This amendment to a solicitation provides responses to potential offeror questions and extends the proposal due date. The work includes maintenance dredging of channels and a wet slip at Joint Expeditionary Base Little Creek in Virginia Beach, Virginia to dispose of dredged materials at an approved off-site facility. Additional work involves repairing scour holes under piers using dredged sediments and armoring the seafloor with riprap stone paid via lump sum. The amendment clarifies that dredging will use a clamshell bucket, permits are pending but will be provided to the contractor once secured, and removal of a 48-inch reinforced concrete pipe is debris covered under a line item. The proposal due date is extended to September 12, 2022.

View the file

Other files

File Type Posted
JEBLC_48 RCPand Debris_Photos.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment provides responses to PPIs. The current proposal due date is 12 SEPT 2022.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008522B2511

X 9B. DATED (SEE ITEM 11)

12-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Aug-2022

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008522B2511

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

This amendment hereby:

1. Provides Attachment “JEBLC_48 RCPand Debris_Photos.pdf”

2. Provides PPI responses

# Reference Question Response Page Section Para

1 01 22 00 1.4.1.1 Section 01 22 00 1.4.1.1 references hydraulic dredging and upland disposal. Please confirm that hydraulic dredging is not permitted on this project.

Refrence to Hydraulic Dredging is typographical error. Dredging method shall be via Clamshell Bucket.

2 Please provide copies of USACE and VMRC permits.

Permits are currently under review by regulatory agencies. Copies of permits will be provided to the contractor once secured.

3 How will payment be made for the rip rap stone protection? Is payment by the CY?

Stone Placement shall be paid via lump sum per Line Item 2 on the price schedule. Government shall perform pre-stone placement bathymetric survey and post-stone placement bathymetric survey to verify required in-place thickness.

4 Can CB-125 Wet Slip work be performed by land?

No. Contractor shall bid work to be done from the water.

5 Please confirm that the removal of the 48” RCP is part of this contract. Where will payment for this work be made?

48" RCP will be covered under a LS price and is considered debris per Line Item 3 in the price schedule. Please see attachment provided in this amendment.

6 1. Scour holes under piers. Drawing V-104 shows portions of the scour holes beneath the piers. Will these areas need to be filled with sand?

The area under the piers, as shown on Sheet V-104 shall be filled using the dredged sediment, from the channel, as specified on the plans and specs.

(End of Summary of Changes)