Amend 0003 - PPI Spreadsheet.pdf
PDF 68 KB Posted
- Solicitation number
- N4008525R0099
About this file
This document is an Amendment 0003 PPI (Potential Pricing Issue) Spreadsheet for a Department of the Navy project at Naval Air Station Oceana in Virginia Beach. The spreadsheet contains 15 clarification questions and government responses related to a repair project for a 4" cast iron cross between the second and third floors of Building 536. Key clarifications include guidance on demolition of masonry shaft walls, preservation of existing concrete beams, light fixture replacements, floor and wall treatments, and confirmation of workspace availability. The government specified that the finished restrooms are not required to meet ADA or ABA requirements, both floors will be available for work simultaneously, and existing floor finishes in the vestibule should be protected. The solicitation (N4008525R0099) is restricted to contractors in MACC Group ID: ML-C00075, with a PPI cut-off date of 25 July 2025.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page Section Para. Dwg #
9 7of30 7. 7.2.1
Item #1 in section 7.2 of the RFP states to "Demolish and dispose existing masonry shaft wall and nib wall.". The drawings of the existing suggests that the bottom 16 inches or so of the current shaft wall is a concrete beam (section 12/S6). Does the government expect the concrete beam to be removed along with the "masonry shaft wall"?
Existing concrete beam to remain. Remove masonry above concrete beam to undersided of deck. Construct shaft wall on existing concrete beam to underside of deck.
10 7of30 7. 7.2.1 Please confirm the other 3 perimeter walls of the restroom are to remain.
Other three permiter walls to remain. Patch / repair existing walls for fresh coat of paint.
11 8of30 7. 7.3.13
Is the eggcrate grille to be layed into the new ceiling grill to allow access to the FCU? Please clarrify what the eggcrate grill is for.
Yes. Eggcrate grille to be layed out to allow access to FCU. There are many reasons to provide removable eggcrate grille.
Acoustical ceiling gets damaged during access to FCU, condensation damage, etc.
12 10of30 7. 7.12.2
The existing light fixtures in the drywall ceilings of the entry way is a can down-light. Is the new replacement fixture to the the same style but with an LED luminaire?
Yes, same style LED fixture is acceptable. 0003
13 7of30 7. 7.2.7
Item #7 in section 7.2 of the RFP states to remove the flooring and base in the vestibule to the bathrooms. However, we do not find a requirement for new flooring & base to be installed in the vestibule. What flooring is to be provided in this area?
Existing vestibule floor finish to remain.
Contractor to protect existing floor finish in vestibule.
Due to the limited space available within the restrooms, please confirm the finished restrooms are not required to meet ADA or ABA requirement.
Not required to meet ADA or ABA. 0003
Will the bathroom on both floors (2nd & 3rd) be available to us at one time or is a phase approach to completing the work expected?
Both floors will be available. 0003
Solicitation / RFP#: N4008525R0099 - PPI Cut Off Date: 25 July 2025
Amend No.
GOVERNMENT RESPONSE
PPI No.
REFERENCE
QUESTION
Project Title: Repair 4" Cast Iron Cross Between Second and Third Floor, Building 536, Naval Air Station Oceana, Virginia Beach, Virginia