24R2754 Amendment 0004.pdf
PDF 208 KB Posted
- Attached to
- Demolition and Repair of Exterior Main Entrance to Stairway at Hopper Hall, Building 127, Dam Neck Annex
- Solicitation number
- N4008524R2754
About this file
This document is an Amendment to Solicitation N40085-24-R-2754 for the Demolition and Repair of Exterior Main Entrance to Stairway at Hopper Hall, Building 127, Dam Neck Annex, Virginia Beach, Virginia.
The key details are:
- The proposal due date has been extended from 5 August 2024 to 8 August 2024 at 2:00 PM EDT.
- Liquidated damages of $346.34 per calendar day will be assessed if the work is not completed on time.
- Revisions have been made to the specifications and drawings, including updates to the stainless steel railing system requirements.
- This solicitation is only open to MACC Group ID: ML-C00075 contract holders.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
06-Aug-2024
4. REQUISITION/PURCHASE REQ. NO.
ACQR 6028885
5. PROJECT NO.(If applicable)
6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than item 6) CODE
NAVFAC MID ATLANTIC
PWD OCEANA
FACILITIES ENGINEERING & ACQ DIV
953 HORNET DR SUITE 213
VIRGINIA BEACH VA 23460-2190
See Item 6
8. NAME AND ADDRESS OF CONT RACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
N40085-24-R-2754
X 9B. DATED (SEE ITEM 11)
01-Jul-2024
10A. MOD. OF CONT RACT /ORDER NO.
10B. DAT ED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.
IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION N40085-24-R-2754, DEMOLITION AND REPAIR OF EXTERIOR MAIN ENTRANCE TO STAIRWAY AT HOPPER HALL, BUILDING 127, DAM NECK ANNEX, VIRGINIA BEACH, VIRGINIA.
The Receipt of Proposal due date is hereby extended to 08 August 2024 at 2:00 PM EDT.
Price Submission must be completely submitted per the instructions in the Request for Proposal N4008524R2754, including all amendments. Offerors proposal must be valid for 120 calendar days after submission. Please use the original Price Schedule form. Previously submitted proposals will not be evaluated.
SEE CONTINUATION PAGE(S).
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNIT ED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
06-Aug-2024
EXCEPTION TO SF 30
30-105-04
STANDARD FORM 30 (Rev. 10-83) APPROVED BY OIRM 11-84 Prescribed by GSA
FAR (48 CFR) 53.243
N40085-24-R-2754
The following have been added by full text:
AMENDMENT 0004
SOLICITATION N40085-24-R-2754, DEMOLITION AND REPAIR OF EXTERIOR MAIN ENTRANCE TO
STAIRWAY AT HOPPER HALL, BUILDING 127, DAM NECK ANNEX, VIRGINIA BEACH, VIRGINIA.
The purpose of this amendment is to:
1. Extend the proposal due date.
2. Update liquidated damages.
3. Incorporate revised specifications.
4. Incorporate revised drawings, attached separately as, “BLDG0127-1799923-AE501_REV1”.
Continuation Sheet:
1. Extend the proposal due date:
a. FROM: 05 August 2024 at 2:00 PM
b. TO: 08 August 2024 at 2:00 PM
2. Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $346.34 for each calendar day of delay until the work is completed or accepted.
3. Revised Specifications:
1. Specification Section: 05 73 1.5 - SD-03 Product Data; G Horizontal multiline infill panels.
Revise as following:
Horizontal ½” diameter ss infill panels.
2. Specification Section: 05 73 2.1 (PART 2 – PRODUCTS) SYSTEM DESCRIPTION Stainless Steel Decorative Stainless Steel Multiline (Rod) Railings.
Revise as following:
Stainless Steel Decorative Railings.
3. Specification Section: 05 73 2.3 STAINLESS STEEL DECORATIVE METAL RAILING Horizontal Multiline Infill Panels: 1/2 –inch (38mm) round stainless steel tubing rods.
Revise as following:
Horizontal Infill Panels: 1/2 – inch (38mm) round stainless steel tubing rods.
4. Drawing AE 501 DETAIL C4:
Note: SS MULTILINE RAILING SYSTEM
Revise as following:
Note: SS RAILING SYSTEM
5. Drawing AE 501 DETAIL B4:
Note: SS ROD MULTILINE RAILING SYSTEM
Revise as following:
N40085-24-R-2754
Note: SS TUBULAR ROD RAILING SYSTEM
(End of Summary of Changes)
File details come from the government source that posted it. Updated .