Project Matrix 24R2534.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Building 14 New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard, Kittery, Maine
Solicitation number
N4008524R2534
Issued by

About this file

This document contains an Excel file template for capturing project experience relevant to a federal construction contract opportunity. The template requests information on project titles, locations, completion dates, prime or subcontractor role, design-bid-build or design-build delivery method, and whether the project involved a Department of Defense or federal agency. It also includes fields for bonding capacity, DUNS number, CAGE code, small business status, point of contact, and annual revenue.

The related federal contract opportunity is for building renovations at the Portsmouth Naval Shipyard in Kittery, Maine. Specifically, the project involves improvements to Building 14 including a new stair and life safety systems, as well as power upgrades. The pre-solicitation notice was issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Contractor Information Form.docx DOCX document
Project Information Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedSize: A final construction cost of $10M or greaterScope: Complete renovation of a historic structure including repairing and removing interior structure while maintaining the exterior envelope, at least three stories tall, providing temporary shoring systems to support/brace existing framing members.Complexity: (a) Experience with hazardous material abatement;Complexity: (b) Experience with interior and exterior renovation of historic brick/granite block buildings including temporary shoring of structural loadbearing elements;Complexity: (c) Experience with modifications to historic timber framing;Complexity: (d) Experience with historic facilities and adherence to the Secretary of the Interior guidelines for selective demolition and renovation;Complexity: (e) Experience with completely overhauling the building’s mechanical, electrical, and fire protection systems, utility outages, and/or temporary utilities that involved relevant utility systems;Complexity: (f) Experience with multi-phased/sequenced construction;Complexity: (g) Experience with projects in congested urban or industrial areas with limited construction laydown space and restricted access and coordinated logistics.
1
2
3
4
5

General Information: Bonding Capacity DUNS Cage Address SB Status POC POC Contact Information Annual Revenue #Offices

File details come from the government source that posted it. Updated .