1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.
NO.
PROJECT NO. (If applicable)
0005 08/25/2020
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-20-R-0137
9B. DATED (SEE ITEM 11)
07/23/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N40085-20-R-0137, P-1026 DESIGN-BID-BUILD AIR INTELLIGENCE SUPPORT FACILITY, OCEANA, VIRGINIA BEACH, VA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Laura Thomas laura.e.thomas4@navy.mil, Tel: 757-341-1624 Gary Milton gary.milton1@navy.mil, Tel: 757-341-2074
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:laura.e.thomas4@navy.mil mailto:gary.milton1@navy.mil
SF 30 BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to provide the following:
1. Response to PPIs
2. Extend the proposal due dates from 25 August 2020 to 27 August 2020.
1. Responses to PPIs:
PPI# Date
Submitted
LEAVE
BLANK
Reference Question
Page Section Paragraph Response
1 08/11/20 CS503 D5 Detail is showing approximately
14 concrete filled bollards, please indicate size desired (6" or 8")
Refer to CS101.
Provide 6 inch diameter bollards around pad.
2 08/11/20 IN201 Detail D1 & D2 show medalions, is the GC to provide or are these provided by the navy and
GC to install?
GC to provide and install.
Coordinate content with
NAVFAC.
3 08/11/20 IN601 The finish schedule is calling out the ceilings in the vestabule, jan closet and restrooms to be
ACT, RCP
shows them as painted GWB please clarify
Bid rooms 103, 103A, 104, 104A, 105 and 107A per
Reflected ceiling plan as shown on
A101.
4 08/11/20 Sheet S-
Sheet S-001, Foundation
Notes, note 3 indicates we are to provide a passive vapor intrusion system with a fluid applied membrane per specification section 07 27 26.
The specifications do not have a section 07 27 26
Fluid Applied
Vapor System, please provide this spec section.
See attached Spec
Sections; 07 27
26 FLUID-
APPLIED
MEMBRANE
AIR BARRIERS
& 07 27 19.01
SELF-
ADHERING AIR
BARRIERS
5 08/11/20 Cost-loaded
Schedule -
Please confirm this is still a requirement for this project?
Confirmed. A
Cost-Loaded
Schedule is preferred and required.
6 08/11/20 Where is the tie in point for the
DDC for the base? Is there a specific software program to be used for DDC?
Refer to
Specification
Section 25 10 10
UTILITY
MONITORING
AND CONTROL
SYSTEM UMCS
FRONT END
AND
INTEGRATION
3.4.5.3
Monitoring and
Control (M&C)
Software
Configuration
Configure the
Monitoring and
Control (M&C)
Software as specified, as indicated and as follows:
a. Set up M&C
Software user accounts and passwords.
Coordinate user accounts, passwords and permissions with
John McFadden
(757) 433-2627 or Charlie johnson (757)
433-2627.
Contractor to contact POC, which is, mentioned in the specifications
Charlie Johnson
757-433-2627.
Software/DDC
Vendor – Must be
BACnet.
7 08/11/20 It appear that a
Special Inspector of Record
(SIOR) is not required for this project. Please confirm
Confirmed. A
Special Inspector
Of Record is not required.
8 08/11/20 Understanding that the project is on a flight line, please confirm if
FA permits are a contractor responsibility.
No special FAA permitting required from the base perspective for construction of the building.
2. Receipt of proposals has been extended from August 25, 2020 at 2PM EST to Thursday, August 27, 2020 at 2PM
EST.