N4008525R0005: DESIGN-BID-BUILD (DBB), B-1246 VPM IMPROVEMENTS
Solicitation number
N4008525R0005
Issued by

About this file

This document is an Amendment (Number 0002) to a federal solicitation for Design-Bid-Build (DBB) improvements at the Naval Undersea Warfare Center in Newport, Rhode Island. The amendment extends the proposal due date from August 6, 2025 to August 19, 2025, and includes several key updates: additional attachments to the Request for Proposal (including Special Instruction Schedules, Borings, and Roof Warranty documents), responses to pre-proposal inquiries, and an updated Wage Determination.

The amendment addresses specific technical and logistical questions from potential contractors, including clarifications about utility provisions, roof warranties, fire alarm system modifications, lightning protection testing, and work area access. Notable details include the government providing reasonable utility amounts (such as a 20 amp 110V circuit), confirming existing roof warranty status, specifying requirements for fire alarm and electrical system modifications, and outlining work hour and staging expectations. The solicitation remains restricted to Multiple Award Construction Contract (MACC) holders for facilities in the north area of responsibility.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
B1246 SITE VISIT_Redacted.pdf PDF
Amendment 0001.pdf PDF
N4008525R0005 General Requirements.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N40085-25-R-0005

This amendment is issued to incorporate the following:

1. Extend the Proposal Due Date to 19 AUGUST 2025

2. Include additional attachments to the Request for Proposal (attached separately)

3. Provide responses to Pre-Proposal Inquiries (PPI)

4. Provide updated Wage Determination for #RI120250001

1. Extend the Proposal Due Date to 19 AUGUST 2025

The proposal due date has been extended from 06 AUGUST 2025 to 19 AUGUST 2025.

*Please note that no additional Pre-proposal Inquiries will be accepted.

2. Include additional attachments to the Request for Proposal (RFP).

All attachments have been attached separately and are referenced in the Pre-Proposal Inquiry

Government Response columns below.

Attachment M- Special Instruction Schedules

Attachment N- B1246 P-056 VPT Addition- Borings

Attachment O- NUWC B.1246 E-501 ADD 1

Attachment P- Mezzanine Roof Warranty

Attachment Q- Main Roofing System Description.

3. Provide Responses to Pre-Proposal Inquiries.

PPI# Page Section Paragraph Question Government Response

1 01 50 00 3.2.2.d Please confirm the government will furnish all necessary utilities needed to perform this project.

The government will provide reasonable amounts of utilities for this project only. For electricity, a 20 amp circuit of 110V will be available at the closest receptacle.

Unusual amounts (like powering a welding machine) will be the responsibility of the contractor.

2 07 53 23 Please confirm an existing roof warranty exists with the manufacturer or entity that carries the warranty for the roof. Provide a copy of the existing warranty.

The existing roof warranty for the main roof will have expired at the time of construction (See

Attachment Q- Main Roofing

System Description). The

Mezzanine Roof warranty is enforced until 11/25/33 (See

Attachment P- Mezzanine Roof

Warranty).

3 28 31 70 Please confirm the existing fire alarm system manufacturer. Please also confirm there is sufficient capacity in the existing system to add the devices this project is calling for. Please also confirm if we are to test the entire system or just our added devices.

Refer to FA001 diagram A3.

Existing fire alarm system is conventional Simplex 2001-8001

(serial no. T11046TD). New addressable FACU will be required for the equipment added in this project, and new fire alarm signal transmitter will be required for the signal transmission from the new panel. Connection between the existing fire alarm system and new fire alarm system will be for initiation of notification appliances throughout the building upon activation of either panel and for configuration of panel interface such that the system reset function of either panel can be accomplished without reactivation from the system that remains in alarm. A simultaneous reset of both systems is not acceptable. Contractor is responsible for system components in order to provide these functions. If a spare circuit is required on the existing fire alarm system, two of the existing initiating device circuits can be combined. Testing is required in order to ensure acceptance of the new system and functionality and re-acceptance testing for the existing system components in accordance with NFPA 72.

4 26 41 00 Please confirm if we are to test the entire lighting protection system or just our extension of the existing system.

Test the entire lightning protection system after extension to building addition.

5 The plans call for both an acoustic ceiling and a cable tray in the new control room.

Please confirm this and if the cable tray is to be above or below the ceiling.

See keyed note 1 on E-103. Cable tray is to be installed below the raised floor and extend down at the cable access panel locations.

Cable tray will continue to

Ground Level near Lab Space 1-

8.

6 A402 Note 6 Note 6 indicates FFE to be

GFCI. Please provide a list of the FFE the contractor is to install.

Response will be provided on a forthcoming amendment

7 A102/ A601 Please confirm if the stairwell is to receive an acoustic drop ceiling or gypsum drywall ceiling at the

2nd floor.

The stairwell ceiling is gypsum wallboard, see A-102 and A2/A-

501.

8 S202/ S203 Welding/steel work is shown on the backside of the steel up against the exterior metal panel system. Is it anticipated that some of the exterior metal panel system will require removal to properly access the backside of the building steel?

Panels and some CFS soffit framing will likely need to be removed above the flask room for welding work related to the beam reinforcing. See notes on SD-101

& AD-101. Panel removal is not anticipated to be needed for vertical bracing upgrades.

9 01 50 00 Will access be made to the contractors to bring steel through the building and hoist up to the mezzanine?

Contractor will be allowed to hoist. After the stair tower is constructed, it will be the preferred route for bringing material up to the mezzanine.

10 Will the large roof hatch above the multi-story open space be made available to the contractor for hoisting steel members into the building?

Government will open and close the hatch upon request. This will happen on a limited basis and scheduled at least a week in advance.

11 Will the existing overhead crane in the high bay area be made available to the contractor for hoisting efforts?

No.

12 Is there a schedule for the work of the government in the high bay area or will the government not work below when the contractors are working overhead on the mezzanine(s)?

Depending on what the government needs to do in this area, there may be short periods of time when the contractor will not be able to work. This will be scheduled well in advance so the contractor’s efforts can be coordinated.

13 Can the government provide loading criteria of the roof and mezzanine for the contractor to utilize in determining means and methods of bringing steel into the building and for

Mezzanine live load capacity is at least 50 PSF. Roof traffic will be for personnel only with material transport limited to what one person can carry (~50 pounds).

hoisting and erecting the steel?

14 8 01 11 00 1.3 "Before work is started, arrange with the Contracting

Officer a sequence of procedures, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways." Who is responsible for moving the materials and equipment?

Does the contractor need to provide storage for the materials and equipment?

Contractors will have an area to be used to support their work.

Contractors will be responsible for the safety and security of their materials during the project.

15 9 01 11 00 1.7 Can the government provide a list of salvaged items to remain the property of the government?

Salvaged items are indicated on the drawings (AD101) and includes freestanding guardrail system and soffit panels under the mezzanine. Coordinate items designated by the Contracting

Officer to be salvaged in accordance with 1.7 of

Specification Section 01 11 00.

16 11 01 14 00 1.2 The adjacent occupied spaces contain testing environments that require low-ambient noise to perform their operations. Will off-hour work be required for the majority of the construction activities?

Tests are scheduled well in advance and will be provided to the contractor. Testing does not occur 24/7 so most of the time, construction noise will not be a factor.

17 15 01 14 00 1.5 Are there any "FAD" badge restrictions? Can a contractor that has the "FAD" badge be able to escort a certain number of subcontractors?

Response will be provided on a forthcoming amendment

18 Can you please provide the sign in sheet from the site walk?

This Site Visit sheet was included in Amendment 1 on 7/2/24.

19 Photos were not allowed during the site walk. Can the government please provide photos of the existing building and ground area for the site work?

Response will be provided on a forthcoming amendment

20 Can the government please provide the boring test results of the soil conditions?

Boring results from previous project are provided for reference in Attachment N- B 1246 P-056

VPT Addition- Borings.

21 Can the Government provide photos of the work Area?

Response will be provided on a forthcoming amendment

22 01 50 00 Will contractors be allowed to place a 40’ Storage box on site for light fixtures that need to be removed and stored? Or will a storage area be assigned within B1246 for storing light fixtures?

Storage area will be available during construction, refer to G-

101 for approximate area which will be confirmed at the preconstruction meeting.

23 01 14 00 Please confirm the work hours for this project.

Refer to 01 14 00 para 1.3.2 for the work hours.

24 E-102 Note 14 &

Please provide more information about the existing lighting control switches at Mezzanine 300.

Keyed notes 14 and 15 on drawing E-102 refer to connecting new lights to the existing switches.

Existing flood lights and strip lights in Mezzanine 300 are controlled via two 3-way toggle switch for each fixture type. The first switches are located at the ground floor, near the door entering Lab Space 1-8, between column C-4 and C.8-4 on E-101;

and the other switches are located at the ground floor, near the door entering the Flask Room, between column A-6 and A-6.7 on E-101.

E-102 Note13

Please provide the additional accessories for the

NEMA 1

nonmetallic enclosure as mentioned in keyed note 13 on drawing E-102 ?

Provide the following:

(1) Mushroom style emergency stop switch,

(2) Green colored push buttons

(2) Red colored push buttons

(5) Red LED Indicator Lights

Additionally, provide (2) 3/4"

Conduits from enclosure to below raised floor and (1) 3/4" conduit to the Hydraulic Pump in the

Flask Room on the Ground floor.

E-102 Note5

Please provide a specification for the amber strobe warning light mentioned in keyed note 5 on

E-102 ?

Provide amber LED strobe light with 360 degrees beam angle, flash rate of 65 flashes per minute, polycarbonate lens, 6" round cast base to function as junction box with hole for conduit, 120VAC operating voltage.

E-501 Detail B1

Detail B1 on drawing E-501 seems inaccurate. Can an accurate representation of the

Please see Attachment O- NUWC

B1246 E-501 ADD 1 for a representation of the warning light system diagram.

warning light system diagram be provided?

Can the Government provide a wiring diagram for the Area of Refuge System?

Refer to schematic diagram D3 on FA001 of the emergency communication system. Wiring diagram will be dependent on the selected system make/model.

System is covered in specification

28.31.70.

Can the Government provide a floor plan showing the location of office room 101 in relation to the Flask

Room?

The location of Office 110 in relation to the Flask Room can be seen on the key plan on E-101.

Keynotes 1 through 4 on

Drawing E-103 indicates to coordinate the final destinations with NUWC.

Can the final destinations be provided?

Keyed Note 1: Provide cable trays to ground floor level, Lab

Space 1-8.

Keyed Note 2,3: Provide 1" conduits and junction boxes to

Electrical/Telecom Room 203 on the second floor for each system.

Approximate distance of 220 feet from Control Room 301.

Keyed Note 4: Provide a 2" conduit and junction boxes to

Electrical/Telecom Room 203 on the second floor for all data cables. Approximate distance of

220 feet from Control Room 301.

S507

Please clarify the staging requirements and any protection measures required

(C1, C3, A1, A3/S507).

This is means and method by the contractor. Requirements should meet the more stringent of local, Navy, and OSHA standards for fall protection. KTR might consider installation of new walkway framing along line 6.7 prior to bracing repair work to allow for staging support.

S507

Please clarify weld types, sizes, and any special requirements for x-bracing

All weld types, sizes, and special requirements for bracing repairs can be found in the notes and schedules on S-507, referenced on S-202, S-203, & S-507, and detailed on S-506.

S504

Please clarify specific locations where reinforcing planks are to be installed.

Detail C4

This detail is not for new planks;

it is for welding to reinforce existing planks. Weld note on

Detail C4 indicates all existing planks should be welded at plank ends, and under any CFS framing where the planks are not indicated to be removed. CFS framing locations should be coordinated on S-102 & S-301.

S504

Please confirm the required type and finish of the diamond plate. The specs do not indicate as well.

Diamond plate should be as required per 05 50 13 -

MISCELLANEOUS METAL

FABRICATIONS section 2.1.5

Floor Plates, Patterned (ASTM

A786). Finishes should be coordinated with architectural drawings, see finish schedule on

A-601.

S507

Please clarify how the 2"

18gage flat strap should be attached welded, screwed or bolted? Please provide fastening pattern as well.

No 2" 18 ga. flat strap indicated on S-507. On S-102 flat strap fastening is indicated in the legend but will ultimately be approved as part of the delegated

CFS design package.

01 45 35

Specification section 01 45

35 paragraph 1.2 indicates to refer to the attached Schedule of Special Inspections included as an attachment.

When referring to the attachment, in caps it indicates that "ALL OF

PORTIONS OF THIS

SECTION ARE

APPLICABLE IF BOX IS

CHECKED." The only box checked is for fire protection and none of the structural steel special inspection boxes are checked. Not sure if this is an oversight as the structural steel scope on this project is crucial.

See updated schedule of special inspections Attachment M-

Schedule of Special Inspections.

4. Provide updated Wage Determination below.

"General Decision Number: RI20250001 07/25/2025

Superseded General Decision Number: RI20240001

State: Rhode Island

Construction Types: Building, Heavy (Heavy and Marine) and

Highway

Counties: Rhode Island Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE

CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 |

|into on or after January 30, | generally applies to the |

|2022, or the contract is | contract. |

|renewed or extended (e.g., an |. The contractor must pay |

|option is exercised) on or | all covered workers at |

|after January 30, 2022: | least $17.75 per hour (or |

| | the applicable wage rate |

| | listed on this wage |

| | determination, if it is |

| | higher) for all hours |

| | spent performing on the |

| | contract in 2025. |

|If the contract was awarded on|. Executive Order 13658 |

|or between January 1, 2015 and| generally applies to the |

|January 29, 2022, and the | contract. |

|contract is not renewed or |. The contractor must pay all|

|extended on or after January | covered workers at least |

|30, 2022: | $13.30 per hour (or the |

| | applicable wage rate listed|

| | on this wage determination,|

| | if it is higher) for all |

| | hours spent performing on |

| | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the

Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2025

1 03/07/2025

2 03/14/2025

3 05/16/2025

4 06/13/2025

5 07/04/2025

6 07/25/2025

ASBE0006-006 09/01/2024

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 49.91 36.63

ASBE0006-008 09/01/2024

Asbestos Worker/Insulator

Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 49.91 36.63

BOIL0029-001 01/01/2025

BOILERMAKER......................$ 50.62 28.82

BRRI0003-001 06/01/2022

Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 46.86 29.14

BRRI0003-002 09/01/2022

Marble Setter, Terrazzo

Worker & Tile Setter.............$ 46.54 30.34

BRRI0003-003 09/01/2022

Marble, Tile & Terrazzo

Finisher.........................$ 38.78 29.61

CARP0330-001 06/02/2025

CARPENTER (Includes Soft

Floor Layer).....................$ 47.88 30.50

Diver Tender.....................$ 48.68 30.50

DIVER............................$ 60.83 30.50

Piledriver.......................$ 41.53 29.35

WELDER...........................$ 48.68 30.50

FOOTNOTES:

When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.

Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.

Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.

The designated piledriver, known as the ""monkey"": $1.00 per hour additional.

CARP1121-002 01/06/2025

MILLWRIGHT.......................$ 45.72 31.50

* ELEC0099-002 06/01/2025

ELECTRICIAN......................$ 56.11 44.10%

Teledata System Installer........$ 42.09 10.45%+15.31

Work of a hazardous nature, or where the work height is 30

ft. or more from the floor, except when working

OSHA-approved lifts: 20% per hour additional.

Work in tunnels below ground level in combined sewer outfall:

20% per hour additional.

ELEV0039-001 01/01/2025

ELEVATOR MECHANIC................$ 64.52 38.435+a+b

a. PAID HOLIDAYS: New Years Day; Memorial Day; Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

b. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.

* ENGI0057-001 06/01/2025

Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work)

GROUP 1.....................$ 50.30 29.70

GROUP 2.....................$ 48.30 29.70

GROUP 3.....................$ 43.92 29.70

GROUP 4.....................$ 41.07 29.70

GROUP 5.....................$ 47.35 29.70

GROUP 6.....................$ 38.15 29.70

GROUP 7.....................$ 32.15 29.70

GROUP 8.....................$ 44.00 29.70

GROUP 9.....................$ 47.92 29.70

a. BOOM LENGTHS, INCLUDING JIBS:

150 feet and over + $ 2.00

180 feet and over + $ 3.00

210 feet and over + $ 4.00

240 feet and over + $ 5.00

270 feet and over + $ 7.00

300 feet and over + $ 8.00

350 feet and over + $ 9.00

400 feet and over + $10.00

a. PAID HOLIDAYS:

New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works

3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTES:

Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks

GROUP 2: Digging machine, Ross Carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds.

and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.

GROUP 3: Oilers on cranes.

GROUP 4: Oiler on crawler backhoe.

GROUP 5: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).

GROUP 6: Well-point installation crew.

GROUP 7: Utility Engineers and Signal Persons

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.

GROUP 9: Boat & tug operator.

ENGI0057-003 06/01/2025

BUILDING CONSTRUCTION

Power Equipment Operator

GROUP 1....................$ 49.57 29.50

GROUP 2....................$ 47.57 29.50

GROUP 3....................$ 47.35 29.50

GROUP 4....................$ 43.35 29.50

GROUP 5....................$ 40.50 29.50

GROUP 6....................$ 46.65 29.50

GROUP 7....................$ 46.65 29.50

GROUP 8....................$ 43.54 29.50

a.BOOM LENTHS, INCLUDING JIBS:

150 ft. and over: + $ 2.00

180 ft. and over: + $ 3.00

210 ft. and over: + $ 4.00

240 ft. and over: + $ 5.00

270 ft. and over: + $ 7.00

300 ft. and over: + $ 8.00

350 ft. and over: + $ 9.00

400 ft. and over: + $10.00

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial

Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTE: Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks.

GROUP 2: Digging machine, Ross carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck

GROUP 3: Telehandler equipment, forklift, concrete pump & on-site concrete plant

GROUP 4: Fireman & oiler on cranes

GROUP 5: Oiler on crawler backhoe

GROUP 6: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)

GROUP 7: Well point installation crew

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor

ENGI0057-005 05/01/2025

Power Equipment Operator

(highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water)

GROUP 1.....................$ 45.45 29.70

GROUP 2.....................$ 43.45 29.70

GROUP 3.....................$ 38.15 29.70

GROUP 4.....................$ 24.75 29.70

GROUP 5.....................$ 32.15 29.70

GROUP 6.....................$ 38.73 29.70

GROUP 7.....................$ 42.43 29.70

GROUP 8.....................$ 37.70 29.70

a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.

b. PAID HOLIDAYS: New Year's Day, President's Day, Memorial

Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Cranes, pile drivers, lighters, boom trucks, hoists, derricks

GROUP 2: Digging machines, excavators, locomotives, John

Henry's, directional drilling machines, cold planers, reclaimers, pavers, spreaders, graders, front-end loaders

(3yds & over), vacuum truck, drill/boring machine operators, vermeer saw, water blaster, hydraulic-demolition robot, Ross Carriers, concrete pump operators, asphalt/material transfer machines, rotating telehandlers, SPMT type equipment

GROUP 3: Wellpoint installation and drill/boring machine assistants

GROUP 4: Utility engineers

GROUP 5: Signal persons

GROUP 6: Oilers on cranes and deckhands

GROUP 7: Combination loader / backhoes, front-end loaders

(less than 3 yds.), forklift, bulldozers, scrapers, boats, rollers, skid steer loaders (regardless of attachments), street sweepers, mechanics, welders, operators in materials yards, shops and garages

GROUP 8: Gas and electric drive heaters, concrete mixers, light plants, welding machines, pumps and compressors

IRON0037-001 03/16/2025

IRONWORKER.......................$ 42.58 32.98

LABO0271-001 12/03/2023

LABORER

GROUP 1.....................$ 37.00 26.90

GROUP 2.....................$ 37.00 26.90

GROUP 3.....................$ 37.00 26.90

GROUP 4.....................$ 37.00 26.90

GROUP 5.....................$ 39.00 26.90

LABORERS CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement

Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos

Removal [Non-Mechanical Systems]

GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail

Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone

Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree

Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator

GROUP 3: Pre-Cast Floor & Roof Plank Erectors

GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered

Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster

GROUP 5: Toxic Waste Remover

LABORERS CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement

Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]

GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail

Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone

Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder

Operator

GROUP 3: Pre-Cast Floor & Roof Plank Erectors

GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered

Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster

GROUP 5: Toxic Waste Remover

LABO0271-002 11/27/2022

HEAVY AND HIGHWAY CONSTRUCTION

LABORER

COMPRESSED AIR

Group 1....................$ 55.40 24.15

Group 2....................$ 52.93 24.15

Group 3....................$ 42.45 24.15

FREE AIR

Group 1....................$ 46.00 24.15

Group 2....................$ 45.00 24.15

Group 3....................$ 42.45 24.15

LABORER

Group 1....................$ 33.05 24.05

Group 2....................$ 35.75 24.85

Group 3....................$ 36.50 24.85

Group 4....................$ 29.00 24.85

Group 5....................$ 37.50 24.85

OPEN AIR CAISSON,

UNDERPINNING WORK AND

BORING CREW

Bottom Man.................$ 41.50 24.15

Top Man & Laborer..........$ 35.60 24.15

TEST BORING

Driller....................$ 41.95 24.15

Laborer....................$ 41.95 24.15

LABORER CLASSIFICATIONS

GROUP 1: Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems];

Plant laborer; Driller in quarries

GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper;

Chain saw operators; Concrete and power buggy operator;

Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator;

Mechanical grinder operator; Mason tender; Mortar mixer;

Pneumatic tool operator; Riprap and dry stonewall builder;

Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator; Pipelayer; Pipe trench bracer

GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster

GROUP 4: Flagger & signaler

GROUP 5: Toxic waste remover

LABORER - COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air

GROUP 2: Change house attendant, powder watchperson, top person on iron

GROUP 3: Hazardous waste work within the ""HOT"" zone

LABORER - FREE AIR CLASSIFICATIONS

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator

GROUP 2: Change house attendant, powder watchperson

LABORER CLASSIFICATIONS

GROUP 1: Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries

GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;

Pipelayer; Pipe trench bracer

GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster

GROUP 4: Flagger & signaler

GROUP 5: Toxic waste remover

LABORER - COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air

GROUP 2: Change house attendant, powder watchperson, top person on iron

LABORER - FREE AIR CLASSIFICATIONS

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator

GROUP 2: Change house attendant, powder watchperson

PAIN0011-005 06/01/2024

PAINTER

Brush and Roller............$ 38.07 25.80

Epoxy, Tanks, Towers, Swing Stage & Structural

Steel.......................$ 40.07 25.80

Spray, Sand & Water

Blasting....................$ 41.07 25.80

Taper.......................$ 38.82 25.80

Wall Coverer................$ 38.57 25.80

PAIN0011-006 06/01/2024

GLAZIER..........................$ 41.63 26.15

SWING STAGE: $1.00 per hour additional.

PAID HOLIDAYS: Labor Day & Christmas Day.

PAIN0011-011 06/01/2024

Painter (Bridge Work)...........$ 57.85 26.40

PAIN0035-008 06/01/2011

Sign Painter.....................$ 24.79 13.72

PLAS0040-001 01/01/2025

CEMENT MASON/CONCRETE FINISHER...$ 44.75 29.10

FOOTNOTE: Cement Mason: Work on free swinging scaffolds under

3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.

PLAS0040-002 01/01/2025

CEMENT MASON/CONCRETE FINISHER...$ 44.75 29.10

PLAS0040-003 01/01/2025

PLASTERER........................$ 45.52 29.43

PLUM0051-002 08/26/2024

Plumbers and Pipefitters.........$ 52.49 33.60

* ROOF0033-004 06/01/2025

ROOFER...........................$ 46.49 31.44

SFRI0669-001 01/01/2025

SPRINKLER FITTER.................$ 49.98 33.44

SHEE0017-002 12/01/2024

Sheet Metal Worker...............$ 43.69 41.14

TEAM0251-001 05/01/2025

TRUCK DRIVER

GROUP 1....................$ 31.86 34.51+a+b

GROUP 2....................$ 32.01 34.51+a+b

GROUP 3....................$ 32.06 34.51+a+b

GROUP 4....................$ 32.11 34.51+a+b

GROUP 5....................$ 32.21 34.51+a+b

GROUP 6....................$ 32.61 34.51+a+b

GROUP 7....................$ 32.81 34.51+a+b

GROUP 8....................$ 32.31 34.51+a+b

GROUP 9....................$ 32.56 34.51+a+b

GROUP 10....................$ 32.36 34.51+a+b

A. Paid Holidays: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day and Christmas Day, plus

Presidents' Day, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.

B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.

C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars

($500.00)

All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Pick-up trucks, station wagons, & panel trucks

GROUP 2: Two-axle on low beds

GROUP 3: Two-axle dump truck

GROUP 4: Three-axle dump truck

GROUP 5: Four- and five-axle equipment

GROUP 6: Low-bed or boom trailer.

GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)

GROUP 8: Special earth-moving equipment, under 35 tons

GROUP 9: Special earth-moving equipment, 35 tons or over

GROUP 10: Tractor trailer

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than

""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007

6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007

01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

Washington, DC 20210.

END OF GENERAL DECISION"

23R2656 Amendment 0001
23R2656 Amendment 0004
Pages from 23R2541 Amendment 0003-2

Amendment 0001 continuation page

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0002
Code[0]: N40085
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: N40085-25-R-0005, Design-Bid-Build (DBB), B-1246 VPM Improvements, Naval Undersea Warfare Center, Newport, Rhode Island

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Shayna Eichner, shayna.t.eichner.civ@us.navy.mil

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NAVFACYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511-3095

NameandAddress[0]:
AdministeredBy[0]: See Item 6
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: N4008525R0005
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 25
EffectiveDate[0]: 08/04/2025
Dated9B[0]: 06/18/2025
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: 1
NotExtended[0]: Off
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]: 1