- Solicitation number
- N4008525R0007
About this file
This document is an Amendment (Amendment 0003) to a federal solicitation for the B-179 Deep Depth Test Facility Improvements Project at the Naval Undersea Warfare Center in Newport, Rhode Island. The amendment serves two primary purposes: (1) providing updated responses to pre-proposal inquiries and (2) providing an additional attachment (Attachment K - B-179 New Site Work Plans & Details C-4). The pre-proposal inquiry responses address specific technical details, including clarification about existing rail system support (8' long wooden ties likely treated with creosote) and a requirement for the contractor to replace all door hardware within the project's work area, as listed in the Door Schedule on Sheet [A-601].
The solicitation is specifically restricted to Multiple Award Construction Contract (MACC) holders under contract N4008521D0052-57, 0066, covering facilities in the North Area of Responsibility, which includes states from Connecticut to Vermont. The amendment is part of a Design-Bid-Build (DBB) project, with the contract point of contact being Jator de Leon, and the effective date of the amendment is 08/06/2025. Prospective contractors must acknowledge receipt of this amendment prior to the specified submission date and adhere to the updated technical specifications and requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
N4008525R0007
Section SF 30 – Block 14 continuation page (SF 30)
The following have been added by full text:
AMENDMENT 0003
This amendment is issued to incorporate the following:
1. Provide and update responses to Pre-Proposal Inquires
2. Provide Attachment K – B-179 New Site Work Plans & Details C-4 (attached separately)
1. Provide and update responses to Pre-Proposal Inquires
Reference Question Government Response Page Section Paragraph
As Boring B2 only indicated 6” of concrete, how is the current rail system supported and fastened? Do the rails fasten into any type of rail-tie system such as concrete or wood? If wooden, are the rail-ties creosote treated timber?
The rails are supported by 8' long 7" x 9" wooden ties at 15 1/2" O.C. Based on the age of the existing ties, it is likely that they are creosote-treated timber.
However, this has not been confirmed. Please see Attachment K – B179 New Site Work-Plans & Details provided with Amendment 0003.
9 A201 A201 indicates all existing hardware that does not work be replaced. Can a list be provided of what hardware does not work or should the contractor carry an allowance to cover the cost of this hardware.
Updated PPI Response - The Contractor is responsible for replacing all door hardware for all doors within the area of work for the contract. These doors are listed in the Door Schedule on Sheet [A- 601].
2. Provide Attachment K – B179 New Site Work Plans & Details C-4 (attached separately)
| 23R2656 Amendment 0001 |
| 23R2656 Amendment 0004 |
| Pages from 23R2541 Amendment 0003-2 |
Amendment 0001 continuation page
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0003 |
| Code[0]: N40085 |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: N40085-25-R-0007, Design-Bid-Build (DBB), B-179 Deep Depth Test Facility Improvements, Naval Undersea Warfare Center, Newport, Rhode Island |
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Jator de Leon, jator.v.deleon.civ@us.navy.mil
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: NAVFACYSCOM MID-ATLANTIC |
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511-3095
| NameandAddress[0]: |
| AdministeredBy[0]: See Item 6 |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: N4008525R0007 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 2 |
| EffectiveDate[0]: 08/06/2025 |
| Dated9B[0]: 06/18/2025 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: 1 |
File details come from the government source that posted it. Updated .