Pre-Bid Proposal Inquiry Form- GOVT. RESPONSES (1).xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- N4008520Q5899
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20Q58990002.pdf | ||
| SiteVisitRoster2-11-2020.pdf | ||
| 20Q5899A0001.pdf | ||
| WO-222854 Joint Repair BLDG. 2200 POWER POINT.PPTX | PPTX presentation | |
| Solicitation 20Q5899.pdf | ||
| D4017 sheet 4-detail.pdf | ||
| D4017 sheet 2-site view.pdf | ||
| Pre-Bid Proposal Inquiry Form (Template).xls | XLS spreadsheet | |
| D4017 sheet 1-cover page.pdf | ||
| D4017 sheet 3-location.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SOLICITATION NO. | |||||||
| PROJECT TITLE/LOCATION: | |||||||
| PREAWARD INQUIRY FORM (TEMPLATE) | |||||||
| NOTE: Extract Information from Government Preaward Inquiry Form to prepare this form. | |||||||
| Question No. | Date Received | REFERENCE | QUESTION | GOVERNMENT RESPONSE | Posted on Amend No. | ||
| Page | Section | Para. | |||||
| 1 | 2/13/2020 | 43 | 1.3 | Can we run diesel-powered equipment in the building? | Yes | ||
| 2 | 2/13/2020 | 43 | 1.3 | can we use fans minted on walls for ventilation or do we have to bring our own? | Fans mounted on the wall are for PPA personnel and will not be relocated for contract personnel. Supplemental ventilation for CTR to be provided by ctr. | ||
| 3 | 2/13/2020 | 43 | 1.3 | 1.1.2 | are cones with caution tape suitable for a barrier or do we need jersey barriers? | Onsite barriers will be inspected prior to start. I would anticipate a combination of both. In the area running from B-11 to the A-11 main door, anticipate jersey barriers. Directly leading from the main lobby and from small arms doors, I would anticipate 2 ea. 16' jersey barrier setups. Tape with 4" delineators not short cones is acceptable elsewhere. . | |
| 4 | 2/13/2020 | 43 | 1.3 | who is responsible for giving us a clean workspace tool tables moved, air hose coils removed from floor equipment that is being worked on? | The government (PPA Personnel) will move said equipment | ||
| 5 | 2/13/2020 | 41 | 4 | Will we be allowed to work at night shift? | Yes… at times required. | ||
| 6 | 2/13/2020 | 43 | 1.3 | is fuel tank storage on the base for diesel equipment allowed? | Yes. Double walled storage tanks, marked and placed in a spill containment area. | ||
| 7 | 2/13/2020 | 43 | 1.3 | if diesel equipment is allowed to be used? | Yes. | ||
| 8 | 2/13/2020 | 43 | 1.3 | will a staging area be provided | Yes. An area adequate will be provided but may be outside of the PPA fence line. | ||
| 9 | 2/13/2020 | 43 | 1.3 | 1.4.2 | what details can be provided for the joint sealer some areas are 3/4” wide other areas are 1 1/2- 2” wide. how deep would you like it to be cutting? what is an acceptable repair | No joint, other than those scheduled to be completely cut out and replaced are 1 1/2 to 2 inches. There is minor spalling on the sides of joint. As stated, cut joints to a depth of 1 1/2 inches, place backer rod and fill and level with Cold Applied, Single Component, Chemically Curing Silicone Joint Sealant for Portland Cement Concrete Pavements | |
| 10 | 2/13/2020 | 42 | 10 | has a chemical test been run on the existing joint sealer? can it be thrown away as normal construction waste or does it have to be treated as a hazmat waste? | The joint sealer is assumed to be none hazardous. However, prior to cutting out the joint contractor must take a sample to confirm. ** reminder that all cutting must be wet and slurry collected.** | ||
| 11 | 2/13/2020 | what is the anticipated start date for this project? | Mid March | ||||
| July 2011 |