AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
N40085‐24‐R‐2652 Amendment 0003
Con nua on Sheet
Document, Section Question
CLNC 41 22 13.15 BRIDGE CRANE
OVERHEAD ELEC UNDER RUNNING
TROLLEY,Page 34, Paragraph 3.3
ERECTION AND INSTALLATION
DOES THE GOVERNMENT REQUIRE THE CRANE SYSTEM TO BE INSTALLED
USING NAVFAC P307 TRAINED PERSONNEL TO ENSURE ALL GOVERNMENT
REQUIREMENTS ARE MET?
Answer: Correct
24‐0400 1047 Bridge Crane ‐ SOW;
Specifications: Page 6, Specifications
CAN THE GOVERNMENT PROVIDE THE CONCRETE PSI AND THICKNESS OF
FLOOR WHERE CRANE SYSTEM IS TO BE INSTALLED?
Answer: See a achment: 1047 S DRAWING BOAT SHOP AND ATTACHMENT:
12739701 N6 BOAT SHOP
DRAWING SHOP 6” CONCRETE, NO psi DATA FOUND.
24‐0400 1047 Bridge Crane ‐ SOW;
Specifications: Page 6, Specifications
JUST TO VERIFY DOES THE GOVERNMENT DESIRE THE CRANE SYSTEM AND
HOIST TO MEET ALL REQUIREMENTS OF THE NAVCRANECENINST 11450.2A?
Answer: Correct
Combined DIV 01 specs small projects, Page 24/235, Section 01 31 50 Part 1.1 Submittals, SD‐11 Closeout Submittals AND Section 41 22 13.15 page 11 ‐ 14/39, Section 1.6 Quality Assurance
DOES THE GOVERNMENT DESIRE THE CRANE PROVIDER/INSTALLER
PROVIDE ALL NAVY PRODUCT SUBMITTALS, CERTIFICATES, LOAD TEST, NDT,
MISR, CCIR, BRAKE SPECIFICATIONS AS PART OF INSTALLATION?
Answer: Correct
CLNC 41 22 13.15 BRIDGE CRANE
OVERHEAD ELEC UNDER RUNNING
TROLLEY, page 36/39, Paragraph 3.4.5 Load Tests AND page 35/39 Section
3.4.2 Operational Tests
DOES THE GOVERNMENT REQUIRE THE CRANE PROVIDER/INSTALLER TO
PROVIDE LOAD TEST WEIGHTS AND NAVFAC CERTIFIED LOAD TEST
DIRECTOR TO PERFORM LOAD TESTING IAW THE NAVFAC P307 AS PART OF
THE INSTALLATION?
Answer: Correct
CLNC 41 22 13.15 BRIDGE CRANE
OVERHEAD ELEC UNDER RUNNING
TROLLEY, page 39/39, paragraph 3.8
FINAL ACCEPTANCE
WILL THE CRANE PROVIDER/INSTALLER BE REQUIRED TO CORRECT ALL
ITEMS THAT DO NOT MEET THE UFGS 41 SERIES SPEC REQUIREMENT PRIOR
TO CRANE ACCEPTANCE?
Answer: Correct
24‐0400 1047 Bridge Crane ‐ SOW;
Specifications: Page 6, Specifications
CAN THE FREESTANDING CRANE SYSTEM BE BRACED BACK TO THE
BUILDING TO STABILIZE AND REDUCE MOMENT OF INERTIA IF NEEDED?
Answer: Correct
24‐0400 1047 Bridge Crane ‐ SOW;
Specifications: Page 6, Specifications
ARE PE STAMPED ENGINEERING DRAWINGS REQUIRED ON CRANE RUNWAY
AND BRIDGE?
N40085‐24‐R‐2652 Amendment 0003
Con nua on Sheet
Answer: Correct
N/A
WILL THE GOVERNMENT PROVIDE A CLEAR UNOBSTRUCTED WORK SPACE
DURING INSTALLATION?
Answer: Correct, unit shall remove all obstacles in Contractor way, Contactor shall be responsible for the securing the bay area during the dura on of contract.
CLNC Section 41 22 13.15 page 39/39, paragraph 3.8 FINAL ACCEPTANCE
WILL THE GOVERNMENT HAVE THE BASE CRANE CERTIFYING OFFICIAL AT
ACCEPTANCE AND LOAD TESTING TO ENSURE THE CRANE IS IAW WITH THE
NAVCRANECENINST 11450.2A?
Answer: Contractors responsibility to no fy Base Crane Cer fier.
2. All other terms and condi ons remain unchanged.
| 24-0400 Amend 0003 |
| Untitled |
| Untitled |
24-0400 SF30 Continuation Page Amend 0003
| IDCode: |
| Page: 1 |
| Pages: 2 |
| AmendNo: AMENDMENT NO. 0003 |
| EffDate: 4/18/24 |
| ReqNo: |
| ProjNo: 24-0400 |
| IssCode: N40085 |
| IssuedBy: NAVFAC Mid-Atlantic |
Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
| AdmCode: |
| AdminBy: See Item 6 |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolChgYs: Yes |
| SolChgNo: Off |
| SolAmdNo: N40085-24-R-2652 |
| AmendDate: 3-13-24 |
| ModNo: |
| ModDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: 24-0400, 1047 Bridge Crane |
Amendment 0003, Answer Requests for information
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |