This document appears to be a set of Pre-Proposal Inquiry (PPI) submissions related to a federal contract opportunity. The contract opportunity is for the A-58 Replace Roof and Repair Interior project at Naval Station Norfolk in Norfolk, Virginia. The project requires the contractor to provide supervision, labor, material, and equipment to replace the existing roofing, perform mold remediation, and make interior repairs to building A-58.

The PPI submissions include questions about the subflooring and floor joists that need to be replaced, as well as clarification on the proposal due date, which was initially listed as July 31, 2024 but was extended to August 2, 2024 per Amendment 3. The opportunity is limited to 8(a) Multiple Award Construction Contract (MACC) contractors primarily in the Hampton Roads area of Virginia under specific NAVFAC contract numbers. No further details about the pricing, set-asides, or other contract terms are provided in this document.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPI Submission Form

Pre-Proposal Inquiry Submission Form N4008522R2746 A-58 Replace Roof and Repair Interior
PPI #
Date SubmittedLEAVE BLANKReferenceQuestionResponse
Page
SectionParagraph
707/30/24CLIN 0001AD of the price proposal form asks for unit pricing for subflooring replacement. What material is the subflooring that needs to be replaced?Concrete, see Design Revision #02
807/30/24CLIN 0001AE of the price proposal form asks for unit pricing for replacement of floor joists. What are the dimensions of the floor joists that need to be replaced?See Design Revision #02
907/30/24Sam.gov lists the proposal due date for this project as July 31, 2024, however Amendment 1 lists the proposal due date as 8/1/24. Which date is accurate?The proposal due date should have been 01 August 2024. However, Amendment 3 extends the proposal due date to 02 August 2024.