This document is an Amendment (Amendment 0003) to a federal solicitation for the Naval Facilities Engineering Command. The amendment provides five key updates: (1) scheduling an additional site visit on Wednesday, 06 August 2025 at 1000 hours EDT at the FEAD conference room in JEB Little Creek-Fort Story, (2) providing two new points of contact (Brittany Swan and Nicole Fellers) for Pre-Proposal Information (PPI) submittals, (3) adding Attachment K - Drawings, (4) adding Attachment L - Site Visit Sign In form, and (5) changing the PPI due date from Tuesday, 5 August 2025 to Tuesday, 12 August 2025 at 1400 hours EDT. The overall proposal due date of 21 August 2025 at 1000 EDT remains unchanged. The solicitation (N4008525R0093) is for a utility systems SCADA integration project involving connecting existing pump stations, water towers, and substations with fiber or LTE RF systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0005.pdf | ||
| Attachment L - Specifications.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0001.pdf | ||
| Amendment_0002.pdf | ||
| Attachment K - Drawings.pdf | ||
| N4008525R0093_General Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
The purpose of this Amendment is to provide the following:
(1) Schedule additional site visit (2) Provide additional point of contact for PPI's (3) Provide Attachment K - Drawings
(4) Provide Attachment L - Site Visit Sign In (5) PPI Due Date Change
Proposal Due Date of 21 August 2025 @ 1000 EDT, remains unchanged.
NAVFACSYSCOM MID-ATLANTIC
PWD LITTLE CREEK
FACILITIES ENGINEERING & ACQ DIV
1450 GATOR BLVD SUITE 150
VIRGINIA BEACH VA 23459-8616
N4008525R0093
1 2
07/29/2025
07/21/2025
N4008525R0093
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
This amendment is issued for the following:
(1) Schedule Additional Site Visit:
- A Site Visit will be conducted Wednesday, 06 August 2025 at 1000 hours EDT. We will meet in the FEAD conference room, 1450 Gator Blvd, BLDG 3165, JEB Little Creek-Fort Story (Little Creek Site).
The site visit will be approximately 1000 – 1300.
(2) Provide Additional Point of Contact for PPI Submittals:
- When submitting your PPI template please ensure that you send them to, Brittany Swan, brittany.t.swan.civ@us.navy.mil AND Nicole Fellers, nicole.l.fellers.civ@us.navy.mil, please make the subject line of the e-mail “N4008525R0093 – PPI’s”.
(3) Provide Attachment K – Drawings.
(4) Provide Attachment L - Site Visit Sign In.
(5) PPI Due Date Change:
- The original PPI due date of Tuesday, 5 August 2025, is now changed to Tuesday, 12 August 2025 at 1400 hours EDT.