ATTACHMENTCPPIsBuilding350 - NAVFAC Response.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- N4008522R2765
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22R2765_AMENDMENT 0001.docx | DOCX document | |
| TST PPIs - Building350 - NAVFAC Response.xlsx | XLSX spreadsheet | |
| 1671300_Repair Water Infiltration to SE Amin Area_AMENDMENT 1.docx | DOCX document | |
| 1671300_DN350 Repair SE Admin Area_FINAL DB RFP_SIGNED.pdf | ||
| ATTACHGBLANKSponsorVerificationSpreadsheet.xls | XLS spreadsheet | |
| BASEACCESSINSTRUCTION.pdf | ||
| General Requirements BLDG 350.docx | DOCX document | |
| SecNav5512.pdf | ||
| Attachment Bbldg350.pdf | ||
| ATTACHMENTCPPIsBuilding350.xlsx | XLSX spreadsheet | |
| va62.txt | TXT text file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| ATTACHMENT A | |||
| Project Title: Repair Water Infiltration to SE Admin Area | Solicitation / RFP#: N40085-22-R-2765 | ||
| PPI Cut Off Date: 7/29/2022 Proposal Due: 8/12/2022 | |||
| PPI No. | REFERENCE | CONTRACTOR QUESTIONS | GOVERNMENT RESPONSES |
| Page, Section, Drawing # | |||
| 1 | Part 3, 5.0 Building/Room Requirements | All the PME Scope is listed as “Not Applicable”; however, Part 3, 5.0 Interior Room 104 states to remove, salvage, and reinstall mini-split HVAC Conduit and piping through existing blank-off panel. Please confirm that the intent is that the Mechanical Contractor can perform this work without the need of a mechanical PE and/or mechanical design drawings. | The Mechanical Contractor can perform this work without the need of a mechanical PE and/or mechanical design drawings. Please add notes to the Architectural drawings. |
| 2 | Part 3, B2030 Exterior Doors | Confirm that new pair of exterior doors at Mechanical Room are to be galvanized steel material, Level 3. Existing doors were noted as being FRP material during site visit. Previous projects on same installation required FRP material for all exterior doors. | Please provide FRP doors. |
| 3 | Part 3, B2010 Exterior Walls | Confirm that cracks in existing concrete exterior walls and at lintels above windows are to be repaired prior to applying new elastomeric coating. | Yes, all walls to have a new elastomeric coating must have the walls prepared before the coating is installed which includes the repairs of cracks. |
| 4 | Part 3, 5.0 Building/Room Requirements, Exterior Note 8 | Confirm if existing holes from previous railing posts are to be patched/infilled prior to applying new epoxy coating system to existing exterior concrete walkway. | Yes, please patch/infill existing holes from previous railing posts. |
| 5 | Part 3, 5.0 Building/Room Requirements | All the PME Scope is listed as “Not Applicable”; however, Part 3, 5.0 Interior Room 104 states to remove, salvage, and reinstall mini-split HVAC Conduit and piping through existing blank-off panel. Please confirm that the intent is that the Mechanical Contractor can perform this work without the need of a mechanical PE and/or mechanical design drawings. | The Mechanical Contractor can perform this work without the need of a mechanical PE and/or mechanical design drawings. Please add notes to the Architectural drawings. |
| 6 | Part 3, C30 Interior Finishes | Confirm that new floor and ceiling finishes are not required in Rooms 104 & 105. | New floor and ceiling finishes are not required in Rooms 104 & 105. |
| 7 | Part 3, C30 Interior Finishes | Will Rooms 104 & 105 be occupied during the work of this contract? Will constuction need to be phased, or work performed during off hours (nights & weekends)? | Yes, Rooms 104 and 105 will be occupied during construction. Plan to protect the rooms during construction. Protection must not limit cooling of the server. |
| 8 | Will a P6 construction schedule be required for this project. | Yes, please refer to spec section 01 32 16.00 20 in PART 5 of the RFP. | |
| 9 | Will a cost loaded schedule be required for this project. | Yes, please refer to spec section 01 32 16.00 20 in PART 5 of the RFP. | |
| 10 |