This document contains a sources sought notice and project matrix for a federal contract opportunity. The Naval Facilities Engineering Command, Mid-Atlantic is seeking small businesses capable of performing a design-bid-build renovation of Building 13 at the Portsmouth Naval Shipyard in Kittery, Maine. The project matrix requests information on respondents' past experience with hazardous material abatement, interior and exterior renovation of buildings including temporary shoring of structural elements, adherence to historic preservation guidelines, multi-phased construction allowing facilities to remain open, and construction in congested urban areas with limited space. Respondents are asked to provide their bonding capacity, DUNS number, CAGE code, small business status, point of contact information, annual revenue, and number of offices.

View the file

Other files

File Type Posted
Contractor Information Form.docx DOCX document
Project Information Form.docx DOCX document
N4008520R0075 Sources Sought Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedProject Size (50,000 SF or > AND Construction Cost $8M or >)Scope: Renovation of masonry building at least three stories tall including removing interior structure while maintaining the exterior envelope.Complexity: Each submitted project does not require demonstrated experience with all of the following elements, but collectively, experience with all elements must be established throughout the submitted relevant projects.

(a) Hazardous material abatement;

(b) Interior and exterior renovation of a buildings including temporary shoring of structural loadbearing elements;

(c) Historic facilities and adherence to the Secretary of the Interior guidelines for selective demolition and renovation;

(d) Multi-phased/sequenced construction that allowed facility to remain open for operations throughout the project; and

(e) Projects in congested urban or industrial areas with limited construction laydown space and restricted access.

1
2
3
4
5
General Information:Bonding CapacityDUNSCageAddressSB StatusPOCPOC Contact InformationAnnual Revenue#Offices