This amendment to a solicitation provides responses to 20 questions regarding required scope of work for a demolition project at Marine Corps Air Station Cherry Point in North Carolina. The contractor must demolish building B-3742 by the unchanged due date and time. The government will remove all furnishings from the building prior to award. The contractor will have access to electrical, water, and internet hookups for an onsite office trailer and must install backflow prevention. The contractor is responsible for all utility payments and must sod the entire site, remove only trees as indicated, and protect some asphalt for future use. GIS deliverables and temporary fencing are required.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008522B2503 Demolition B-3742 Amendment 0002 The Purpose of this Amendment is to:
1. Answ er RFI's w ith the attached
2. The due date and time remains the same.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008522B2503
X 9B. DATED (SEE ITEM 11)
06-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jan-2022
CODE
NAVFACSYSCOM MID-ATLANTIC
FEAD CHERRY POINT
BLDG 163 CURTIS ROAD
PSC BOX 8006
CHERRY POINT NC 28533-0006
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008522B2503
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
RFI Responses:
1. Do you know if the Asbestos/Lead survey was a Partial survey or a Full survey?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE: A full Asbestos/lead Survey was performed on March 3rd, 2020 per report dated March 5th, 2020.
2. Do you know if the building was still occupied or vacant during the Asbestos Survey?
NOTE: The building was occupied during the asbestos inspection, but rooms where cleared by the duty for the inspection process.
3. Will the contractor be allowed access to electrical hookup for an on‐site office trailer?
NOTE: Yes
4. Will the contractor be allowed access to hookup internet for the on‐site office trailer?
5. Will the contractor be allowed access to a water hookup like a fire hydrant for Dust Control?
6. Will the contractor be responsible to install a Backflow prevention device for the water hookup?
7. Will the contractor be responsible to pay for any utilities used?
8. Is the site visit scheduled for 1/18/2022 @ 9AM a mandatory site visit?
9. Spec section 02 82 30 and drawing C100 (Erosion Control Note) both reference seeding and sod. Are we required to sod the entire site?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE: Yes
10. Are GIS Deliverables required for this project?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE: Yes
11. Will temporary chain link security fencing be required for the site?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
12. Does building 4251 get demolished as part of this project? It is not noted to be demolished but has the same hashing as building 3742.
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE: No
13. Is the contractor required to remove and dispose the "cement wall barrier bollards" chained together, on the South and Eastern elevation of the building perimeter?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE: No
14. Is the smoking/BBQ gazebo located on the North/East elevation scheduled for demolition?
NOTE: No
15. Is the contractor required to remove the electrical switch/box and the communication pedestal located north of B‐3742?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE: No
16. It seems the west parking area, is shared with the athletic field adjacent to B‐3742. How much asphalt is required to be removed on the western elevation?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE: Drawings depict limit of demo.
17. Will the contractor be required to protect in place part of the asphalt located on western elevation for future use?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE: Yes
18. Is the contractor required to remove the trees on the South and Eastern elevation of the property?
NOTE: Demo trees only as indicated.
19. Will the government remove any and all contents from B‐3742 it wants to keep prior to NTP being issued?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE: Yes
20. Looking for clarification on whether or not all of the interior furniture will be removed by the government prior to the project being awarded.
NOTE: Government to remove furnishings.