This document is a solicitation for an Indefinite Delivery, Indefinite Quantity (IDIQ) Design-Bid/Design-Bid-Build (DB/DBB) Multiple Award Construction Contract (MACC) for utility mechanical construction in the Hampton Roads, Virginia area. The solicitation is for a task order to Repair Fire Protection Systems at CAD-1, Naval Weapons Station Yorktown, VA. The estimated price range is between $3,000,000 and $4,000,000, with a 400 calendar day period of performance. The solicitation is restricted to six existing MACC holders. It includes detailed specifications, drawings, and a Statement of Work. Proposal submission requirements and evaluation factors are provided, with award to be made on a low price basis. Key dates include a site visit on June 12, 2024, Pre-Proposal Inquiries due by July 3, 2024, and proposals due by July 31, 2024.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC

FEAD PWD YORKTOWN, BLDG 16

Naval Weapons Station Yorktown, Yorktown, VA 23691

POC: LeAnne Gerehart, leanne.n.gerehart.civ@us.navy.mil

Maurice Muse, maurice.n.muse.civ@us.navy.mil

INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) DESIGN-BID/DESIGN-

BID-BUILD (DB/DBB) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)

FOR UTILITY MECHANICAL CONSTRUCTION, PRIMARILY IN THE HAMPTON

ROADS, VIRGINIA AREA OF RESPONSIBILITY (AOR), VIRGINIA

MACC GROUP ID: ML-C00077

PROPOSED TASK ORDER:

Repair Fire Protection Systems at CAD-1, Naval Weapons Station Yorktown, VA

DATE OF SOLICITATION: 28 MAY 2024

UTILITY MECHANICAL CONSTRUCTION FOR HR MACC CONTRACT HOLDERS

ONLY THE FOLLOWING CONTRACTORS CAN SUBMIT A PROPOSAL:

N4008523D0043

MIG GOV

545 S. Birdneck Rd. STE 202H

Virginia Beach, VA 23451

POC: Jose Gutierrez

Email: estimating@miggov.com;

jose.g@miggov.com

N4008523D0044

CCI Group, LLC

29 Bowdoin Street

Manchester, ME 04351

POC: John Morrison

Email: dmorrison@cci-alliance.com, dwarrelmannil@bbch-llc.com, cshelton@bbch-llc.com

N4008523D0045

Etolin Strait Associates 7440 Central Business PK Dr. SW 104

Norfolk, VA 23513

POC: Jaime Vanek

Email:jvanek@etolinstrait.com

N4008523D0046

Goshawk, LLC 211 N Loop 1604 E Suite 150

San Antonio, TX 78232

POC: Brandon Mann

Email: Brandon.mann@tepa.com goshawkmidlantmech@tepa.com mailto:leanne.n.gerehart.civ@us.navy.mil mailto:maurice.n.muse.civ@us.navy.mil mailto:estimating@miggov.com mailto:jose.g@miggov.com mailto:dmorrison@cci-alliance.com mailto:dwarrelmannil@bbch-llc.com mailto:dwarrelmannil@bbch-llc.com mailto:jvanek@etolinstrait.com mailto:Brandon.mann@tepa.com mailto:goshawkmidlantmech@tepa.com

N4008523D0047

Ocean Construction Services

104 Aragona Blvd, Ste 101

Virginia Beach, VA 23462

POC: Thor Elmore

Email: Thor.elmore@ocsinc.us; bids@ocsinc.us

N4008523D0048

TyBe-Garney Federal JV, LLC

1715 Templeton Loop

Newbern, TN 38059 POC: Jay McQuillen Jr. Partner

Email:jmcquillen@garney.com, tybe_garney_federal_jv@garney.com

GENERAL REQUIREMENTS

All terms and conditions of N40085-23-D-0043/0044/0045/0046/0047/0048 Indefinite Delivery Quantity

Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issues, please contact the POC.

Amendments will be posted directly to https://sam.gov/ under Contract Opportunities.

NAVFAC Solicitation No.: N4008524R2693

NAVFAC Specification/Drawings: Work Order No. 1757317 (Attachments A & B)

Title: Repair Fire Protection Systems at CAD-1

Location of the Work: Naval Weapons Station Yorktown, Yorktown, VA

Description of the Work:

The contractor shall provide supervision, labor, material and equipment required to perform all work for the following project: CAD 1 REPAIR FIRE PROTECTION SYSTEMS.

Many of the inert warehouses at Yorktown and Cheatham Annex were built in the 1940’s, and the fire protection systems are dated. They have been a source of continuing maintenance problems. The buildings included in a study performed by the AE firm GHD are grouped by similar style and construction, those being Yorktown Buildings 479-485, CAD 1-10, CAD 11-16, and CAD 30. In addition, the AE firm GHD designed CAD 2 Repair Fire Protection Systems, which will remove and replace the existing fire protection system and install a site fire pump for CAD 1-16 in the rear of CAD 2.

The buildings CAD 1-10 are located between B and D Streets, on the northwest side of Sanda Avenue, at

Cheatham Annex. The facilities were constructed in approximately 1943 as warehouses with four bays, which are currently occupied and used for storage. They are single-story structures utilizing wood columns and trusses in most bays, with some buildings having steel trusses in certain bays. The buildings have painted CMU (concrete masonry units) exterior walls, CMU fire separation walls and a concrete floor slab. A modified bitumen roofing system covers the roof deck, with several of the roofs recently replaced. No central heat or cooling system exists. Self-contained modular office units have been located in some of the buildings to provide offices for the tenants. Restrooms and small offices are located in the buildings. CAD 1-10 are protected by a working dry-pipe sprinkler system; four valve rooms are attached mailto:Thor.elmore@ocsinc.us mailto:bids@ocsinc.us mailto:jmcquillen@garney.com mailto:tybe_garney_federal_jv@garney.com to the north or south face of the building – one per bay. The gross floor area is approximately 101,475 square feet (SF) each.

Cheatham Annex system pressure for the entire complex is obtained from the existing water tank CAD

637, which was designed in 2012 and constructed in 2013. The design included a separate elevated tank in the warehouse area; however this tank was never built. Cheatham Annex is a little over 20 square miles with recreational facilities, bachelor housing units, training functions, administrative functions, and an industrial functional area, which includes a number of warehouses. The industrial/warehouse area is central to CAD 1-16 and CAD 30. This is one of the largest building areas for fire flows and but also has the smallest demand for domestic water. The domestic water system, when separated from the fire protection demand in the warehouse area, will still serve the warehouse area domestic needs in addition to all of the needs of the remaining buildings on Cheatham Annex. Current total domestic water demand for

Cheatham annex is approximately 50,000 gallons per day (GPD).

The current water system at Cheatham Annex utilizes two (2) 2 inch water lines located close to the church on Penniman Road near CAD 637 for makeup water. Adjacent to the church is a 16 inch water line on York County property. Also, at the intersection of Hawk’s Nest Drive and Penniman Road is a 12 inch water line on York County property.

This scope of work is to repair the fire protections systems in CAD 1, based on the design and study of the AE firm Fisher.

Please see Attachment A: 1757317 Specifications Signed, Attachment B: 1757317 - Drawings Signed and

Attachment C: SOW Repair Fire Protection Systems at CAD-1 for additional details

Estimated Price Range: In accordance with FAR 36.204, the magnitude of construction for this project is between $3,000,000 and $4,000,000.

Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and

Completion of Work, the duration of this task order shall be 400 calendar days from date of award

(includes 15 calendar days for submission and approval of bonds and insurance).

Wage Determination: Department of Labor (DoL) General Decision Number VA20240169 5/31/2024 applies to this work (Attachment D). The wage determination version in effect at the time of award shall apply to the work performed under this contract.

Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $686.48 for each calendar day of delay until the work is completed or accepted.

Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.

Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for

Construction, record shop drawings are required. Reproducible copies of these record drawings are not required.

Government Furnished Property: Not Included.

Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible Offeror, offering the best value to the Government. For this task order, to make a determination of best value, the Government shall evaluate each Offeror on price only and the basis for award will be low price.

Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each Offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less.

The Offeror shall submit an electronic copy with the price proposal form. An electronic copy of your bid bond must be submitted with your proposal package in PIEE Solicitation Module OR send via email to leanne.n.gerehart.civ@us.navy.mil and maurice.n.muse.civ@us.navy.mil within three (3) days after the due date and time for receipt of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration.

Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.

Proposal Acceptance Period: Proposal acceptance period shall be 150 days from receipt of offers.

Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing to leanne.n.gerehart.civ@us.navy.mil and maurice.n.muse.civ@us.navy.mil. All inquiries shall be submitted via email to the POCs no later than

Close of Business (COB) July 3rd 2024 @ 1400 EST. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment E). Do not submit the same inquiry more than once.

Please submit your PPIs on behalf of your subcontractors. A response will be published via an amendment and provided via email.

Site Visit: All MACC holders are invited to attend Site Visit for the project. Information is below:

Date and Time: Wednesday, June 12th, 2024 @ 0900 EST

Meeting Location: Please meet at Naval Weapons Station Yorktown, Yorktown, VA, in front of Gate 3.

Badging: Contractor personnel that do not have DBIDS access for Naval Weapons Station Yorktown must complete SECNAV 5512 form (Attachment G) and bring to the WPNSTA Yorktown Pass & ID office to secure a visitor pass to gain access to WPNSTA Yorktown. Please bring the SECNAV 5512 with you the day of the site visit and arrive early to allow for processing of the one day pass. The pass and ID office opens at 0800. A line quickly forms, so expect delays.

Please Note:

Site Visit POC: LeAnne Gerehart, PWD Yorktown – Contract Specialist

Email: leanne.n.gerehart.civ@us.navy.mil

Phone: (757) 847-7958 mailto:leanne.n.gerehart.civ@us.navy.mil mailto:maurice.n.muse.civ@us.navy.mil mailto:leanne.n.gerehart.civ@us.navy.mil mailto:maurice.n.muse.civ@us.navy.mil mailto:leanne.n.gerehart.civ@us.navy.mil

Site Visit POC: Maurice Muse, PWD Yorktown – Supervisory Contract Specialist

Email: maurice.n.muse.civ@us.navy.mil

Phone: (757) 887-4705

Proposal Due Date: Wednesday, July 31st, 2024 at 1400 Eastern Standard Time. LATE

PROPOSALS WILL NOT BE ACCEPTED.

Proposal Delivery Information: OFFERORS SHALL SUBMIT electronic proposals (.pdf format) in response to this solicitation using the PIEE Solicitation Module. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access

Instructions are provided via Attachment F. Emailed submissions will not be accepted. Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.

PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. Again, LATE PROPOSALS

WILL NOT BE ACCEPTED.

In response to this request for proposal, the complete proposal shall include the Price Proposal and the

Non-Cost/Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and

Submittal Requirements for Each Factor.

Evaluation Factors for Award

1. The proposed task order will be awarded to the responsible Offeror, offering the best value to the

Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each Offeror on price only.

2. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price:

(1) Solicitation Submittal Requirements: Offeror shall submit the following:

Cover page that includes:

- Solicitation Number

- Solicitation Title

- Prime Contractor Name

- Prime Contractor Address

- Phone Number

- Fax Number

- DUNS

- Cage Code

- Point of Contact mailto:maurice.n.muse.civ@us.navy.mil

- Point of Contact Phone Number

- Point of Contact Email

Price Proposal Form (Attachment H)

Acknowledged Amendments (if applicable)

Bid Bond

(2) Basis of Evaluation: The Government will evaluate the total sum of Contract Line Item prices 0001AA and 0001AB.

(3) Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

a. Comparison of proposed prices received in response to the RFP.

b. Comparison of proposed prices with the Independent Government Cost

Estimate (IGCE).

c. Comparison of proposed prices with available historical information.

d. Comparison of proposed prices with market survey results.

Evaluation

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with Offerors in the competitive range; and to award the contract to the Offeror submitting the lowest price proposal.

2. The Government intends to evaluate proposals and award a contract without discussions with offerors

(except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the

Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the

Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

Attachments:

1. Attachment A - 1757317 - Specifications Signed

2. Attachment B - 1757317 - Drawings Signed

3. Attachment C - SOW Fire Systems CAD-1

4. Attachment D - WD General Decision Number VA20240169 01/05/2024

5. Attachment E - PPI form

6. Attachment F - PIEE Vendor Access Instructions

7. Attachment G - SECNAV 5512

8. Attachment H - Price Proposal Form

RECAP OF IMPORTANT DATES:

SOLICITATION DATE: 28 MAY 2024

SITE VISIT DATE: 12 JUN 2024 at 0900 EDT

PPI CUT OFF DATE: 03 JUL 2024 at 1400 EDT

PROPOSAL DUE DATE: 31 JUL 2024 at 1400 EDT

ATTACHMENT D

"General Decision Number: VA20240169 05/31/2024

Superseded General Decision Number: VA20230169

State: Virginia

Construction Type: Building

County: York County in Virginia.

Includes the independent city of Poquoson*

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 |

|into on or after January 30, | generally applies to the |

|2022, or the contract is | contract. |

|renewed or extended (e.g., an |. The contractor must pay |

|option is exercised) on or | all covered workers at |

|after January 30, 2022: | least $17.20 per hour (or |

| | the applicable wage rate |

| | listed on this wage |

| | determination, if it is |

| | higher) for all hours |

| | spent performing on the |

| | contract in 2024. |

|If the contract was awarded on|. Executive Order 13658 |

|or between January 1, 2015 and| generally applies to the |

|January 29, 2022, and the | contract. |

|contract is not renewed or |. The contractor must pay all|

|extended on or after January | covered workers at least |

|30, 2022: | $12.90 per hour (or the |

| | applicable wage rate listed|

| | on this wage determination,|

| | if it is higher) for all |

| | hours spent performing on |

| | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the

Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/05/2024

1 02/23/2024

2 05/31/2024

ASBE0024-006 10/01/2023

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System

Insulation)......................$ 40.02 19.67+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas

Day provided the employee works the regular work day before and after the paid holiday.

BOIL0045-003 01/01/2021

BOILERMAKER......................$ 42.62 24.81

BRVA0008-001 05/01/2022

BRICKLAYER.......................$ 22.44 10.23

ELEC1340-001 12/01/2022

ELECTRICIAN (Includes Low

Voltage Wiring and Alarm

Installation)....................$ 31.30 8.5%+6.35

ELEV0052-005 01/01/2024

ELEVATOR MECHANIC................$ 49.84 37.885+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.

ENGI0147-019 05/01/2022

POWER EQUIPMENT OPERATOR

Cranes 90 tons & over capacity; Tower & Climbing

Cranes with Controls 100

ft. above ground............$ 34.17 15.21

Cranes under 90 tons........$ 33.26 15.12

* IRON0028-006 05/01/2023

IRONWORKER, RIGGER...............$ 30.22 11%+14.24

* IRON0028-007 05/01/2023

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 30.22 11%+14.24

PLUM0110-008 11/01/2023

PIPEFITTER (Includes HVAC

Pipe, Unit and Temperature

Controls Installations)..........$ 33.67 17.50

PLUMBER..........................$ 33.67 17.50

* SUVA2013-054 01/11/2016

CARPENTER, Includes

Acoustical Ceiling

Installation, Drywall

Hanging, and Form Work...........$ 18.56 0.00

CAULKER..........................$ 18.49 1.33

CEMENT MASON/CONCRETE FINISHER...$ 17.48 0.00

GLAZIER..........................$ 19.36 4.68

IRONWORKER, REINFORCING..........$ 27.18 4.13

LABORER: Mason Tender - Brick...$ 13.48 ** 3.27

LABORER: Mason Tender -

Cement/Concrete..................$ 12.96 ** 3.12

LABORER: Pipelayer..............$ 12.40 ** 1.96

LABORER: Common or General, Including Demolition.............$ 13.27 ** 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 20.69 1.35

OPERATOR: Bobcat/Skid

Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 18.07 3.50

OPERATOR: Forklift..............$ 19.40 7.00

OPERATOR: Loader................$ 21.28 3.17

OPERATOR: Roller................$ 16.25 ** 4.88

PAINTER (Brush and Roller).......$ 16.87 ** 0.00

PAINTER: Spray..................$ 18.10 5.43

ROOFER...........................$ 18.40 2.31

SHEET METAL WORKER, Includes

HVAC Duct Installation...........$ 19.24 2.80

SPRINKLER FITTER (Fire

Sprinklers)......................$ 18.91 4.67

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 15.50 ** 0.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658

($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

State Adopted Rate Identifiers

Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R �1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"