This document is a Request for Proposals (RFP) for a Design-Bid-Build (DBB) construction project at the Naval Undersea Warfare Center in Newport, Rhode Island. The project involves constructing a new single-story secure facility addition to Building 1171, including utility services, site work improvements, and mechanical, electrical, fire alarm, fire suppression, and plumbing systems.

The solicitation is restricted to specific Multiple Award Construction Contract (MACC) holders in the North Area of Responsibility, with an estimated budget between $1,000,000 and $5,000,000. The contract duration is 360 calendar days from the award date, with liquidated damages of $993.30 per day for delays. Proposals are due on 27 August 2025 at 2:00 PM EST, and the government will evaluate proposals based on the lowest price. A mandatory site visit is scheduled for 6 August 2025 at 9:30 AM, with base access forms due by 30 July 2025.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BID-BUILD (DBB), B-1171 Test Facility Addition Solicitation No.: N40085-25-R-0103 Newport Naval Station, Newport, RI Work Order No.: 1885357

NAVAL FACILITIES ENGINEERING SYSTEM COMMAND, MID-ATLANTIC

9324 VIRGINIA AVE, BLDG Z-144, ROOM 216

NAVAL STATION NORFOLK, NORFOLK, VA 23511

POC: Angie Clifton, 757-341-0692, angela.j.clifton2.civ@us.navy.mil

DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE

QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR

FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO INCLUDE

CONNECTICUT, DELAWARE, MAINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW

JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT

MACC GROUP: ML-C00068

PROPOSED TASK ORDER: N40085-25-R-0103

DESIGN-Bid-BUILD (DBB), B-1171 TEST FACILITY ADDITION, NAVAL UNDERSEA

WARFARE CENTER (NUWC), NEWPORT NAVAL STATION, NEWPORT, RI

DATE OF SOLICITATION: 23 JULY 2025

NORTH AOR MACC CONTRACT HOLDERS:

N40085-21-D-0052 Benaka Inc.

7 Lawrence Street New Brunswick, New Jersey 08901 POC: C.N. Manjunath Phone: (732) 246-7060 Email: benaka@benakainc.com

N40085-21-D-0053 CCI Utility and Construction Services, LLC 111 W. 16th Avenue, Suite 402 Anchorage, AK 99501 POC: Jim Henebury Jeffrey Eaton Tim Nichols Phone: (207) 485-6701 Email: jhenebury@bbch-llc.com jeaton@bbch-llc.com Const-estimating@bbch-llc.com Const-proposals@bbch-llc.com

N40085-21-D-0054 Kunj Construction Corporation 163 B Paris Avenue Northvale, NJ 07647 POC: Neekunj Bhanderi Yatin Gajera Raghav Krish Phone: (201) 694-7617 Email: neekunjb@gmail.com Yatin@kunjcc.com Krish@kunjcc.com

N40085-21-D-0055 Ocean Construction Services 104 Aragona Boulevard, Suite 101 Virginia Beach, VA 23462 POC: Kara Laskowski Phone: (757) 200-9590 Email: bids@ocsinc.us

N40085-21-D-0056 PEM-Harkins Joint Venture 6161 Busch Boulevard, Suite 255 Columbus, OH 43229 POC: Radagodage Sumanaweera Phone: (614) 573-7299 Email: tsumanaweera@peminc.biz

N40085-21-D-0057 Tantara Corporation 54 Mason Street Worcester, MA 01610 POC: Dawn Dearborn Phone: (508) 752-5599 Email: DDearborn@tantaracorp.com

N40085-21-D-0066 J&J Contractors, Inc.

101 Billerica Avenue, Building 5, Suite 205 North Billerica, MA 01862 POC: Kamlesh Patel Phone: (978) 259-2454 Email: kamp@jjcontractor.com

GENERAL REQUIREMENTS

All terms and conditions of N4008521D0052/0053/0054/0055/0056/0057/0066 IDIQ Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not restated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue please contact Angie Clifton at angela.j.clifton2.civ@us.navy.mil.

Amendments will be posted directly to PIEE, Sam.gov and sent directly via email to MACC Holders. It is ultimately the responsibility of the MACC Holders to monitor SAM.gov for any updates.

NAVFAC Solicitation No.: N40085-25-R-0103

NAVFAC Specification/Drawing: Work Order No. 1885357

Title: Design-Bid-Build (DBB), B-1171 Test Facility Addition, Naval Undersea Warfare Center (NUWC), Newport Naval Station, Newport, RI

Location of the work: Newport Naval Station, Newport, RI

Description of the work: This Design-Bid-Build project includes the construction of a new single story secure facility located on the east side of the existing building 1171. The construction includes utility services for the facility and site work improvements. The construction includes mechanical, electrical, fire alarm, fire suppression, and plumbing systems and incidental related work for a complete facility.

Estimated Budget Amount or Price Range: In accordance with FAR 36.204(f) Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $1,000,000 and $5,000,000.

Time for completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the duration of this task order (including Bid Options) shall be 360 calendar days from date of award (includes 15 calendar days for submission and approval of bonds and insurance).

Wage Determination: Department of Labor (DoL) General Decision Number: RI20250001 07/04/2025 (Attachment B) applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated in the award.

Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $993.30 for each calendar day of delay until the work is completed or accepted.

Utilities: The Contractor shall be responsible for obtaining all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.

Record Shop Drawings: In accordance with FAR 52.236.21, Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are required.

Government Furnished Property: There is no Government Furnished Property.

Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less.

Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.

Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.

Definitization Of Equitable Adjustments For Change Orders Under Construction Contracts No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. The REA definitization information referenced in Navy Marine Corps Acquisition Regulation Supplement (NMCARS) 5236.211(b)(2), should not be utilized. There are no agency-specific policies and procedures that apply to the definitization of equitable adjustments for change orders under construction contracts. This Contract contains rated order quantities certified for national defense use, and you are required to follow all the provisions of the DPAS regulation (DPAS Regulation - 15 CFR Part 700.12) only as it pertains to the rated quantities.

Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries shall be submitted via email to Angie Clifton at angela.j.clifton2.civ@us.navy.mil no later than, fourteen (14) calendar days prior to proposal due date.

Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment C).

Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment by email to MACC holders.

Site Visit: All MACC holders are invited to attend the Site Visit for this project. Firms participating in the site visit will not be directly compensated for their participation.

Date: 6 August 2025 Time: 0930 AM Site Visit Location: Refer to Attachment F – Site Visit Map

Base Access Instructions: Refer to Attachment G, H, and I for Base Access. ALL BASE ACCESS

FORMS ARE DUE BY NOON 30 JULY 2025.

Site Visit Attachments:

Attachment F – Site Visit Map Attachment G - NUWC Visitor Request Information Guidelines Attachment H - SECNAV Form 5512-NSNPT Attachment I - Site Visit Instructions

Site Visit POCs:

Stefan Nussaney, Contracting Officer, (401) 829-9161

August (Augie) Carrillo, Mechanical Engineer/DM, (401) 841-6609

Proposal Due Date: Wednesday, 27 August 2025 at 02:00PM EST. LATE RESPONSES WILL BE HANDLED IN ACCORDANCE WITH FAR 15.208(b).

Electronic Copies: Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment E.

Emailed submissions will not be accepted.

Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.

The PIEE system will record the date and time of package submittal. Upon successful receipt of the proposal through PIEE, the Offeror should receive an email confirmation. Please keep this for your records. The date and time of package receipt recorded in PIEE shall govern the timeliness of any proposal submission. Late responses will be handled in accordance with FAR 15.208(b).

Evaluation Factors for Award:

1. The proposed task order will be awarded to the responsible Offeror offering the best value to the

Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each Offeror on price only.

2. Basis of Evaluation and Submittal Requirements.

Price:

i. Solicitation Submittal Requirements:

Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one (1) electronic copy via The Procurement Integrated Enterprise Environment (PIEE), with the solicitation submittal requirements identified below:

a. Cover page with solicitation number, solicitation title, offeror name, address, phone number, Employer Identification Number (EIN), Unique Entity Identifier (UEI) in SAM, CAGE code, Federal Tax ID number, Point of Contact (POC), POC phone number, and

POC email address;

b. All amendments acknowledged;

c. Price Schedule Form;

d. Copy of Representation and Certifications and proof of registration in System for Award

Management (SAM);

e. Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2023/2024 filing cycle; and

f. Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least twenty percent (20%) of the proposed price, but shall not exceed $3 million.

The Offeror is required to submit a complete Price Proposal Form that includes completion of all line-item numbers. All required proposal documents shall be submitted in accordance with FAR 15.208.

II. Basis of Evaluation:

The Government will evaluate price based on the total lump sum price. Analysis will be performed by one or more of the following tecniques to ensure a fair and reasonable price:

a. Comparison of proposed prices received in response to the RFP.

b. Comparison of the proposed prices with the Independent Government Cost Estimate

(IGCE).

c. Comparison of proposed prices with available historical information.

d. Comparison of market survey results.

Evaluation:

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the Offeror submitting the lowest price proposal.

2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

ATTACHMENTS:

ATTACHMENT A1: Specifications ATTACHMENT A2: Drawings ATTACHMENT A3: Further Instructions to Bidders ATTACHMENT A4: NS NPT Soil Management Plan ATTACHMENT A5: 5090.21B Soile Erosion and Sediment Control ATTACHMENT B: Wage Determination (included in General Requirements below) ATTACHMENT C: Pre-Proposal Inquiry (PPI) form ATTACHMENT D: B1171 Price Proposal Form ATTACHMENT E: PIEE Vendor Access Instructions ATTACHMENT F: Site Visit Map ATTACHMENT G: NUWC Visitor Request Information Guidelines ATTACHMENT H: SECNAV Form 5512-NSNPT ATTACHMENT I: Site Visit Instructions ATTACHMENT J: Base Access Email Template

Attachment A

Specifications and Drawings

See separately attached PDF Files labeled as follows:

Specifications:

Attachment A1 - B1171 Final Specifications

Drawings:

Attachment A2 - B1171 Final Drawings

Forms:

Attachment A3 – Further Instructions to Bidders Attachment A4 – NS NPT Soil Management Plan Attachment A5 – 5090.21B Soile Erosion and Sediment Control

Attachment B

Wage Determination

"General Decision Number: RI20250001 07/04/2025

Superseded General Decision Number: RI20240001

State: Rhode Island

Construction Types: Building, Heavy (Heavy and Marine) and Highway

Counties: Rhode Island Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE

CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 03/07/2025 2 03/14/2025 3 05/16/2025 4 06/13/2025 5 07/04/2025

ASBE0006-006 09/01/2024

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 49.91 36.63

ASBE0006-008 09/01/2024

Rates Fringes

Asbestos Worker/Insulator Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 49.91 36.63

BOIL0029-001 01/01/2025

Rates Fringes

BOILERMAKER......................$ 50.62 28.82

BRRI0003-001 06/01/2022

Rates Fringes

Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 46.86 29.14

BRRI0003-002 09/01/2022

Rates Fringes

Marble Setter, Terrazzo Worker & Tile Setter.............$ 46.54 30.34

BRRI0003-003 09/01/2022

Rates Fringes

Marble, Tile & Terrazzo Finisher.........................$ 38.78 29.61

* CARP0330‐001 06/02/2025

CARPENTER (Includes Soft Floor Layer).....................$ 47.88 30.50 Diver Tender.....................$ 48.68 30.50

DIVER............................$ 60.83 30.50

Piledriver.......................$ 41.53 29.35

WELDER...........................$ 48.68 30.50

FOOTNOTES:

When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.

Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.

Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.

The designated piledriver, known as the ""monkey"": $1.00 per hour additional.

CARP1121-002 01/06/2025

Rates Fringes

MILLWRIGHT.......................$ 45.72 31.50

ELEC0099-002 06/01/2024

* ELEC0099-002 06/01/2025

Rates Fringes

ELECTRICIAN......................$ 52.11 47.25%

Teledata System Installer........$ 42.09 11.57%+15.31

FOOTNOTES:

Work of a hazardous nature, or where the work height is 30

ft. or more from the floor, except when working OSHA-approved lifts: 20% per hour additional.

Work in tunnels below ground level in combined sewer outfall:

20% per hour additional.

ELEV0039-001 01/01/2025

ELEVATOR MECHANIC................$ 64.52 38.435+a+b

FOOTNOTES:

a. PAID HOLIDAYS: New Years Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

b. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.

* ENGI0057-001 07/01/2025

Rates Fringes

Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work)

GROUP 1.....................$ 50.30 29.70

GROUP 2.....................$ 48.30 29.70

GROUP 3.....................$ 43.92 29.70

GROUP 4.....................$ 41.07 29.70

GROUP 5.....................$ 47.35 29.70

GROUP 6.....................$ 38.15 29.70

GROUP 7.....................$ 32.15 29.70

GROUP 8.....................$ 44.00 29.70

GROUP 9.....................$ 47.92 29.70

a. BOOM LENGTHS, INCLUDING JIBS:

150 feet and over + $ 2.00 180 feet and over + $ 3.00 210 feet and over + $ 4.00 240 feet and over + $ 5.00 270 feet and over + $ 7.00 300 feet and over + $ 8.00 350 feet and over + $ 9.00 400 feet and over + $10.00

a. PAID HOLIDAYS:

New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTES:

Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks

GROUP 2: Digging machine, Ross Carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds.

and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.

GROUP 3: Oilers on cranes.

GROUP 4: Oiler on crawler backhoe.

GROUP 5: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).

GROUP 6: Well-point installation crew.

GROUP 7: Utility Engineers and Signal Persons

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.

GROUP 9: Boat & tug operator.

ENGI0057-003 06/01/2025

BUILDING CONSTRUCTION

Rates Fringes

Power Equipment Operator

GROUP 1....................$ 49.57 29.50

GROUP 2....................$ 47.57 29.50

GROUP 3....................$ 47.35 29.50

GROUP 4....................$ 43.35 29.50

GROUP 5....................$ 40.50 29.50

GROUP 6....................$ 46.65 29.50

GROUP 7....................$ 46.65 29.50

GROUP 8....................$ 43.54 29.50

a.BOOM LENTHS, INCLUDING JIBS:

150 ft. and over: + $ 2.00 180 ft. and over: + $ 3.00 210 ft. and over: + $ 4.00 240 ft. and over: + $ 5.00 270 ft. and over: + $ 7.00 300 ft. and over: + $ 8.00 350 ft. and over: + $ 9.00 400 ft. and over: + $10.00

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial

Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTE: Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks.

GROUP 2: Digging machine, Ross carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck

GROUP 3: Telehandler equipment, forklift, concrete pump & on-site concrete plant

GROUP 4: Fireman & oiler on cranes

GROUP 5: Oiler on crawler backhoe

GROUP 6: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)

GROUP 7: Well point installation crew

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor

ENGI0057-005 05/01/2025

Rates Fringes

Power Equipment Operator (highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water)

GROUP 1.....................$ 45.45 29.70

GROUP 2.....................$ 43.45 29.70

GROUP 3.....................$ 38.15 29.70

GROUP 4.....................$ 24.75 29.70

GROUP 5.....................$ 32.15 29.70

GROUP 6.....................$ 38.73 29.70

GROUP 7.....................$ 42.43 29.70

GROUP 8.....................$ 37.70 29.70

a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.

b. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Cranes, pile drivers, lighters, boom trucks, hoists, derricks

GROUP 2: Digging machines, excavators, locomotives, John Henry's, directional drilling machines, cold planers, reclaimers, pavers, spreaders, graders, front-end loaders (3yds & over), vacuum truck, drill/boring machine operators, vermeer saw, water blaster, hydraulic-demolition robot, Ross Carriers, concrete pump operators, asphalt/material transfer machines, rotating telehandlers, SPMT type equipment

GROUP 3: Wellpoint installation and drill/boring machine assistants

GROUP 4: Utility engineers

GROUP 5: Signal persons

GROUP 6: Oilers on cranes and deckhands

GROUP 7: Combination loader / backhoes, front-end loaders (less than 3 yds.), forklift, bulldozers, scrapers, boats, rollers, skid steer loaders (regardless of attachments), street sweepers, mechanics, welders, operators in materials yards, shops and garages

GROUP 8: Gas and electric drive heaters, concrete mixers, light plants, welding machines, pumps and compressors

IRON0037-001 03/16/2025

Rates Fringes

IRONWORKER.......................$ 42.58 32.98

LABO0271‐001 12/03/2023

BUILDING CONSTRUCTION

LABORER

GROUP 1.....................$ 37.00 26.90

GROUP 2.....................$ 37.00 26.90

GROUP 3.....................$ 37.00 26.90

GROUP 4.....................$ 37.00 26.90

GROUP 5.....................$ 39.00 26.90

LABORERS CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]

GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator

GROUP 3: Pre-Cast Floor & Roof Plank Erectors

GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster

GROUP 5: Toxic Waste Remover

LABORERS CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]

GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator

GROUP 3: Pre-Cast Floor & Roof Plank Erectors

GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster

GROUP 5: Toxic Waste Remover

LABO0271-002 11/27/2022

HEAVY AND HIGHWAY CONSTRUCTION

Rates Fringes

LABORER

COMPRESSED AIR

Group 1....................$ 55.40 24.15 Group 2....................$ 52.93 24.15 Group 3....................$ 42.45 24.15

FREE AIR

Group 1....................$ 46.00 24.15 Group 2....................$ 45.00 24.15 Group 3....................$ 42.45 24.15

LABORER

Group 1....................$ 33.05 24.05 Group 2....................$ 35.75 24.85 Group 3....................$ 36.50 24.85 Group 4....................$ 29.00 24.85 Group 5....................$ 37.50 24.85

OPEN AIR CAISSON,

UNDERPINNING WORK AND

BORING CREW

Bottom Man.................$ 41.50 24.15 Top Man & Laborer..........$ 35.60 24.15

TEST BORING

Driller....................$ 41.95 24.15 Laborer....................$ 41.95 24.15

LABORER CLASSIFICATIONS

GROUP 1: Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems];

Plant laborer; Driller in quarries

GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper;

Chain saw operators; Concrete and power buggy operator;

Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator;

Mechanical grinder operator; Mason tender; Mortar mixer;

Pneumatic tool operator; Riprap and dry stonewall builder;

Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator; Pipelayer; Pipe trench bracer

GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster

GROUP 4: Flagger & signaler

GROUP 5: Toxic waste remover

LABORER - COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air

GROUP 2: Change house attendant, powder watchperson, top person on iron

GROUP 3: Hazardous waste work within the ""HOT"" zone

LABORER - FREE AIR CLASSIFICATIONS

LABORER ‐ FREE AIR CLASSIFICATIONS

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator

GROUP 2: Change house attendant, powder watchperson

GROUP 3: Hazardous waste work within the ""HOT"" zone

LABORER CLASSIFICATIONS

GROUP 1: Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries

GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;

Pipelayer; Pipe trench bracer

GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster

GROUP 4: Flagger & signaler

GROUP 5: Toxic waste remover

LABORER - COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air

GROUP 2: Change house attendant, powder watchperson, top person on iron

GROUP 3: Hazardous waste work within the ""HOT"" zone

LABORER - FREE AIR CLASSIFICATIONS

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator

GROUP 2: Change house attendant, powder watchperson

GROUP 3: Hazardous waste work within the ""HOT"" zone

PAIN0011‐005 06/01/2024

PAINTER

Brush and Roller............$ 38.07 25.80 Epoxy, Tanks, Towers, Swing Stage & Structural Steel.......................$ 40.07 25.80 Spray, Sand & Water Blasting....................$ 41.07 25.80 Taper.......................$ 38.82 25.80 Wall Coverer................$ 38.57 25.80

PAIN0011-006 06/01/2024

Rates Fringes

GLAZIER..........................$ 41.63 26.15

FOOTNOTES:

SWING STAGE: $1.00 per hour additional.

PAID HOLIDAYS: Labor Day & Christmas Day.

PAIN0011-011 06/01/2024

Rates Fringes

Painter (Bridge Work)...........$ 57.85 26.40

PAIN0035-008 06/01/2011

Sign Painter.....................$ 24.79 13.72

PLAS0040-001 01/01/2025

BUILDING CONSTRUCTION

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 44.75 29.10

FOOTNOTE: Cement Mason: Work on free swinging scaffolds under 3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.

PLAS0040-002 01/01/2025

HEAVY AND HIGHWAY CONSTRUCTION

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 44.75 29.10

PLAS0040-003 01/01/2025

Rates Fringes

PLASTERER........................$ 45.52 29.43

PLUM0051-002 08/26/2024

Rates Fringes

Plumbers and Pipefitters.........$ 52.49 33.60

ROOF0033-004 12/01/2024

Rates Fringes

ROOFER...........................$ 45.77 31.01

SFRI0669‐001 01/01/2025

SPRINKLER FITTER.................$ 49.98 33.44

SHEE0017-002 12/01/2024

Sheet Metal Worker...............$ 43.69 41.14

TEAM0251-001 05/01/2025

HEAVY AND HIGHWAY CONSTRUCTION

Rates Fringes

TRUCK DRIVER

GROUP 1....................$ 31.86 34.51+a+b GROUP 2....................$ 32.01 34.51+a+b GROUP 3....................$ 32.06 34.51+a+b GROUP 4....................$ 32.11 34.51+a+b GROUP 5....................$ 32.21 34.51+a+b GROUP 6....................$ 32.61 34.51+a+b GROUP 7....................$ 32.81 34.51+a+b GROUP 8....................$ 32.31 34.51+a+b GROUP 9....................$ 32.56 34.51+a+b GROUP 10....................$ 32.36 34.51+a+b

FOOTNOTES:

A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, plus Presidents' Day, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.

B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.

C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars ($500.00)

All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Pick-up trucks, station wagons, & panel trucks

GROUP 2: Two-axle on low beds

GROUP 3: Two-axle dump truck

GROUP 4: Three-axle dump truck

GROUP 5: Four- and five-axle equipment

GROUP 6: Low-bed or boom trailer.

GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)

GROUP 8: Special earth-moving equipment, under 35 tons

GROUP 9: Special earth-moving equipment, 35 tons or over

GROUP 10: Tractor trailer

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

Attachment C

Pre-Proposal Inquiry (PPI) Form

ATTACHMENT C - Pre-Proposal Inquiry (PPI) form

Attachment D

Price Proposal Form

ATTACHMENT D – B1171 Price Proposal Form

Attachment E

PIEE Vendor Access Instructions

ATTACHMENT E – PIEE Vendor Access Instructions

Site Visit Attachments

ATTACHMENT F - B1171 Site Visit Map

ATTACHMENT G - NUWC Visitor Request Information Guidelines

ATTACHMENT H - SECNAV Form 5512-NSNPT

ATTACHMENT I - Site Visit Instructions

File details come from the government source that posted it. Updated .