Sources Sought Notice DD2 Portal Crane and Tunnel N4008520R0027.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Dry Dock #2 Portal Crane Rail Repairs and Dry Dock #2 Tunnel Repairs at Portsmouth Naval Shipyard in Kittery, ME
Solicitation number
N40085-20-R-0027
Issued by

View the file

Other files

File Type Posted
Contractor_Information_Form.docx DOCX document
Project Information Form.docx DOCX document
Sources Sought Notice DD2 Portal Crane and Tunnel N4008520R0027.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedProject Size: (10,000$ or greater)Scope: New construction, renovation, or repair of ground level crane rail systems or waterfront facilities including piers, wharves, dry docks, bridges, or tunnels.Complexity: Each project submitted does not require demonstrated experience with all of the following components, but collectively, they must demonstrate experience with all elements:

a) Experience with installation of ground level crane rail or other fixated rail system.

b) Experience with installation of deep foundation systems such as micro piles, H-piles, or rock socketed structural supports.

c) Experience with cast-in-place reinforced concrete foundation elements such as grade beams, pile caps, or footings.

d) Experience with complex, tightly controlled scheduling, sequencing and/or phasing requirements,

e) Experience with projects completed in highly congested, urban, or industrial areas with limited construction laydown space.

1
2
3
4
5
General Information:Bonding CapacityDUNSCageAddressSB StatusPOCPOC Contact InformationAnnual Revenue#Offices

File details come from the government source that posted it. Updated .