This document is an amendment to a solicitation for the M-SART Site Work project located at Camp Lejeune. The amendment provides responses to contractor questions to clarify the scope of work. The contractor shall supply power from overhead lines to an underground transformer with a conduit stub-out from the concrete pad. Sidewalks have been removed from the contract scope. The contractor is not responsible for supplying power from the new transformer to the M-SART containers, as that work will be performed by others. The response deadline remains unchanged from the original solicitation. The Naval Facilities Engineering Command is the contracting agency for this Department of the Navy project numbered 20-0468 located at Camp Lejeune, North Carolina.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contractor_Environmental_Guide (003).pdf | ||
| 20-0468 M-SART DWG. rev 1.pdf | ||
| OPS DIV 01 SPECS 120215.pdf | ||
| 20-0468 M-SART SUBMITTAL REGISTER.pdf | ||
| RFP 200468.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFIC T ON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLIC TION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0001 12/09/20 20-0468
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1005 Michael Road Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-21-R-1222
12/04/20
20-0468 M-SART Site Work Amendment 0001, Answer Requests for Information
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-21-R-1222 Amen 0001
CONTINUATION SHEET
1. QUESTION: Sheet A3 states container and power shall be installed by others. So I am assuming we do not have any electrical work on this project. Is this correct?
ANSWER: Contractor shall supply power from the high lines to the URD transformer with secondary circuit conduit stub –out for future use from the concrete pad. Contractor shall not supply from newly install transformer to M-SART building, the supply power from transformer to M-SART container shall be installed by others.
2. QUESTION: Does the sidewalk referenced on sheet S1 note 1, get installed around the perimeter of the new containers?
ANSWER: All sidewalks have been pulled from contract, container shall be installed by others.
3. QUESTION: I do not see it shown on the plan, just the verbiage “ Provide 4”concrete sidewalk below the corricade metal of container”
ANSWER: All sidewalks have been pulled from contract.
4. QUESTION: Referring to the Drawings, page T1 has in the scope of work to provide electrical power to the M-SART containers. Page A3 Notes indicate that power shall be provided by others. Please, provide clarifications.
ANSWER: Contractor shall supply power from the high lines to the URD transformer with secondary circuit conduit stub –out for future use from the concrete pad. Contractor shall not supply from newly install transformer to M-SART building, the supply power from transformer to M-SART container shall be installed by others.