35.png image36.png image37.png image38.png image39.png image40.jpeg image41.png image42.png image43.png image44.png image45.png image46.emf
3x
A U
TO
C
LA
VE
G
LL
O
N W
TE
R T
K
15x40
AUTOCLAVE
BRIDGE BY
MANUFACTURER
TR
L
S
TA
TI
D
E
LO
BLOWER AND VFD CABINET
EXHAUST
SILENCER
PURGE
BLOWER
B
IN
M
P
W
8x20
PIT DEPTH: 48"BRIDGE BY
MANUFACTURER
COMPOSITE OVEN
CONTROL
COMM
OFFICE
CONF.
TRAINING
BULLPEN
COMPRESSOR
ELEC
BLADE: DIRTY
COMPOSITE: INCOMING
MAIN CORRIDOR
PRODUCTION SUPPORT
COMPOSITE: DIRTY
HONEYCOMB
HONEYCOMB MACHINING
TOOL RM.
COMPOSITE: STORAGE
COMPOSITE: OUTGOING
COMPOSITE: CLEAN
BLADE: POST-BONDING
BLADE: BALANCING
PAINT BOOTH
BLADE: CLEAN
BA
CK
RR
ID
PREP
COMPRESSOR
MECHANICAL
FIRE PUMP
LOCKERS
BREAK
PPE LOCKERS
CORRIDOR
JANITOR
STACKERS
FEMALE
MALE
WELLNESS
SANDING BOOTH
I V
COMM
' W
AI
CU
RT
AI
' W
H
24' WIDE AIR CURTAIN
COPIER ETC.
CLEAN ROOM STAGING
SINGLE-LINE CRANE W/ (2) HOISTS: ENTIRE LENGTH OF CORRIDORSINGLE-LINE CRANE W/ (2) HOISTS: ENTIRE LENGTH OF CORRIDOR
BR
GE
RA
BRIDGE CRANE BRIDGE CRANE
BRIDGE CRANE BRIDGE CRANE
BRIDGE CRANE
X-RAY
FREEZER
AUTOCLAVES
MECHANICAL
SHOWER
UTILITY
UTILITY
SHOWER
VESTIBULE
FEMALE CLEAN
FEMALE
FEMALE DIRTY
MALE DIRTY
MALE
MALE CLEAN
SANDING BOOTH
101A
103A
103B
104A
105A
101C
116A
117A
119A
121A
122A
130B
132A
182C
182B
180B 176A 176B
174A 174B
173B173A
171A 171B
164A
163A
162A
154A
155A
146A
145A
144A
135B
133A
A115B
A 111B 107B
110A
112A
FREEZER
X-
Y
AUTOCLAVES / OVENS
PAINT
CIRCULATION / CORRIDORS
COMMON AREAS / SERVICES
OFFICE FUNCTION
SERVICE FUNCTION / MECHANICAL
COMPOSITE SHOP AREAS
BLADE SHOP AREAS
LEGEND
OVERHEAD CANOPY
OVERHEAD CANOPY
HAZARDOUS WASTE
CONTAINMENT
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
STA. PROJ. NO.:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
1 2 3 4 5
F
IL
IT
IE
DRAWFORM REVISION: 25 AUGUST 2020
IG
T
IO
V A
IR
ile ri n t
DO NOT USE FO
CONSTRUCTIO
PRELIM
INARY
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
P.
STCETIHCRA
FB
BERN N.C
.NEW
CERT. NO.
UTCETIHCRA
DERET
SI
G E R
NO
AR
OP
RO
LAR
CAROLINANORTH
50679
AS INDICATED
IC
p ro je c ts
\2
-9 o m s it e a ir ili ty u ll ig ff rt
J w g
.r v
/1
/2
:5
:4
IV
A-100
OF XX
35% SUBMITTAL
DEC 2024
IP
SCALE: 1" = 20'-0"
A1
COMPREHENSIVE FLOOR PLAN GRAPHIC SCALE: 1"=20'
20' 0 40'20'
Sheets
A-100 - COMPREHENSIVE FLOOR PLAN
image47.emf
FIRST FLOOR
0"
TOP OF WALL
25'-4"
ALUCOBOND-TYPE ALUMINUM
EXTERIOR PANEL SYSTEM
12" CMU/BRICK EXT WALL TO 25'-4" TYP
ALUCOBOND PANEL SYSTEM OVER
CMU COLUMNS UP TO 25'-4"
CURTAIN WALL GLAZING SYSTEM
AT FRONT OFFICE AND ENTRANCE
EXTERIOR PANEL SYSTEM ALUCOBOND-TYPE ALUMINUM
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
STA. PROJ. NO.:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
IG
T
V A ile ri
DO NOT USE FO
CONSTRUCTIO
PRELIM
INARY
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
P.
STCETIHCRA
FB
BERN N.C
.NEW
CERT. NO.
UTCETIHCRA
DERET
SI
G E R
NO
AR
OP
RO
LAR
CAROLINANORTH
50679
AS INDICATED
IC
ro je ts m it ir ili ty u ll ff rt
J w g
.r v
/1
/2
:3
:4
X
A-201
OF XX
35% SUBMITTAL
DEC 2024
IP
D1
SOUTH ELEVATION
C1
EAST ELEVATION
B1
NORTH ELEVATION
A1
WEST ELEVATION
GRAPHIC SCALE: 1"=20'
20' 0 40'20'
Sheets
A-201 - EXTERIOR ELEVATIONS
image48.tiff image49.tiff image50.png image1.jpeg image2.jpg
File details come from the government source that posted it. Updated .