K Span Night Lighting Installation Camp Devil Dog Federal contract opportunity
Solicitation number
N4008522R2713
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This amendment modifies a solicitation for the K Span Night Lighting Installation Camp Devil Dog project. The amendment provides responses to contractor questions to clarify project requirements. Bar charts are acceptable scheduling formats in lieu of NAS schedules. The use of MC cable is permitted for inaccessible wiring locations, with exposed conduit to be EMT. The Marines will move bunk beds and furniture daily during construction to allow contractor access and then return the items. The response date for proposals remains June 22, 2022 and contractors must acknowledge any amendments when submitting proposals.

View the file

Other files for this federal contract opportunity

Other files attached to K Span Night Lighting Installation Camp Devil Dog, newest first.
File Type Posted
Final Amend 0001 220414.pdf PDF
Final 220414 RFP.pdf PDF
22-0414 SUBMITTAL REGISTER.pdf PDF
22-0414 SOW.pdf PDF
22-0414 SPECS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFIC T ON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLIC TION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

AMENDMENT NO. 0002 05/23/22 22-0414

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1005 Michael Road Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-22-R-2713

05/18/22

22-0414, K Span Night Lighting Installation Camp Devil Dog

Amendment 0002, RFI Response

The time and date for receipt of proposals remains 1400, 22 June 2022.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

See Continuation Page(s

N40085-22-R-2713 Amendment 0002

CONTINUATION SHEET

1. QUESTION: Is a Bar Chart Schedule acceptable on this project or is a NAS schedule required per Spec Section 01 32 17 Network Analysis SYSTEM (NAS) Paragraph 1.4. Please advise.

ANSWER: Bar chart is acceptable.

2. QUESTION: 2. Note # 4 on the drawing references adding access holes for installation of wiring. With the interior ceiling being sloped to follow the roof line there will be very limited space above sheetrock at the locations where the new lights are shown to be installed. Our subcontractor suggests using “fished MC cable” for installing the new wiring to avoid having to add the large amount of access holes that would be needed to install this wiring as EMT conduit with proper strapping to the interior ceiling structural members. If this is not acceptable another suggestion would be to choose a surface mount light fixture instead of the recessed can type described and install the conduit exposed on bottom of sheetrock ceiling. Please advise.

ANSWER: The use of MC cable is acceptable for areas that are inaccessible. All exposed conduit shall be type EMT.

3. QUESTION: Please advise who will be responsible for moving the bunk beds and furniture out of the way for the installation work and the put back of furniture once work is complete?

ANSWER: The Marines will move their racks and gear out of the way and move it back daily during construction. Please provide the POC with the work schedule to ensure there are no work delays.

3. All other terms and conditions remain unchanged.

Draft Amend 0002 220414
SF30 Continuation Sheet