N4008519R9147_Project_Matrix.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
MODIFICATION TO SOURCES SOUGHT FOR P1800 1801
Solicitation number
N4008519R9147
Issued by

About this file

This document contains a sources sought notice from the Naval Facilities Engineering Command Mid-Atlantic for the design and construction of two operations centers at Camp Lejeune, North Carolina. Interested parties are requested to submit capability statements and project experience information by August 12, 2019 demonstrating experience with new construction projects over 150,000 square feet and $75 million or more in value involving multiple buildings constructed simultaneously or sequentially. The scope involves headquarters and administrative facilities, associated parking, and demolition of existing buildings. Responses should include a contractor information form and project matrix detailing a minimum of two and maximum of five relevant past projects completed in the last ten years. The government will determine if a small business set-aside is appropriate for this project prior to issuing a solicitation for design-build services.

N4008519R9147_Project_Matrix.xlsx

View the file

Other files

File Type Posted
N4008519R9147_Contractor_Information_Form.docx DOCX document
N4008519R9147_Project_Information_Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedProject $ Value ($20M or >)New Construction or RenovationIndustrial Production, Manufacturing, or Repair FacilityComplex phased and/or sequenced construction that required the offeror to provide a temporary facility (or facilities) during construction, along with the coordination and movement of personnel and equipmentLarge, industrial HVAC systems capable of maintaining prescribed temperature and humidity requirements with a total operating capacity of 30,000CFM or greaterExperience with complex, tightly controlled scheduling, sequencing and/or phasing requirementsModification or construction of site utility distribution systems; specifically, utility outages, traffic coordination, and/or temporary utilities that involved relevant utility systems, such as: steam and condensate, low-voltage electrical, compressed air, and/or fresh water
1
2
3
4
5

General Information: Bonding Capacity DUNS Cage Address SB Status POC POC Contact Information Annual Revenue #Offices #employees

File details come from the government source that posted it. Updated .