AMENDMENT 0001 FOR DDGX PROJECT.pdf
PDF 312 KB Posted
- Solicitation number
- N4008524R2653
About this file
This document is an amendment to solicitation N4008524R2653 for a B670 Annex Load Bank Platform in support of a DDGX Project. The key details are:
- An additional site visit is scheduled for September 19, 2024 at 2:00 PM EDT.
- The Pre-Proposal Inquiry (PPI) cutoff date has been extended to September 26, 2024.
- The proposal due date has been changed from September 17, 2024 to October 10, 2024 at 2:00 PM EDT.
- Pre-Proposal Inquiry responses to questions 1-3 have been provided.
- A post-site visit roster from the September 4, 2024 site visit has been included.
- This project is restricted to North MACC holders only.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 for DDGX.pdf | ||
| SITE VISIT DOC 9-18-24.jpg | JPG image | |
| SITE VISIT DOC 9-4-24.jpg | JPG image | |
| Attachment A 1733372 DWG.pdf | ||
| Attachment D Price Proposal Form.pdf | ||
| Attachment A 1733372_WP2_SPC.pdf | ||
| ATTACHMENT B WAGE DETERMINATION.pdf | ||
| Attachment C Pre-Proposal Inquiry (PPI) Form.xlsx | XLSX spreadsheet | |
| Attachment G PIEE Vendor Access Instructions.pdf | ||
| Attachment E SECNAV 5512 Form.pdf | ||
| Attachment F ODP Badge Access Request.xls | XLS spreadsheet | |
| GENERAL REQUIREMENTS FOR DDGX PROJECT.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0001 09/11/2024
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFAC MID ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-24-R-2653
9B. DATED (SEE ITEM 11)
05/13/23
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N40085-24-R-2634, B670 Load Bank
Contract POC Georgia Scott, georgia.a.scott.civ@us.navy.mil 757-341-0691
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
N40085-24-R-2653
SF 30 BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
The purpose of this amendment is to provide the following:
1. Additional Site Visit date is 19 September 2024 at 2:00 p.m. (EDT)
2. Revise PPI Cut date to 26 September 2024
3. The proposal due date is extended from 17 September 2024 to 10 October 2024
4. Provide Pre-Proposal Inquiries (PPI) Log 01 responses questions 1-3
5. Post Site Visit Roster held on 4 September 2024
6. This project is restricted to North MACC holders only
Pre-Proposal Inquiry Submission Form N4008524R2653, DDGX B77 Load Bank Platform, PNYA, PA
Reference
Question Responses Page Section Paragraph n/a n/a n/a
Would the government please allow for an additional site visit for our subcontractors?
Additional Site Visit will be held on 19 September 2024 at 2:00 p.m. (EDT)
Site Visit: All MACC holders are invited to attend Site Visit for the project. Information is below:
Date: Thursday 19 SEP 2024 at 2:00 P.M.
Meeting Location: B77L Main Entrance Meeting Address: 1000 Kitty Hawk Ave Philadelphia, PA 19112
All Attendees, please make sure, you follow the direction outlined in the RFP for base access or you will not be able to attend the second site visit n/a n/a n/a
Would the government please extend the PPI due date to allow for subcontractors to review the site (if possible) and review the plans and specifications?
PPI Cutoff date has been extended to 26 September 2024 n/a n/a n/a
We would like to request an extension to the proposal submission date.
The proposal due date has been changed from 17 September 2024 to 10 October 2024 at 2:00 p.m. (EDT) (via PIEE)
End of Summary
File details come from the government source that posted it. Updated .