22R2504 Sources Sought Project Matrix.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
P228 ATC Tower & Air Operations, Marine Corps Air Station, Cherry Point, North Carolina
Solicitation number
N4008522R2504
Issued by

View the file

Other files

File Type Posted
22R2504 Sources Sought Contractor Information Form.docx DOCX document
22R2504 Sources Sought Project Data Form (1).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EEI

#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedProject Size (50,000 SF or > AND Construction Cost $8M or >)Scope: Renovation of masonry building at least three stories tall including removing interior structure while maintaining the exterior envelope.Complexity: Each submitted project does not require demonstrated experience with all of the following elements, but collectively, experience with all elements must be established throughout the submitted relevant projects.

(a) Hazardous material abatement;

(b) Interior and exterior renovation of a buildings including temporary shoring of structural loadbearing elements;

(c) Historic facilities and adherence to the Secretary of the Interior guidelines for selective demolition and renovation;

(d) Multi-phased/sequenced construction that allowed facility to remain open for operations throughout the project; and

(e) Projects in congested urban or industrial areas with limited construction laydown space and restricted access.

1 Tyndall – Hurricane Michael Relief Tyndall Air Force Base , FL 2019 Prime DB Fed $26,601,716.56 80 building Renovation (b) Interior and exterior renovation of a buildings including temporary shoring of structural loadbearing elements;

(d) Multi-phased/sequenced construction that allowed facility to remain open for operations throughout the project; and

2Cape Cod Coast Guard Air Station, Air Traffic Control Tower RepairsCape Cod, MA2015PrimeDBFed$2,816,717.56Masonry Air Traffic Control Tower Reno(b) Interior and exterior renovation of a buildings including temporary shoring of structural loadbearing elements;
3Foley upper envelopeAlbany, NY2014PrimeDBFed$1,621,531.00Masonry Parapet and Roof Reno(c) Historic facilities and adherence to the Secretary of the Interior guidelines for selective demolition and renovation;

(e) Projects in congested urban or industrial areas with limited construction laydown space and restricted access.

4USCG Academy Michel Hall Replace Electrical WiringNew London, CT2016PrimeDBFed$913,524Electrical upgrade in Masonry Building(d) Multi-phased/sequenced construction that allowed facility to remain open for operations throughout the project; and
5Leo O'Brien Social Security Administration - Barrier Wall ConstructionAlbany, NY2019PrimeDBFed15,000 SF $1,712,862Interior Renovation(e) Projects in congested urban or industrial areas with limited construction laydown space and restricted access.
General Information:Bonding CapacityDUNSCageAddressSB StatusPOCPOC Contact InformationAnnual Revenue#Offices
Enfield Enterprises Inc$75 million Agregate7899328371C6F730 Magaziner Place
Springfield, MA 01104Small Business HubzoneNick D'Angelondangelo@enfieldenterprisesinc. com

Office: 413-788-2688 Fax: 413-788-2479 Mobile: 413-302-5734 39.5 Million 7

J&J

#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedProject Size (50,000 SF or > AND Construction Cost $8M or >)Scope: Renovation of masonry building at least three stories tall including removing interior structure while maintaining the exterior envelope.Complexity: Each submitted project does not require demonstrated experience with all of the following elements, but collectively, experience with all elements must be established throughout the submitted relevant projects.

(a) Hazardous material abatement;

(b) Interior and exterior renovation of a buildings including temporary shoring of structural loadbearing elements;

(c) Historic facilities and adherence to the Secretary of the Interior guidelines for selective demolition and renovation;

(d) Multi-phased/sequenced construction that allowed facility to remain open for operations throughout the project; and

(e) Projects in congested urban or industrial areas with limited construction laydown space and restricted access.

1Paige Laboratory RenovationUMASS, Amherst, MA2014PrimeDBBState$8,183,128Work performed on a four story masonry bldg, existing exterior envelope with window and roof replacement. Interior demolition for new finishesProject included hazmat abatement prior to beginning construction. Temporary shoring of interior bldg structure for installation of a new elevator. Project was located on an active college campus with very small site footprint, requiring well scheduled material and equipment deliveries due to limited site storage.
2Hanscom Primary SchoolBedford, MA2019PrimeDBBFed$37,306,783Multi-story building that required connecting the structure and utilities to an active Middle School building.Project included hazmat demolition within an existing building, located on an active school site.Phased construction required for a temporary school facility to maintain active school requirements, allowing the existing school to remain open.
3Taunton City HallTaunton, MA2020PrimeDBBState$22,068,0331896 Granite Building was a masonry and stone structure that required demolition of existing finishes and utilities. Exterior exterior walls and roof superstucture remained in place.Project included hazmat abatement of the existing 1896 Granite Building. The project required underpinning of the existing building foundation and structural shoring and structural upgrades to the existing building framing system. Historical restoration was required for the 1896 Granite Building masonry and stone building envelope, interior ornamental plastering finishes, interior architectural millwork paneling, trim and wood doors.
4Cambridge Rindge and LatinCambridge, MA2011PrimeDBBState$93,066,976The existing multi-story masonry structure, including extrior limestone finishes were maintained and restored.The existing school remained active during the renovations and additions to the existing school, required a phased construction schedule.. Hazmat removals were required prior to new renovation work in the existing school. The existing limestone masonry exterior received restoration and upgrades. Structural shoring and upgrades were required at the existing school for new elevators and building addition connections.
5
General Information:Bonding CapacityDUNSCageAddressSB StatusPOCPOC Contact InformationAnnual Revenue#Offices
J&J Contractors$100,000,000 Single, $200,000,000 Aggregate11-151-91531GMT3101 Billerica Ave. Bldg. 5 Suite 205 North Billerica, MA 01862Small BusinessKamlesh PatelKamp@jjcontractor.com 978.452.9898$36,900,0001

COMPANY INFORMATION

#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedSize: Multiple building project with a cumulative square footage of 30,000 or greater.Scope: Scope: Construction of 100ft height or greater Air Traffic Control Tower with supporting operations/training or maintenance facilities.

Complexity: Each project submitted must demonstrated experience constructing an Air Traffic Control Tower and one or both of the following elements:

a) DOD or International Airfield lighting work.

b) DOD or International Airfield utility work.

1
2
3
4
5
General Information:Bonding CapacityDUNSCageAddressSB StatusPOCPOC Contact InformationAnnual Revenue#Offices
COMPANY NAME

File details come from the government source that posted it. Updated .