Amendment0005_20R0137.pdf

PDF 155 KB Posted

Attached to
P-1026 DESIGN-BID-BUILD AIR INTELLIGENCE SUPPORT FACILITY
Solicitation number
N4008520R0137
Issued by

View the file

Other files

File Type Posted
200820 - 072719_01-SELF-ADHERING AIR BARRIERS.pdf PDF
200820 - 072726-FLUID-APPLIED MEMBRANE AIR BARRIERS.pdf PDF
Amendment0004_20R0137.pdf PDF
Amendment0003_20R0137.pdf PDF
Amendment0002_20R0137.pdf PDF
Amendment0001_20R0137.pdf PDF
NEW SECNAV 5512.pdf PDF
1609142dwg02of02.pdf PDF
1609142spc01of01.pdf PDF
1609142dwg01of02.pdf PDF
Attachment C - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
General Requirements 20R0137.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.

NO.

PROJECT NO. (If applicable)

0005 08/25/2020

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-20-R-0137

9B. DATED (SEE ITEM 11)

07/23/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N40085-20-R-0137, P-1026 DESIGN-BID-BUILD AIR INTELLIGENCE SUPPORT FACILITY, OCEANA, VIRGINIA BEACH, VA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Laura Thomas laura.e.thomas4@navy.mil, Tel: 757-341-1624 Gary Milton gary.milton1@navy.mil, Tel: 757-341-2074

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:laura.e.thomas4@navy.mil mailto:gary.milton1@navy.mil

SF 30 BLOCK 14 CONTINUATION PAGE

The purpose of this amendment is to provide the following:

1. Response to PPIs

2. Extend the proposal due dates from 25 August 2020 to 27 August 2020.

1. Responses to PPIs:

PPI# Date

Submitted

LEAVE

BLANK

Reference Question

Page Section Paragraph Response

1 08/11/20 CS503 D5 Detail is showing approximately

14 concrete filled bollards, please indicate size desired (6" or 8")

Refer to CS101.

Provide 6 inch diameter bollards around pad.

2 08/11/20 IN201 Detail D1 & D2 show medalions, is the GC to provide or are these provided by the navy and

GC to install?

GC to provide and install.

Coordinate content with

NAVFAC.

3 08/11/20 IN601 The finish schedule is calling out the ceilings in the vestabule, jan closet and restrooms to be

ACT, RCP

shows them as painted GWB please clarify

Bid rooms 103, 103A, 104, 104A, 105 and 107A per

Reflected ceiling plan as shown on

A101.

4 08/11/20 Sheet S-

Sheet S-001, Foundation

Notes, note 3 indicates we are to provide a passive vapor intrusion system with a fluid applied membrane per specification section 07 27 26.

The specifications do not have a section 07 27 26

Fluid Applied

Vapor System, please provide this spec section.

See attached Spec

Sections; 07 27

26 FLUID-

APPLIED

MEMBRANE

AIR BARRIERS

& 07 27 19.01

SELF-

ADHERING AIR

BARRIERS

5 08/11/20 Cost-loaded

Schedule -

Please confirm this is still a requirement for this project?

Confirmed. A

Cost-Loaded

Schedule is preferred and required.

6 08/11/20 Where is the tie in point for the

DDC for the base? Is there a specific software program to be used for DDC?

Refer to

Specification

Section 25 10 10

UTILITY

MONITORING

AND CONTROL

SYSTEM UMCS

FRONT END

AND

INTEGRATION

3.4.5.3

Monitoring and

Control (M&C)

Software

Configuration

Configure the

Monitoring and

Control (M&C)

Software as specified, as indicated and as follows:

a. Set up M&C

Software user accounts and passwords.

Coordinate user accounts, passwords and permissions with

John McFadden

(757) 433-2627 or Charlie johnson (757)

433-2627.

Contractor to contact POC, which is, mentioned in the specifications

Charlie Johnson

757-433-2627.

Software/DDC

Vendor – Must be

BACnet.

7 08/11/20 It appear that a

Special Inspector of Record

(SIOR) is not required for this project. Please confirm

Confirmed. A

Special Inspector

Of Record is not required.

8 08/11/20 Understanding that the project is on a flight line, please confirm if

FA permits are a contractor responsibility.

No special FAA permitting required from the base perspective for construction of the building.

2. Receipt of proposals has been extended from August 25, 2020 at 2PM EST to Thursday, August 27, 2020 at 2PM

EST.