EEI
| # | Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | |||
| (year) | Was your firm Prime or Sub? | DB or DBB | DoD / Fed | Project Size (50,000 SF or > AND Construction Cost $8M or >) | Scope: Renovation of masonry building at least three stories tall including removing interior structure while maintaining the exterior envelope. | Complexity: Each submitted project does not require demonstrated experience with all of the following elements, but collectively, experience with all elements must be established throughout the submitted relevant projects. |
(a) Hazardous material abatement;
(b) Interior and exterior renovation of a buildings including temporary shoring of structural loadbearing elements;
(c) Historic facilities and adherence to the Secretary of the Interior guidelines for selective demolition and renovation;
(d) Multi-phased/sequenced construction that allowed facility to remain open for operations throughout the project; and
(e) Projects in congested urban or industrial areas with limited construction laydown space and restricted access.
1 Tyndall – Hurricane Michael Relief Tyndall Air Force Base , FL 2019 Prime DB Fed $26,601,716.56 80 building Renovation (b) Interior and exterior renovation of a buildings including temporary shoring of structural loadbearing elements;
(d) Multi-phased/sequenced construction that allowed facility to remain open for operations throughout the project; and
| 2 | Cape Cod Coast Guard Air Station, Air Traffic Control Tower Repairs | Cape Cod, MA | 2015 | Prime | DB | Fed | $2,816,717.56 | Masonry Air Traffic Control Tower Reno | (b) Interior and exterior renovation of a buildings including temporary shoring of structural loadbearing elements; |
| 3 | Foley upper envelope | Albany, NY | 2014 | Prime | DB | Fed | $1,621,531.00 | Masonry Parapet and Roof Reno | (c) Historic facilities and adherence to the Secretary of the Interior guidelines for selective demolition and renovation; |
(e) Projects in congested urban or industrial areas with limited construction laydown space and restricted access.
| 4 | USCG Academy Michel Hall Replace Electrical Wiring | New London, CT | 2016 | Prime | DB | Fed | $913,524 | Electrical upgrade in Masonry Building | (d) Multi-phased/sequenced construction that allowed facility to remain open for operations throughout the project; and | ||
| 5 | Leo O'Brien Social Security Administration - Barrier Wall Construction | Albany, NY | 2019 | Prime | DB | Fed | 15,000 SF $1,712,862 | Interior Renovation | (e) Projects in congested urban or industrial areas with limited construction laydown space and restricted access. | ||
| General Information: | Bonding Capacity | DUNS | Cage | Address | SB Status | POC | POC Contact Information | Annual Revenue | #Offices | ||
| Enfield Enterprises Inc | $75 million Agregate | 789932837 | 1C6F7 | 30 Magaziner Place | |||||||
| Springfield, MA 01104 | Small Business Hubzone | Nick D'Angelo | ndangelo@enfieldenterprisesinc. com |
Office: 413-788-2688 Fax: 413-788-2479 Mobile: 413-302-5734 39.5 Million 7
J&J
| # | Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | |||
| (year) | Was your firm Prime or Sub? | DB or DBB | DoD / Fed | Project Size (50,000 SF or > AND Construction Cost $8M or >) | Scope: Renovation of masonry building at least three stories tall including removing interior structure while maintaining the exterior envelope. | Complexity: Each submitted project does not require demonstrated experience with all of the following elements, but collectively, experience with all elements must be established throughout the submitted relevant projects. |
(a) Hazardous material abatement;
(b) Interior and exterior renovation of a buildings including temporary shoring of structural loadbearing elements;
(c) Historic facilities and adherence to the Secretary of the Interior guidelines for selective demolition and renovation;
(d) Multi-phased/sequenced construction that allowed facility to remain open for operations throughout the project; and
(e) Projects in congested urban or industrial areas with limited construction laydown space and restricted access.
| 1 | Paige Laboratory Renovation | UMASS, Amherst, MA | 2014 | Prime | DBB | State | $8,183,128 | Work performed on a four story masonry bldg, existing exterior envelope with window and roof replacement. Interior demolition for new finishes | Project included hazmat abatement prior to beginning construction. Temporary shoring of interior bldg structure for installation of a new elevator. Project was located on an active college campus with very small site footprint, requiring well scheduled material and equipment deliveries due to limited site storage. | |
| 2 | Hanscom Primary School | Bedford, MA | 2019 | Prime | DBB | Fed | $37,306,783 | Multi-story building that required connecting the structure and utilities to an active Middle School building. | Project included hazmat demolition within an existing building, located on an active school site.Phased construction required for a temporary school facility to maintain active school requirements, allowing the existing school to remain open. | |
| 3 | Taunton City Hall | Taunton, MA | 2020 | Prime | DBB | State | $22,068,033 | 1896 Granite Building was a masonry and stone structure that required demolition of existing finishes and utilities. Exterior exterior walls and roof superstucture remained in place. | Project included hazmat abatement of the existing 1896 Granite Building. The project required underpinning of the existing building foundation and structural shoring and structural upgrades to the existing building framing system. Historical restoration was required for the 1896 Granite Building masonry and stone building envelope, interior ornamental plastering finishes, interior architectural millwork paneling, trim and wood doors. | |
| 4 | Cambridge Rindge and Latin | Cambridge, MA | 2011 | Prime | DBB | State | $93,066,976 | The existing multi-story masonry structure, including extrior limestone finishes were maintained and restored. | The existing school remained active during the renovations and additions to the existing school, required a phased construction schedule.. Hazmat removals were required prior to new renovation work in the existing school. The existing limestone masonry exterior received restoration and upgrades. Structural shoring and upgrades were required at the existing school for new elevators and building addition connections. | |
| 5 | ||||||||||
| General Information: | Bonding Capacity | DUNS | Cage | Address | SB Status | POC | POC Contact Information | Annual Revenue | #Offices | |
| J&J Contractors | $100,000,000 Single, $200,000,000 Aggregate | 11-151-9153 | 1GMT3 | 101 Billerica Ave. Bldg. 5 Suite 205 North Billerica, MA 01862 | Small Business | Kamlesh Patel | Kamp@jjcontractor.com 978.452.9898 | $36,900,000 | 1 |
COMPANY INFORMATION
| # | Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | ||
| (year) | Was your firm Prime or Sub? | DB or DBB | DoD / Fed | Size: Multiple building project with a cumulative square footage of 30,000 or greater. | Scope: Scope: Construction of 100ft height or greater Air Traffic Control Tower with supporting operations/training or maintenance facilities. |
Complexity: Each project submitted must demonstrated experience constructing an Air Traffic Control Tower and one or both of the following elements:
a) DOD or International Airfield lighting work.
b) DOD or International Airfield utility work.
| 1 | ||||||||||
| 2 | ||||||||||
| 3 | ||||||||||
| 4 | ||||||||||
| 5 | ||||||||||
| General Information: | Bonding Capacity | DUNS | Cage | Address | SB Status | POC | POC Contact Information | Annual Revenue | #Offices | |
| COMPANY NAME |
File details come from the government source that posted it. Updated .