Pre-Bid Proposal Inquiry Form- GOVT. RESPONSES (1).xlsx

XLSX spreadsheet 12 KB Posted

Attached to
BLDG 2200 Replace Concrete from A1-A10 in Crane way
Solicitation number
N4008520Q5899
Issued by

View the file

Other files

File Type Posted
20Q58990002.pdf PDF
SiteVisitRoster2-11-2020.pdf PDF
20Q5899A0001.pdf PDF
WO-222854 Joint Repair BLDG. 2200 POWER POINT.PPTX PPTX presentation
Solicitation 20Q5899.pdf PDF
D4017 sheet 4-detail.pdf PDF
D4017 sheet 2-site view.pdf PDF
Pre-Bid Proposal Inquiry Form (Template).xls XLS spreadsheet
D4017 sheet 1-cover page.pdf PDF
D4017 sheet 3-location.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SOLICITATION NO.
PROJECT TITLE/LOCATION:
PREAWARD INQUIRY FORM (TEMPLATE)
NOTE: Extract Information from Government Preaward Inquiry Form to prepare this form.
Question No.Date ReceivedREFERENCEQUESTIONGOVERNMENT RESPONSEPosted on Amend No.
PageSectionPara.
12/13/2020431.3Can we run diesel-powered equipment in the building?Yes
22/13/2020431.3can we use fans minted on walls for ventilation or do we have to bring our own?Fans mounted on the wall are for PPA personnel and will not be relocated for contract personnel. Supplemental ventilation for CTR to be provided by ctr.
32/13/2020431.31.1.2are cones with caution tape suitable for a barrier or do we need jersey barriers?Onsite barriers will be inspected prior to start. I would anticipate a combination of both. In the area running from B-11 to the A-11 main door, anticipate jersey barriers. Directly leading from the main lobby and from small arms doors, I would anticipate 2 ea. 16' jersey barrier setups. Tape with 4" delineators not short cones is acceptable elsewhere. .
42/13/2020431.3who is responsible for giving us a clean workspace tool tables moved, air hose coils removed from floor equipment that is being worked on?The government (PPA Personnel) will move said equipment
52/13/2020414Will we be allowed to work at night shift?Yes… at times required.
62/13/2020431.3is fuel tank storage on the base for diesel equipment allowed?Yes. Double walled storage tanks, marked and placed in a spill containment area.
72/13/2020431.3if diesel equipment is allowed to be used?Yes.
82/13/2020431.3will a staging area be providedYes. An area adequate will be provided but may be outside of the PPA fence line.
92/13/2020431.31.4.2what details can be provided for the joint sealer some areas are 3/4” wide other areas are 1 1/2- 2” wide. how deep would you like it to be cutting? what is an acceptable repairNo joint, other than those scheduled to be completely cut out and replaced are 1 1/2 to 2 inches. There is minor spalling on the sides of joint. As stated, cut joints to a depth of 1 1/2 inches, place backer rod and fill and level with Cold Applied, Single Component, Chemically Curing Silicone Joint Sealant for Portland Cement Concrete Pavements
102/13/20204210has a chemical test been run on the existing joint sealer? can it be thrown away as normal construction waste or does it have to be treated as a hazmat waste?The joint sealer is assumed to be none hazardous. However, prior to cutting out the joint contractor must take a sample to confirm. ** reminder that all cutting must be wet and slurry collected.**
112/13/2020what is the anticipated start date for this project?Mid March
July 2011